2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
ISOL-SRS project.
Discussion. Help Needed for Splice Consolidation Opening and closing W (20 FTE’s) Repair, reinstall and tack PIM’s (2) Orbital machining of M sleeves.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
Space for Nicole Maria J. G. Borge & Magdalena Kowalska.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Nuclear Astrophysics with the PJ Woods, University of Edinburgh.
Potential Portuguese Contributions to the ESS Project Areas and topics of interest for the ITN Pedro Vaz (ITN) Workshop “Towards a Portuguese Participation.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
PH Dept News Long shutdown 1: Baseline Project Project Leader Freddy Bordry Injector shutdown Dec 2012-Mar 2014 means 1 year stop for ISOLDE Physics LS2.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Bericht zu Thorsten Kröll KHuK-Jahrestreffen
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
The status and future prospects Fredrik Wenander, ISOLDE workshop 26/ Outline 1.Motivation and physics reach 2.Machine performance 3.Beam-line layout.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
The Stripping Foil Test Stand in the Linac4 Transfer Line
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Report on technical study of Fredrik Wenander, TSR workshop 14/ Outline 1.Beam-line layout 2.Storage time REXTRAP 3.Upgrade of charge.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Maria J. G. Borge Beam Lines for HIE-ISOLDE. Status of HIE-ISOLDE 2 May 2010: 34 LoI submitted 1 Nov 2012: INTC endorsed the increase of 2 GeV-proton.
Mid Term Review Meeting, 26 September 2012M.AUGUSTIN1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
Status of the Design Study Richard Catherall EN-STI-RBS.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
Status of n_TOF Facility
Riccardo Raabe (IKS, KU Leuven) for the Collaboration INTC 01/02/2012 INTC-O-014 Storage ring facility at HIE-ISOLDE: Technical Design Report.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Mid Term Review Meeting, 26 September 2012A. Shornikov 1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
Workshop, 10/2012 “The Project”
ELENA installation and commissioning status
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
AWAKE proposals for BE/BI
LS2 LHC forward experiments
Superbeams with SPL at CERN
ELENA Extra Low ENergy Antiproton Ring
CERN-ISCC Meeting “Storage Ring Facility at HIE-ISOLDE”
Present and Future test facilities for High-intensity Targetry CERN
A. Herlert, CERN PH-SME-IS
EPIC UK funding situation
Presentation transcript:

2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva, February 14 th 2014

2 The idea Klaus Blaum 14 February 2014 ECOOL extraction injection resonator experiment

2 A storage ring at an ISOL facility Advantages With respect to in-flight storage rings High intensity Cooler beams Much faster With respect to “direct” beams Less background (target, beam dump) Improved resolution CW beam Physics programme Astrophysics Capture, transfer reactions 7 Be half life Atomic physics Effects on half lives Di- electronic recombination Nuclear physics Nuclear reactions Isomeric states Halo states Laser spectroscopy Neutrino physics  A world-unique installation! Klaus Blaum 14 February 2014 Woods Raabe Freeman Litvinov Zuber Volpe Flanagan Walker Borge Wolf Brandau Lestinsky

2 The history: 02/2012 Submission of TDR to the INTC in Jan’ : „The INTC strongly endorsed the TSR-TDR“ Klaus Blaum 14 February 2014

2 The history: 04/2012 Eur. Phys. J. Special Topics 207, (2012) Collaboration: 129 scientists from 47 institutions in 19 countries Klaus Blaum 14 February 2014

2 Physics programme Conveners Klaus Blaum 14 February 2014

2 The history: 05/ Approval of TSR by CERN Research Board CERN's Research Board gave skeleton* approval for allocating resources to the TSR project (building and transfer line(s)). *The adjective "skeleton" means that the end date is fuzzy, and no definite resources appropriation is made yet. A major milestone Thanks to Sergio Bertolucci, Paul Collier and Steve Myers for their encouraging support! Klaus Blaum 14 February 2014

2 Start integration study: 08/2012 Mandate of the TSR Integration Study Working Group (Paul Collier) Klaus Blaum 14 February 2014

2 Coupling to HIE-ISOLDE Possible TSR installation above the CERN service-tunnel Tilted beamline coming up from the machine Cost study: Eliseo Perez-Duenas GS/SE Jura (west) side Proposed layout to fit the TSR: Installation above the CERN service-tunnel Tilted beamline coming up from the machine. 36m 26m 4.73m above Isolde hall floor 10m (7m between floor and crane hook) service tunnel Courtesy E. Siesling Klaus Blaum 14 February 2014

2 Technical integration study * Study group E. Siesling, E. Piselli, F. Wenander  NEXT TALK Mandate - a report covering the following aspects should be prepared: An inventory of all equipment to be brought to CERN for installation. Initial estimates for the infrastructure needed for the ring and it’s transfer lines. This should include the overall space, power, cooling and safety needs. It should not include a detailed design of these systems. For each system a brief study of the equipment to be installed should be undertaken after discussion with the experts in Heidelberg and the concerned CERN groups. This study should include: The issues associated with the integration of the equipment into the CERN accelerator environment. The spare situation for the equipment together with any issues or recommendation concerning additional spares. A radiological assessment of the equipment in collaboration with RP. The control system presently used for the system and whether the control hardware must be replaced to meet CERN standards. Any specific costs associated with the initial installation, or the modification to meet CERN standards should be estimated. * Study running Sep 2012 to Aug 2013Presented to the RB in Nov Klaus Blaum 14 February 2014 Tremendeous amount of work done by the integration study team!

2 Conclusions and next steps ● A storage ring at an ISOL facility: a unique instrument First storage ring with ISOL-facility! ● Possibilities in atomic, nuclear, astro- and neutrino physics ● TSR matches the HIE-ISOLDE characteristics ● The technical aspects of the integration have been studied ● Now awaiting official response from the management… Klaus Blaum 14 February 2014

2 Thanks It is amazing to see what a strong collaboration and an excellent team can reach in about two years. I am sure will become a success story. WWW: Thanks a lot for your attention! Klaus Blaum 14 February 2014