Celebration of Dorfan/Hitlin Panofsky Prize January 13, 2016 Thoughts on PEP-II and Jonathan Dorfan.

Slides:



Advertisements
Similar presentations
LHCb Eduardo Rodrigues University of Glasgow SUPA Lectures, Glasgow, January 2011 Part IV CP violation and B Physics Part IV CP Violation and B Physics.
Advertisements

CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
A View from NSF The Early Years of CESR David Berley University of Maryland May 31, 2008 Two Aspects of Cornell’s Success in the International Arena of.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Sergio Grancagnolo Activity Summary 9 Jan work in BaBar The apparatus Physics with BaBar Data analysis.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
March 2000The First Data from BELLE1 First Data from BELLE HEP Seminar University of Chicago Daniel Marlow Princeton University March 13, 2000.
Is there synergy between ILC and SuperB? Steve Playfer University of Edinburgh.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Perspective from KEK M.Kobayashi ・ Activities of KEK ・ Japanese contribution to oversea activities ・ Linear Collider.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Charge for the MEIC Ion Complex Design Mini-Workshop Andrew Hutton Jan. 27 & 28, 2011.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Thomas Jefferson National Accelerator Facility Newport News, Virginia, USA ELIC: A HIGH LUMINOSITY AND EFFICIENT SPIN MANIPULATION ELECTRON-LIGHT ION COLLIDER.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
1 Tunnel implementations (laser straight) Central Injector complex.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
F March 31, 2001David Finley / Fermilab Saturday Morning Physics Slide 2.1 Saturday Morning Physics - Accelerators Accelerators What’s Up Now? What’s Up.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
Report from Fermilab Presentation to ICFA Symposium Daegu, Korea September 2005 Pier Oddone.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
New Ideas for Super B Factories for Flavour Physics Steve Playfer University of Edinburgh, Future Directions, BEACH 2006 Lancaster, July 2006.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
EIC Users Meeting, SBU, 6/27/14 Polarized Electron Beams in the MEIC at JLab Fanglei Lin for MEIC Study Group EIC Users Meeting, Stony Brook University,
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
SLAC Accelerator Department Type A Investigation and PEP-II John T. Seeman Assistant Director of the Technical Division PEP-II MAC Meeting December 13,
2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Closeout Remarks 2nd Workshop on SuperB FRASCATI.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Prospect for an high energy factory at LNF P. Raimondi LNF Apr-10,2008.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Ben Cerio Office of Science, SULI Program 2006
WP3 status Interaction Region design
John T. Seeman DOE PEP-II Operations Review April 26, 2006
SuperB Injection, RF stations, Vibration and Operations
Third Workshop on GEMs for CMS
CLIC Civil Engineering Update
Status of ATF/ATF2 and machine schedule in this fall
Top-Up Injection for PEP-II and Applications to a Higgs Factory
Status of the VEPP-2000 Collider Project at Novosibirsk
Fill-pattern Control System for KEKB
Overview of SRF system of Ring and Linac (1)
LAL meeting on e+ studies, Oct. 2010
Licensing update ESHAC #9, October 2018
J. Seeman Assistant Director for PPA/LCLS
LINX LINear collider IR X-ing facility at SLAC Snowmass 2001 July 11 Andrei Seryi, SLAC for NLC collaboration.
Explanation of the Basic Principles and Goals
AC Power for a Super-B Factory
Details supporting the increase
Summary of Washington DOE Review
Welcome and Proposed Multi-laboratory Management Strategy for LCLS Jonathan Dorfan, Director April 23, 2002 LCLS DOE Review, April 23, 2002 Jonathan.
Super-B Factory in a “4400m” Tunnel
LCLS Personnel Protection System and Beam Containment System
Cost Algorithm for a Super-B Factory
Presentation transcript:

Celebration of Dorfan/Hitlin Panofsky Prize January 13, 2016 Thoughts on PEP-II and Jonathan Dorfan

Receiving a Prize of this caliber is a great honor but Receiving a prize that bears Pief’s name makes it doubly special As a scientist and administrator, I strove to emulate Pief’s unflinching dedication to:  Above all, the science must be outstanding  Technical innovation moves science/humanity forward  People are the most critical resource: respect & nurture them  International cooperation is essential to science  Never allow expediency to undermine integrity: stand firm for what is “right”

A Long Collegial and Personal Friendship : David was spokesman of my thesis expt., E92 at SLAC ~1980: MARKII Liquid Argon Calorimeter construction, testing, commissioning 1989 – : B Factory, PEP-II/Babar

Slide Courtesy of Pier Oddone

This led to at least 21e+e- B Factory concepts and proposals (19 Y (4S) + 2 Z0) and several hadronic machine approaches (HERA-B,.. Pier Oddone’s concept of using an asymmetric e+e- collider to boost the distance between the two decay vertices was, in the end, the most successful approach. Table Courtesy David Hitlin Two colliders, PEP-II and KEKB, were ultimately built Y ( 4S ) Storage Rings Y ( 4S ) Linac- Ring Collider Y ( 4S ) Recirculating Linear Collider Z Factory SymmetricAsymmetric PSI (2)APIARYGrosse- Wiesman n Amaldi/CoignetSLC NovosibirskCITARJLABARESLEP KEK accumulator PEP-IIUCLA CESR PlusPETRATBA ISR Tunnel KEK accumulator KEK-B CESR-B

Slide Courtesy of Pier Oddone

Early PEP-II Ring Layout (two tunnels) (1989) Page 7

Workshop in Chateau de Blois, Blois, France: Summer 1989 CP violation and beauty factories and related issues in physics

Workshop in Chateau de Blois, Blois, France: Summer 1989 CP violation and beauty factories and related issues in physics

SLAC Colloquium March 1990 – Two rings in one tunnel

1990

Sin2  ~ Sin2  ~ 0.95

1991

John O’Fallen: The believer The Sponsor : DOE On-Site Oversight Office Danny Lehman: Uber “Auditor”

The Funders : Congress

PEP-II Central Management Special Assistant Whatever Needed To Be Done Safety Data Management Administration

PEP-II Construction “System Managers” High Energy Ring Low Energy Ring Injection Controls RF Utilities Installation Backgrounds, Interaction Region

Sampling of Personnel That Worked on the Early Design And/or that were part of the Construction Team

e - (e + ) at end of New Injection Lines: Oct ’95 (97) e- beam through 1/3 of HER : May ‘97 Stored e- beam in High Energy Ring: June ‘97 e+ beam to Low Energy Ring Arc 7 Temp. Dump: Jan 98 Strategy of Staged Completion and testing of the major subcomponents with real beam

Measure/Characterize the backgrounds before Babar moved on line

U. Wienands, SLAC B-Fact. Symposium, 27-Oct-08 26

U. Wienands, SLAC B-Fact. Symposium, 27-Oct x10 34 /cm 2 /s !! 1875 mA/HER 2900 mA/LER 1722 bunches ≈154/fb

U. Wienands, SLAC B-Fact. Symposium, 27-Oct PEP-II Turned Off April

* October 27, 2008PEP-II BaBar SymposiumPage 58 PEP-II Team April 2008

Receiving a Prize of this caliber is a great honor but Receiving a prize that bears Pief’s name makes it doubly special As a scientist and administrator, I strove to emulate Pief’s unflinching dedication to:  Above all, the science must be outstanding  Technical innovation moves science/humanity forward  People are the most critical resource: respect & nurture them  International cooperation is essential to science  Never allow expediency to undermine integrity: stand firm for what is “right” These principles were all necessary, and more importantly, ever-present for the success of the PEP-II a adventure