Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
MSI-V J. Borburgh, B. Balhan, E. Carlier, J.M. Cravero, B. Goddard, D. Nisbet, P. Van Trappen, F. Velotti.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
MSIS 630: Week 13 System Implementation and Support
The CNGS Horns Electrical Systems The CNGS Horns Electrical Systems 4th workshop on Neutrino Beams and Instrumentation 7 – 11 November 2003 at KEK Gilles.Maire.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Additional Lift to Access ECA5 Etienne Carlier, Jean-Louis Grenard, Damien Lafarge SPS Dump Upgrade Meeting 09/07/2015.
J. Borburgh, B. Balhan, E. Carlier, S. Damjanovic, L. Ducimetiere, T. Masson, V. Mertens, A. Prost, L. Sermeus.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
STATUS OF NOKER PULSER FOR SHORT MAGNETS C. C. JENSEN DECEMBER 4, 2013.
ABT Consolidation Review Electronics & Controls Etienne Carlier
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Replacement of Obsolete/Old Hardware L. Ducimetière SPS Consolidation Review Luc Sermeus, Mike Barnes, Viliam Senaj, Thomas Kramer, Luis Feliciano, Vasco.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
MG - APC meeting 29/02/20081 MTE commissioning strategy and requirements M. Giovannozzi What is needed to implement MTE ScheduleCommissioning Acknowledgements:
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
V4.
Outcome of BI.DIS Fast Interlocks Peer Review
Data providers Volume & Type of Analysis Kickers
CT Hardware Overview and Issues
CONS and HL-LHC day Analysis of needs from BE-CO
Status and Plans for InCA
(Beam) Impact of MTE on the PS septa
EC Activities Status for LIU September 2017
AD consolidation activities in LS2
Injectors BLM system: PS Ring installation at EYETS
EC Activities Status for the LIU
AWAKE proposals for BE/BI
Possible causes for SPS ZS2 misalignment
MPE main activities planned for LS2
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
the CERN Electrical network protection system
TCM PS – SPS Thyratron Power Trigger Consolidation
Status with crucial LSS5 kicker transmission line cables
Proton Source and LEBT Luigi Celona & Lorenzo Neri
CONSOLIDATION CPS-BL SYSTEM
CONSOLIDATION CPS-BL SYSTEM
Aziz AMAMOU EACM – 21th May 2019
AC-Dipole Limitations and Options for its Upgrade
Presentation transcript:

Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid Dummy septum 15 “add-on” option o P+M resources o Summary

CAMAC eradication BE/CO has announced the stop of his support of CAMAC (hardware & software) for end of – CT extraction kickers use intensively CAMAC hardware for their integration within accelerator control system. They were not renovated as part of the D067 project in 1996 and left as installed in the 80’ as it was expected to disappear with the introduction of new MTE schema. – Before the end of LS1, TE/EPC will have completed the renovation of the last power converters still connected to the control system across CAMAC. CT extraction kickers will then be the last user of CAMAC. No spare and lost of expertise for CAMAC system within BE/CO. – Most CAMAC equipment date from early No new hardware (power supplies, fans…) was bought any more after – BE/CO hardware spares are already 25 years old at least. – Not more possible for BE/CO to provide (already today) reliable spare for the various CAMAC cards (SCC-L2, QUAD) or Single transceivers. MTE Workshop Electronics issues for MTE - E. Carlier - 03/10/2011  If CT has still to be operational after LS1, it has to be consolidated during LS1.

PPM limitations Full PPM operation successfully implemented on BFA9 & 21 pedestal generators in – Dynamic discharge of primary capacitor bank between 2 kicks. No full PPM functionality available on BFA9 & 21 staircase, ERD1 and ERD2 generators: – Limitation mainly on the kick strength in case large difference between 2 kicks (high to low): Partial discharge of primary capacitor bank after a pulse; – Implementation looks feasible: Technique still to be selected, Dynamic discharge mechanism or multiple resonant charging ; – Reliable operation of CX1159A thyratron with variable pulse amplitude still to be validated: Potential show-stopper. MTE Workshop Electronics issues for MTE - E. Carlier - 03/10/2011

MTE only Hardware: – Produced, tested and ready for installation; – Conservative approach for homogeneity with MTE1. Software : – Controller level developed and validated; – Integration within FESA ongoing; – Integration within INCA still to be studied into details (retrofit to MTE1) To be done: – Dismantling of unused CT equipment; – Consolidation of electrical distribution in B359 (Conformity with latest electrical norms); – Consolidation of installation safety (Personal & Equipment); – Full re-cabling of installations in B359 (Clean-up and eradication of non- halogen free cables). Open issue: – Can only be done during long shutdown (≥ 6months). MTE Workshop Electronics issues for MTE - E. Carlier - 03/10/2011

CT only Hardware: – Full consolidation needed of BFAs (pedestal and staircase) and ERDs; – Full consolidation of electrostatic 3M systems. Software: – Full consolidation needed (GM to FESA); – Full integration within INCA to be performed. To be done: – Complete set of new hardware to be produced (Possible reuse of some hardware from MTE only approach); – Consolidation of electrical distribution in B359 (Conformity with latest electrical norms); – Consolidation of installation safety (Personal & Equipment); – Full re-cabling of installations in B359 (Clean-up and eradication of non- halogen free cables). Open issue: – Can only be done during long shutdown – Resources not available in MTP for full CT consolidation (Can be partially retrieved from MTE only). MTE Workshop Electronics issues for MTE - E. Carlier - 03/10/2011

CT-MTE hybrid Full consolidation of CT Electronics & Controls mandatory for continued operation after 2012: – Eradication of obsolete hardware (CAMAC, electronics…); – Implementation of “full” PPM functionalities on CT equipment; – Conservative approach will be deployed for homogeneity with MTE1 & MTE only and uniform integration within INCA. To be done: – Complete set of new hardware to be produced; – As for MTE only, electrical distribution, installation safety (equipment and personal) have also to be consolidated and a full re-cabling has to be done. Open issues: – Rack space availability for Electronics & Controls in B359 for common exploitation of MTE & CT has to be studied in details; – Can only be done during long shutdown (≥ 6months); – Resources not available in MTP for the additional CT consolidation. MTE Workshop Electronics issues for MTE - E. Carlier - 03/10/2011

dummy Septum 15 “add-on” option Hardware for radial remote displacement system (position and angle): – Positioning system based on standard “SERVO” controller; – No specific development needed if required performance within actual specification of controller used for other ABT systems. To be done: – Production of hardware controller; – Integration within accelerator infrastructure (rack, cabling, electrical distribution…) – Integration within accelerator control system (FESA, INCA…). Open issues: – Resources not available within MTP but should be feasible if no specific development required. MTE Workshop Electronics issues for MTE - E. Carlier - 03/10/2011

Resources Requirements (P+M) Scenario and optionResources kCHF FTE Feasibility CT only* No PPM Only during long shutdown MTE only* Only during long shutdown CT-MTE hybrid* PPM operation of BFA9, BFA21 staircase, ERD1 and ERD2 generators to be confirmed Only during long shutdown Thinner septum-- No request Dummy Septum500.4 Resources (FTE) not available in MTP. Feasible if no specific developments required Faster kicker Included in FPS estimation Stronger kicker-- * Including B359 reshuffling (75kCHF + 1FTE) MTE Workshop Electronics issues for MTE - E. Carlier - 03/10/2011

Summary If operation of CT still required after LS1, a consolidation of actual CT Electronics & Controls is mandatory during LS1. Migration from CT to MTE only or to CT-MTE hybrid, as well as consolidation of CT only, can only be done during a long shutdown (i.e. ≥ 6 months). “P+M” resources for a consolidation of the actual CT Electronics & Controls (CT-MTE hybrid or CT only) are not available within actual MTP and will have to be allocated according to priorities. Roadmap should be decided by end of 2011 at the latest in order to prepare properly LS1 activity during MTE Workshop Electronics issues for MTE - E. Carlier - 03/10/2011

TE/ABT – Options Summary MTE Workshop Electronics issues for MTE - E. Carlier - 03/10/2011