A. G. Argentieri 1), E. Cisbani 2), S. Colilli 2), F. Cusanno 2), R. De Leo 1), R. Fratoni 2), F. Garibaldi 2), F. Giuliani 2), M. Gricia 2), M. Lucentini.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Construction and First Results of a Cosmic Ray Telescope M. P. Belhorn University of Cincinnati 12 June 2008.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
The Angra Neutrino Detector Detector, VETO and electronics conceptual design Laudo Barbosa (May 18th, 2006) Centro Brasileiro de Pesquisas Físicas (CBPF)
Design and First Results of a Cosmic Ray Telescope For Use In Testing a Focusing DIRC M. P. Belhorn University of Cincinnati The BELLE group at the University.
24-28 May, 2010 S. Mastroianni - 17th Real-Time Conference, Lisboa, Portugal ARGO-YBJ is a cosmic ray air shower detector based on a single layer of RPC.
Performances of a pixel ionization chamber to monitor a voxel scan hadron beam A.Boriano 3, F.Bourhaleb 2,3, R. Cirio 3, M. Donetti 2,3, F. Marchetto 3,
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
Characterization of Silicon Photomultipliers for beam loss monitors Lee Liverpool University weekly meeting.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Understanding Data Acquisition System for N- XYTER.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Large area photodetection for Water Cerenkov detectors PMm 2 proposal: Front End Electronics MAROC ASIC Pierre BARRILLON, Sylvie BLIN, Jean-Eric CAMPAGNE,
CLAS12 RICH Frontend Electronics CLAS12 RICH Frontend Electronics M.Turisini (JLab) P. Musico (INFN-Genova) E. Cisbani* (INFN-Roma/ISS) CLAS12 RICH Review,
Parallel Data Acquisition Systems for a Compton Camera
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
News on GEM Readout with the SRS, DATE & AMORE
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
1 Level 1 Pre Processor and Interface L1PPI Guido Haefeli L1 Review 14. June 2002.
ALIBAVA system upgrade Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia) 1 ALIBAVA system upgrade 16th RD50 Workshop, 31 May-2 June 2010, Barcelona.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Current Status of RICH LVL-1 Trigger Module Takashi Matsumoto and Ken Oyama Presentation Outline Topics Geometry of Trigger Tile Required function of RICH.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Update on works with SiPMs at Pisa Matteo Morrocchi.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Fabio, Francesco, Francesco and Nicola INFN and University Bari
CLAS12 – RICH RICH - TECHNICAL PARAMETERS PARAMETER DESIGN VALUE
E. Ponce2-1, G. Garipov2, B. Khrenov2, P. Klimov2, H. Salazar1
CTA-LST meeting February 2015
R. DeLeo1,A. G. Argentieri2,T. Bellunato3,M. Calvi3,E. Cisbani4,F
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
DCH FEE 28 chs DCH prototype FEE &
Frontier Detectors for Frontier Physics presented by Paolo Musico
Front-end electronic system for large area photomultipliers readout
Hellenic Open University
FPGA-based Time to Digital Converter and Data Acquisition system for High Energy Tagger of KLOE-2 experiment L. Iafolla1,4, A. Balla1, M. Beretta1, P.
The digital read-out for the CSC system of the TOTEM experiment at LHC
The Pixel Hybrid Photon Detectors of the LHCb RICH
Multianode Photo Multipliers for Ring Imaging Cherenkov Detectors
DEVELOPMENT OF A TOF-PET PROSTATE PROBE READOUT SYSTEM
PID electronics for FDIRC (Focusing Detector of Internally Reflected Cherenkov light) and FTOF (Forward Time of Flight) Christophe Beigbeder and Dominique.
The digital read-out for the CSC system of the TOTEM experiment at LHC
A multichannel compact readout system for
ASPID (Application of Silicon Photomultipliers to Imaging Detectors)
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

A. G. Argentieri 1), E. Cisbani 2), S. Colilli 2), F. Cusanno 2), R. De Leo 1), R. Fratoni 2), F. Garibaldi 2), F. Giuliani 2), M. Gricia 2), M. Lucentini 2), M. Marra 1), P. Musico 3), F. Santavenere 2), S. Torrioli 2) A multichannel compact readout system for single photon detection: design and performances Abstract Optimal exploitation of Multi Anode PhotoMultiplier Tubes (MAPMT) as imaging devices requires the acquisition of a large number of independent channels; despite the rather wide demand, on-the-shelf electronics for this purpose does not exist. A compact independent channel readout system for an array of MAPMTs has been developed and tested. The system can handle up to 4096 independent channels, covering an area of about 20  20 cm 2 with pixel size of 3  3 mm 2, using Hamamatsu H-9500 devices. The front-end is based on a 64 channels VLSI custom chip called MAROC, developed by IN2P3 Orsay (France) group, controlled by means of a Field Programmable Gate Array (FPGA) which implements configuration, triggering and data conversion controls. Up to 64 front-end cards can be housed in 4 backplanes and a central unit collects data from all of them, communicating with a control Personal Computer (PC) using an high speed USB 2.0 connection. A complete system has been built and tested. Eight Flat MAPMTs (256 anodes Hamamatsu H-9500) have been arranged on a boundary of a 3  3 matrix for a grand total of 2048 channels. This detector has been used to verify the performances of a focusing aerogel Ring Imaging Cherenkov (RICH) prototype using an electron beam at the Frascati (Rome) INFN National Laboratory Beam Test Facility (BTF) during the last week of January Data analysis is ongoing: the first results are encouraging, showing that the Cherenkov rings are well identified by this system. Triggering The system can be run self triggered or using an external strobe. The acquisition can be gated thus allowing synchronization with biometrical measurements in case of SPECT detectors. The MAROC on the FE generates 64 fast digital signals (HITs) if the corresponding anode value is above a common threshold. These information can be used by the local FPGA to strobe the analog signals. In the simplest scenario a logical OR of the HITs can start an acquisition, but this cannot be efficiently used in single photon applications due to the intrinsic FPMT noise. In the side figure a single HIT (on the right) triggers the analog acquisition (on the left) of a H-8500 FPMT (64 anodes device). This can be considered the 1 st level trigger, implemented at FE level. Additional improvements will include more sophisticated 1 st level trigger (i.e. majority findings) and boundary effects between different sensors at 2 nd level. The Electronic System The electronics structure, graphically represented in the figure, is organized according to a hierarchical scheme with a single main board, the Controller Board (CB), and several daughter boards, the Front-End boards (FE). Each FE completely handles 64 pixels or anodes using Flat Panel PMTs (FPMT). In the full configuration the system can handle 64 FEs reading out 4096 channels. The CB and FEs are connected by means of the BackPlane boards (BP) which give the mechanical support to the FEs and provide electrical connectivity. Up to 4 BPs can be connected to the CB. The used H-9500 (256 anodes FPMT) is directly connected to 4 FEs in order to reduce cabling and to optimize signal integrity. In the full configuration 16 H-9500 will cover an area of about 20  20 cm 2 with 4096 pixels. The CB implements a standard USB 2.0 link to communicate with a PC, running DAQ and analysis code. The FE is equipped with a VLSI chip called MAROC, developed by IN2P3- LAL institution from Orsay (F), which implements the analog processing of the signals coming from the FPMTs. A FPGA is used for handling:  MAROC configuration  analog data extraction and ADC conversion control  1 st level trigger  data transfer to the CB A complete detector Applications The system has been designed to equip detectors for small animal SPECT and for scintimammography. Have a look at F. Cusanno’s poster: “A novel high resolution, high sensitivity SPECT detector for molecular imaging of cardiovascular diseases”. In this case a good 2 nd level trigger algorithm is mandatory to efficiently identify interesting events, thus reducing the data rate. As reported the use in RICH detector is also possible, extending the detection range down to single photons. The data rate is mainly limited by the MAROC output multiplexer settling time: this gives an acquisition rate in the order of 20÷30 kHz, depending on the quantity of information needed to transfer (i.e. occupancy and zero skipping mechanism). Further work will be done to improve the overall performances. Conclusions & Future Work The system has proved to be effective in a test beam operation for the RICH configuration. SPECT detectors are in advanced realization phase: laboratory measurements are promising and clinical tests are foreseen soon. MAROC3 chip (the 3 rd version) prototypes are ready and will be available to the users later this year, extending the dynamics and including an internal ADC. Studies are in progress to use this system also for PET: to be efficient the coincidence trigger must be done externally in less than 100 ns, using the total charge information coming out from opposite detectors. The architecture of the system is consistent also with the new promising photon detectors: silicon photomultipliers (SiPM). These devices can, in fact, be used modifying only the front-end. 1) University of BARI (Italy); 2) I.S.S. ROMA (Italy); 3) I.N.F.N. Genova – via Dodecaneso, 33 – – GENOVA (Italy) Figure 2 Frontier Detectors for Frontier Physics In the left side picture 8 H-9500 are arranged on a boundary of a 3  3 matrix. Underneath of them the FE cards connected to the 4 BPs are well visible. The CB is placed at the bottom of this stack (not visible). This system has been used to collect Cherenkov light coming from an aerogel radiator. A 3D view of a complete run is shown in the right side picture. A H-9500 is not working and the data are not equalized; some area show inefficiencies; no pedestal subtraction has been performed. The plotted histogram is built comparing the analog data against a common fixed threshold. Despite the mentioned limitations the ring is well identified, showing the effectiveness of the system in single photon identification. Once the 1 st level trigger has been fired, the HITs information are transferred from all the involved FEs to the CB and a more sophisticated algorithm can be run. A topological finding algorithm is implemented: the process considers 8  8 (H- 8500) or 16  16 (H-9500) matrixes and identifies 2  2 spot in the matrix (bottom figure) or 2  1 spot on the edges (top figure). The pattern finding process is very fast: 350 ns are needed for HIT transfer (each fired FE) and 100 ns are needed to identify spots on a 16  16 matrix. In case of 16 H-9500 the 2 nd level trigger can be computed in about 2 ÷ 2.5 μ s. The rate drops of a factor >> 100 from 1 st to 2 nd level (strongly depending on application).