FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/2015 1 CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.

Slides:



Advertisements
Similar presentations
LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
Advertisements

LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
3nd KEK-CEA Workshop on Superconducting magnets and cryogenics for accelerator frontier - 24/03/2009 Ceramic insulation for Nb3Sn accelerator magnets F.Rondeaux.
Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Eucard-WP7-HFM 10 th Collaboration Meeting at LASA Milano Status on SMC & RMC Models J.C Perez on behalf of SMC/RMC collaboration team.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
F. Savary. Click here to add footer 2 Outline Context Constraints & Boundary conditions Project plan Production strategy A few words on QA Conclusions.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
1 Short Model Coils George Ellwood, Simon Canfer Jan 08.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Meeting 04/09/2015.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay.
LARP Collaboration Meeting Racetrack Coil Fabrication
ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
11 T Dipole Status May 2012 M. Karppinen CERN TE-MSC On behalf of CERN-FNAL collaboration.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
CEA DSM Irfu - J-M Rey - EUCARD WP 7 Meeting - GRENOBLE 22/03/ HTS insert preliminary design and solenoid prototypes Mélanie Bruchon, Sandrine Cazaux,
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
ESAC R EVIEW OF THE HIGH FIELD DIPOLE DESIGN R EACTION O VEN, S PLICING AND IMPREGNATION M ARCH 2012 FOR E U CARD-WP7-HFM J.C. Perez on behalf of SMC collaboration.
D. Arbelaez for the LBNL LCLS SCU team Mar. 3,
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Responses to the recommendations of the first ESAC dipole review
Winding tests on Roebel cables
11 T Dipole Integration & Plans M. Karppinen
MCBXFB Short Orbit Corrector Prototype: Status update
ESAC Review February 2013 CEA Saclay
Development of the Canted Cosine Theta Superconducting Magnet
ERMC/RMM activities May 2017
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Mechanical stability and QXF coil winding
Analytical Cost Model (16 T dipole)
SMC Design overview of the construction and project issues
MQXF updates P. Ferracin October 9th, 2014.
QXF schedule and milestones
Presentation transcript:

FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting

Fabrication process – main steps 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting Conductor insulation Conductor preparation Winding Preparation for the heat treatment: –Assembly of the reaction mold around the wound coil –Transport to CERN Heat treatment Preparation for impregnation : –Nb 3 Sn/NbTi splice soldering –Instrumentation, ground insulation and quench heaters integration Impregnation Coil assembly Magnet assembly At / by Saclay At / by CERN

Coil manufacturing 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting Conductor preparation Winding Heat treatment Impregnation Instrumentation Tooling preparation if no gap Tooling preparation with gap Reaction mould assembly Tooling preparation with gap Cf. talk 7 Cf. talk 6 Cu coils SC coils Same winding process with tooling in one or 3 parts Experience with 2 copper coils and 4 prototypes 2 x 4 turns Spools Process Layer jump Voltage tapes : tbc Winding process (vertical compression: tbc) Dimensional control Reaction mould

Conductor preparation : validated 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting 1- all the required conductor on the transport spool ( = 135 kg) 2- conductor for the upper layer on the stock spool and layer jump zone defined

Layer jump 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting Cable installation in the layer jump groove

Winding process – lower layer 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting Lateral compression system used during the winding and to fix the lower layer

Winding process – upper layer 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting Interlayer insulation

Winding process – vertical stop 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting Vertical stop possible in each part of the coil

Reaction mould 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting

Thanks for your attention 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting

CC3401 : Cu coil type 3-4 CC1201 : Cu coil type 1-2 DR3401, DR 3402 : prototype 1:1 with RRP cable, 2 x 4 turns / dilatation test DP3401, DP 3402 : prototype 1:1 with PIT cable, 2 x 4 turns / dilatation test 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting

FRESCA 2 dipole magnet 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting

FRESCA 2 dipole magnet 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical Meeting