GLAST LAT ProjectMarch 24, 2003 6B Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 6B: Silicon Strip Detector.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Silicon Preshower for the CMS: BARC Participation
January 22, Run IIB Silicon workshop Purdue University Bortoletto Daniela, Bolla Gino, Canepa Anadi Hamamatsu testing I-V characteristics up to 1000V.
GLAST LAT ProjectPeer Review, March 24-25, D 1 Gamma-ray Large Area Space Telescope 7D: Tray test plans GLAST Large Area Telescope: GLAST Large Area.
Tracker SSD Ladder Preproduction Review Alessandro Brez Robert Johnson.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
Silicon Strip Detectors. Background Semiconductors Doping N-type, P-type.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Sensor overview Ulrich Heintz Brown University, Providence, RI 6/18/2015U. Heintz - Sensor Overview 1.
Status and outlook of the Medipix3 TSV project
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
Dahee Kim (Ewha womans university) for MPC-EX collaboration TEST OF MINI-PAD SILICON SENSOR FOR PHENIX MPC-EX.
Christina Hägemann,UNM Sensor Testing at University of New Mexico C. Hägemann, M. Hoeferkamp, D. Fields, A. Zimmerman, M. Malik VTX Meeting 03 June 2005.
Frank Lehner U Zurich Characterization of inner layer sensors DØ Inner Layer Sensor Production Readiness Review FNAL, 8/8/2003 M. Demarteau, R. Demina,
Quality Test of L1 sensors HPK 10 sensors –Tested all, 6 sent to Fermilab – Test structures, HPK 133 L00 CDF ELMA 9 sensors –Tested 6 of 9.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
2004/09/07 Junkichi Asai (RBRC) (Kieran Boyle (SBU))
DB/DAQ – to implement: …. still working on direct connection with Labview set-up obtain list of batches from DB get list of SSD in selected batch from.
QA Workshop at CERN 3-4 November Hamamatsu silicon detectors for high energy physics experiments Kazuhisa Yamamura*, Shintaro Kamada.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Summary of Si Strip Group QA Preparation & Schedule and Costs Abhay Deshpande Stony Brook University PHENIX VTX Detector Readiness Review Brookhaven National.
Heavy ion irradiation on silicon strip sensors for GLAST S.Yoshida, K.Yamanaka, T.Ohsugi, H.Masuda T.Mizuno, Y.Fukazawa (Hiroshima Univ.) Y.Iwata, T.Murakami.
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
Heavy ion irradiation on silicon strip sensors for GLAST & Radiation hardening of silicon strip sensors S.Yoshida, K.Yamanaka, T.Ohsugi, H.Masuda T.Mizuno,
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Status of Hamamatsu Silicon Sensors K. Hara (Univ of Tsukuba) Delivery leakage current at 150V & 350V number of defect channels wafer thickness & full.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
IFR Praha 2004, 16 th April 2004Václav Vrba, Institute of Physics, AS CR 1 Václav Vrba Institute of Physics, AS CR, Prague Silicon sensors status.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Introduction Robert Johnson.
Status of the Planar Edgeless Silicon Detectors Gennaro Ruggiero TOTEM Collaboration Meeting 09/11/2005.
GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept GLAST-LAT International Collaboration Meeting Roma,
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
GLAST Large Area Telescope:
Irradiation and annealing study of 3D p-type strip detectors
SuperB SVT Silicon Sensor Requirements
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Status of Hamamatsu Silicon Sensors
Presentation transcript:

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector Receiving and Inspection Alessandro Brez INFN Pisa Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS SSD Acceptance Testing LAT Tracker Silicon Strip Detectors go through two levels of testing: –QA provisions: LAT-CR-82 (released); Includes complete plan for verification of the requirements and specifications. –At the manufacturer, Hamamatsu Photonics (HPK): Detector IV curve (leakage current versus bias voltage) Detector CV curve (capacitance versus bias voltage) Test for bad channels (opens, shorts, broken capacitors) Specified in the procurement spec: LAT-DS-11 (released) –At INFN Pisa or INFN Perugia Measure alignment of the cut edges with the lithography (initial all SSDs but later changed to a sampling) Repeat IV and CV curves (all SSDs) Test methods: LAT-TD-85 (released) Dimensional and Electrical Test procedure: LAT-TD-527 (released)

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS SSD Lot Testing Sample testing done on structures fabricated on the same wafers as the SSDs. See LAT-CR-82 for the details of the plan. At the manufacturer (Specified in LAT-DS-11): –Resistance of poly bias resistor and aluminum electrode –Manufacturing traceability data, including yield By LAT institutes (Hiroshima University): –Radiation tolerance ( 60 Co exposure) –Wire-bonding pads –Coupling capacitance –Capacitor breakdown voltage –Interstrip capacitance –Strip isolation

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS SSD Receiving & Inspection Detailed procedures are in LAT-TD-527 Carried out on identical equipment operated by –INFN Pisa (in Pisa) –INFN Perugia (in Terni) All work is done in Class-100k clean rooms (actually better) and conforms with the Tracker contamination control plan, LAT-MD-228 Includes Visual, Dimensional, and Electrical Inspections Resulting data are analyzed and compared with HPK data. Data are archived in the Tracker Fabrication Database (MS Access); Summaries are available on the Pisa web site. Nonconforming wafers are set aside for review and possible rejection and negotiation with HPK. Status (March 7, 2003): –5261 SSDs received –4304 tested; 165 reviewed; 38 rejected

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Dimensional Inspection Specified dicing tolerance:  20  m Tolerance achieved: <  15  m Moved to sample testing: –3 SSDs from the lot are measured –If any of the 3 show deviations >10  m, then all SSDs in the lot are measured SSD Fiducial Marks Dicing accuracy of the first 1689 flight SSDs

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Electrical Tests Individual strips are not contacted (was done at HPK) Measure IV and CV of the detector as a whole to verify HPK results _ + Switch positions: 1=I-V curve 2=C-V curve _ + KEITHLEY 2410 Source Meter FIXTURE AGILENT 4284 A LCR Meter Bias pad SSD CHUCK

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Leakage Current Specification: leakage current <500 nA at 25  C and 150 V

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Depletion Voltage (from CV curve) Specification: full depletion at less than 120 V bias.

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS HPK data statistics: defects analysis bad strips/total strips=72/  10 -4

GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS Conclusions The SSD dimensional and electrical inspection procedure is well under way (> 38% complete). The results confirm the high quality of the HPK SSDs. The dicing accuracy is more than adequate for our ladder assembly methods, which rely on mechanical alignment. Very few wafers fail the stringent electrical requirements. The second test site (Terni) is fully operational, so there will be no conflict between this activity and other Tracker fabrication activities. The testing is well ahead of (and can easily keep up with) the ladder assembly, so there are no schedule issues with this procedure.