GRIC Case Study Permit Review Dan Blair, Compliance and Enforcement Mgr. Gila River Indian Community (GRIC) Department of Environmental Quality.

Slides:



Advertisements
Similar presentations
New Source Review (NSR) Program Basics
Advertisements

Richard (Rick) Goertz, P. E
Reshaping Power Generation New EPA Rules and NAAQS CPES Energy & Environmental Conference March 14, 2012, Cromwell Ct Robert V Bibbo, Normandeau Associates.
Major Sources Pollutant Federal NSR 112(g) Major Major ROP Major PSD Major Offset Attainment Pollutants 250 or 100 NANA100 Non-Attainment Pollutants NA100NA100.
Southern Environmental Law Center Georgia Air Summit May 4, 2006.
Informational Meeting Status of Glades Power Park Air Construction Permit Application April 24, 2007 Moore Haven, Florida State of Florida Department of.
1 Air Quality Impact Analysis and Other PSD Requirements Donald Law U.S. EPA Region 8.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
RGVSG RENEWABLE ENERGY PROJECT FACT SHEET COMMUNITY OUTREACH PROGRAM.
Boiler MACT and Other Air Developments 2011 Southern Section AWMA Conference Callaway Gardens, GA Boiler MACT and Other Air Developments 2011 Southern.
Tribal Air Quality Collaborative Efforts. Overview  Ak-Chin Indian Community (ACIC)  Air Quality Program  Tribal Collaboration.
Best available control technology (BACT) requirements
Salt River Pima-Maricopa Indian Community Environmental Protection & Natural Resources Air Quality Program.
New Source Review (NSR) Program Basics and Highlights of the Proposed Tribal Major Nonattainment and Minor NSR Rules Laura McKelvey, Jessica Montañez,
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
Clean Air Act and Permits
Enforcement Case Study Daniel Blair, Compliance and Enforcement Mgr.
1 Air Quality “101” Workshops January 10, 2006 * Salina January 19, 2006 * Wichita January 24, 2006 * Overland Park Vick Cooper, Section Chief Bureau of.
How Ozone is Regulated under the Clean Air Act Darcy J. Anderson AZ Dept. of Environmental Quality.
Air Quality 101: Clean Air Act Overview/ Update. 2 Origins of the Clean Air Act Historic air pollution Donora, Pennsylvania, – PSD, tribes.
Air Quality Regulations and Academic Institutions Steve Hall Environmental Engineer II NC DENR – Division of Air Quality Raleigh Regional Office.
Proposed Revisions to Colorado Air Quality Control Commission Regulation No. 7 Garry Kaufman Air Pollution Control Division Air Pollution Control Division.
NEGOTIATING ENVIRONMENTAL PERMITS Steven Lacoste Lee, Futrell & Perles, LLP September 2014 – University of New Orleans.
American Legislative Exchange Council America’s Clean Air Success Story and the Implications of Overregulation November 28, 2012 Thomas W. Easterly, P.E.,
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
1 Improving Environmental Protection and Reducing Administrative Burden North Carolina Division of Air Quality Improving Environmental Protection and Reducing.
PERMITTING ELECTRIC GENERATING UNITS Jim Linville & Erik Hendrickson Air Permits Division.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Air Quality 101 Kansas Air Quality Program overview.
1 Gila River Indian Community By Will Antone III, Air Quality Specialist.
© Jeffer, Mangels, Butler & Marmaro LLP 1 Programmatic New Source Review November 2, 2005 Malcolm C. Weiss Jeffer, Mangels, Butler & Marmaro LLP 1900 Avenue.
What is the purpose of the Class I Redesignation Guidance? Provides guidance for tribes who are considering redesignating their areas as Class I areas.
1 GRIC Tribal Implementation Plan Development Dan Blair, Air Program Mgr. Gila River Indian Community (GRIC) Department of Environmental Quality.
Navajo Nation Operating Permit Program
Kimberton, PA | Kennesaw, GA | Strategic Air Planning: Is the Time for a PAL Here? Mark Wenclawiak, CCM|
1 GRIC TAS Development Process Dan Blair Compliance and Enforcement Mgr. Gila River Indian Community (GRIC) Department of Environmental Quality.
SCAQMD Air Quality Permitting for Emerging Technologies Jay Chen, P.E. South Coast Air Quality Management District November 4, 2009 Southern California.
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
Permit Programs Laura McKelvey, EPA/OAQPS Dan Blair, Gila River Indian Community.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Ondrea Barber GRIC DEQ Executive Director
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
One Tribe’s Approach to TIP Development: The Gila River Experience Dan Blair, Air Quality Specialist Gila River Indian Community Department of Environmental.
PSD/Nonattainment Review You can do this! Marc Sturdivant Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015.
New Source Review Rules Update Jessica Montanez U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Policy Division.
BART SIP Development: Example from Colorado Rocky Mountain National Park WRAP IWG Meeting, Denver, CO August 29, 2007 Presented by: Ray Mohr and Curt Taipale.
Ozone Transport that Impacts on Tribal Land: Case Study Stan Belone Salt River Pima-Maricopa Indian Community.
Wingra Engineering, S.C.1 Evaluation of Gas Turbine Air Quality Impacts from a Community Perspective Steven Klafka, PE Wingra Engineering, S.C Electric.
Clean Air Act SAFE 210. Purpose Protect public health and regulate air emissions Addresses both stationary and mobile sources.
Permitting and National Ambient Air Quality Standards Changes Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Navajo Nation Air Quality Control Program Operating Permit Program Navajo Nation Environmental Protection Agency Route 112 North/Bldg Fort Defiance,
Treatment as a State Willard Antone III, (Air Quality Specialist) Gila River Indian Community (GRIC) Department of Environmental Quality.
Air Pollution Challenges Kentucky Coal Association April 29, 2013 Thomas W. Easterly, P.E., BCEE Commissioner Indiana Department of Environmental Management.
How Tribes Use Models Part 1 Navajo Nation Environmental Protection Agency.
WESTAR 2003 Fall Technical Conference Introduction to Class I Area Impact Analyses September 16, 2003 John Bunyak National Park Service.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
RGVSG RENEWABLE ENERGY PROJECT FACT SHEET PUBLIC PARTICIPATION MEETING JANUARY 23, 2003 The RGVSG propose to construct a $23.8 million Clean Energy and.
Regulatory background How these standards could impact the permitting process How is compliance with the standards assessed.
PSD/Nonattainment Applicability Arturo J. Garza Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2016.
First in Service First in Value
Clean Air Act Glossary.
GRIC Air Quality Program
Overview of New Source Review (NSR)
Major New Source Review (NSR) Part 2
Boiler Sheltered Initiative
Kansas Air Quality Seminar March 5, 2008
Major New Source Review (NSR)—Part 1
Presentation transcript:

GRIC Case Study Permit Review Dan Blair, Compliance and Enforcement Mgr. Gila River Indian Community (GRIC) Department of Environmental Quality

Background: Gila River Indian Community  Akimel O’odham (Pima) & Pii Pash (Maricopa)  Located in Maricopa & Pinal counties  Established in 1859 by Executive Order  374,000 acres  Population 15,500 people (on- reservation)

GRIC Permit Review  Received Notice of Proposed Power Plant from Pinal County (2001)  GRIC does not currently have authority under Section 505 (Courtesy Notice)  Public Notice Contains General Information of Proposed Project (see handout “Public Notices”)  GRIC contacted Pinal County AQCD for complete copy of Permit Application

GRIC Permit Review (cont.)  Received Proposed Permit Application from Pinal County (dated 2000)  600MW Natural Gas Fired Power Plant (peaking )  Simple Cycle Turbines  Option LM 6000 turbines  Option LM 6000 turbines and 2 GE FA turbines

GRIC Permit Review (cont.)  Facility major PSD source of NOx and CO > 250tpy  PM 10 and VOC < 250tons/yr but exceeds significance level and requires PSD review

GRIC Permit Review (cont.)  Pinal County in attainment for NOx, SOx, PM 10 and VOCs  Pinal County AQCD is agency responsible for permitting facility  Facility must obtain  PSD Permit  Title V Operating Permit and comply with Title IV Acid Rain requirements

GRIC Permit Review (cont.)  Title V operating permit required because NOx, CO, PM 10 and VOCs > 100tpy  Facility also subject to Title IV, Acid Rain requirements due to > 25 MW capacity

GRIC Permit Review (cont.) Sundance Energy (Proposed) Annual Emissions 12 GE LM 6000 SPRINT Turbines (Permit App) NOxCOPM 10 SOxVOC Annual total tons/yr (12 Units) Annual total tons/yr (12 Units) Annual total tons/yr (12 Units) Annual total tons/yr (12 Units) Annual total tons/yr (12 Units)

GRIC Permit Review (cont.)  Permitee proposed in application that  SPRINT atomized water spray system increased efficiency and  Reduced emissions to level of Best Available Control Technology (BACT) or 25ppmvd  Annual potential emissions based on 6500 hours/year at 100% load  HAPs emissions calculated < major source thresholds

GRIC Permit Review (cont.)  Emissions modeled to determine impacts on  Visibility  Soils  Vegetation in two Class I areas within 100 km Superstition Wilderness Area (55km) and Saguaro West National Park (75km)  PSD Class II increment analysis for Nox conducted  Ambient Air Impacts below ambient air quality standards and PSD Class II significant levels for all pollutants

GRIC Permit Review (cont.)  Why GRIC concerned  Modeling indicated highest area of pollutant impact on eastern ridges of Sacaton Mountains within GRIC (NOx & PM 10 )  Hig- impact area near town of Sacaton  Permit proposals for additional power plants (18) in greater Phoenix area  Other Turbine plants proposing SCR for NOx control to 5 ppmvd

GRIC Permit Review (cont.)  GRIC submitted comments (see Handout) concerning  High NOx emissions  Cultural concerns  Adverse air quality impacts  Pinal County reevaluated BACT analysis in response to GRIC comments, required facility to install SCR, reducing NOx emissions from proposed 25 ppmvd to 5.0 ppmvd

GRIC Permit Review (cont.)  Total NOx emissions reduced from tons/yr to max of 448 tons/yr

Conclusion  When commenting on a permit, pick a pertinent issue to comment on  Emissions  MACT, BACT, LAER  Pipeline/power line issues  Cultural issues  Transport of fuels  Water availability, etc.

Conclusion (cont.)  Comments simply stating you don’t want plant built will be ignored