March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
April 7, 2010D.R. Lynch 1 PHENIX Shutdown 2010 April 7,2010 Don Lynch.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
IBL temperature analyses Bart Verlaat 22 April
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
C ONCENTRIC TUBE H EAT EXCHANGER TEST SETUP AT C RYOLAB CO2 FOR CMS T RACKER WEEK MEETING. Theodoros Katopodis PH-CMX.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
LHCb CO 2 cooling meeting Burkhard Schmidt – February 18,
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
Oct. 9, 2008W. Bertl - PSI BPIX Cooling with CO2 Assuming 3 or 4 Layers.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Phase 1 FPix Cooling Tube Testing Erik Voirin, C.M. Lei, Harry Cheung, Stefan Gruenendahl (FNAL) Kirk Arndt, Qiuguang Liu (Purdue) Phase 1 FPIX cooling.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
CMS Upgrade CERN April 27, 2010 W. Bertl PSI Power & Cooling: Design Status of BPIX.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
FPIX Upgrade – Status of CO 2 Cooling Studies S.Grünendahl, FNAL for the FPIX Upgrade Mechanical Group H. Cheung, G. Derylo, S.G., S. Kwan, C.M. Lei, E.
For the CMS Pixel detector
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Heat Exchangers and Condensers
Ti/SS transitions A.Basti INFN-PISA*
For the CMS Pixel detector
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Date of download: 11/12/2017 Copyright © ASME. All rights reserved.
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
Toward the final design of a TPC for the ILD detector
Pixel CO2 Cooling Status
Progress in the development of the CO2 cooling system
VELO Thermal Control System
Pixel Detector System (Barrel & Forward)
Silvan Steuli Roland Horisberger Stefan König CMS Upgrade Workshop
Status Report on Fermilab CO2 cooling activities
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
For the CMS Pixel detector
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI

March 19, 2013W. Bertl, PSI Where we stand now Bpix cooling pipes layout has been designed based on - expected power load beyond LS2 with up to 500 fb^1 int.luminosity (using measured data of present Bpix and extrapolated for upgraded Bpix) - thermodynamics of 2-phase CO2 -20 / +15 ºC using Thome correlations) - measured thermal conduction between coolant and sensor using a test setup (again scaled to upgraded system) - reasonable coolant flow rates and acceptable pressure drops Detailed technical drawings on Bpix piping exist (S.Streuli)

March 19, 2013W. Bertl, PSI Still to be done - Verification of power load for new ROC chips under extreme beam conditions (including a realistic supply tube layout  only small corrections expected) - Experimental verification of thermodynamic calculations with a 1:1 mock-up (using one of the final cooling plants) - Extending the experimental tests for asymmetric, accidental load conditions (like a sudden power failure on modules of one of the parallel cooling loops) - Determination of the dimensions of the capillary pipes preceding each parallel cooling loop - Testing the cooling down procedure under realistic conditions - Designing and testing of an emergency power break in case of cooling loss

March 19, 2013W. Bertl, PSI Current activity Construction of the 1:1 piping mock-up for half of Bpix. Technical drawings made by Silvan Streuli based on design considerations Construction at the University Zurich (P. Robmann and workshops) with 3D pipe bending outsourced to a Swiss company. Two systems will be built. One system for the +x shell, one for the –x shell seen from one z-side. (+x/-x loops are based on a very symmetric layout (based on power load) and will share main supply loops. Cooling behavior in case of cooling losses at one side can be studied. Between +z and –z there is a strong symmetry and the cooling loops are decoupled.)

March 19, 2013W. Bertl, PSI One of the two systems under construction Support disks to hold pipes in place - for suppy tube - for Bpix detector Some pipes already placed into position

March 19, 2013W. Bertl, PSI Bpix “flange”

March 19, 2013W. Bertl, PSI Supply Tube Connections

March 19, 2013W. Bertl, PSI Two loops on Supply Tube

March 19, 2013W. Bertl, PSI Two loops on Supply Tube

March 19, 2013W. Bertl, PSI Conclusion Mock-up construction: After difficulties at the beginning (wrong steel type, problems with small bending radii) the progress of the pipe bending company is good now. Most parts for one system are delivered. Small connection pieces and fittings are available. Completion of both piping systems (including leak testing) is expected for end of April. Then heating clamps and temperature sensors can be mounted (by R. Becker). Finally, the systems should be ready for operation tests using the Cern cooling plant.