30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
Superconducting Spoke Resonator Cavities and Cryomodules
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
An SRF Single Cavity Horizontal Test Facility Tom Peterson, Fermilab May 10, 2005.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
FNAL Meeting, July 2006 Basti, Bedeschi, Raffaelli, INFN-Pisa 1 ILC cryomodule mechanical work at INFN-Pisa  Ongoing work  Near term future  Manpower.
Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007.
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
19 July 2006 Vancouver Global Design Effort 1 Cryogenic Systems Review Tom Peterson for the cryogenics global group.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
RDR Linac Definition  Tasked Cryomodule & Cryogenics Groups with defining cryomodule length and cryoplant layout First pass generated at Jan CERN.
ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20 July 2007.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
ILC Cryogenic Systems Status and EDR Plans Tom Peterson 25 October 2007.
The integration of 420 m detectors into the LHC
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
Beijing ILC Workshop Global Design Effort 1 Main Linac EDR: Cavity & Cryomodule Discussion Lutz Lilje DESY.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
LCLS-II Cryomodule Design
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
The Evolving ILC Project
SPL RF coupler: integration aspects
CERN – Zanon discussions
WP5 Elliptical cavities
Roadmap for triplet cryostats
at STFC Daresbury laboratory
Meeting for S1-Global module design Cryomodule and Cryogenics
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
BDS Cryogenic System RDR Status and EDR Plans
Main Linac EDR: Cavity & Cryomodule Discussion
TDR: Cryomodule Paolo Pierini.
ILC Cryogenic Systems Draft EDR Plan
ILC Cryogenics -- Technical Design Report Planning
CEPC-650MHz Cavity Cryomodule
Presentation transcript:

30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources 30 May 2007

30 May 2007 DESY Cryomodule Discussion 2

30 May 2007 DESY Cryomodule Discussion 3 Main Linac Layout

30 May 2007 DESY Cryomodule Discussion 4 Main Linac Layout - 2

30 May 2007 DESY Cryomodule Discussion 5 Module numbers for ILC 634 standard cryomodules with magnet package 1180 standard cryomodules with no magnet package

30 May 2007 DESY Cryomodule Discussion 6 Type 4 Cryomodule (T4CM) 8 standard cavities, 1 quad magnet pkg Magnet under center post ILC size cryo pipes Bladetuner helium vessels Modified heat shields

30 May 2007 DESY Cryomodule Discussion 7 T4CM PIPING based on Type 3+

30 May 2007 DESY Cryomodule Discussion 8 Pipe size summary now (May 07)

30 May 2007 DESY Cryomodule Discussion 9 Pipe size summary (45 mm --> 60 mm) (50 mm --> 79.4 mm) (54 mm --> 72 mm) (50 mm --> 69.9 mm) (54 mm --> 56.1 mm) (300 mm ID is OK and effectively fixed)

30 May 2007 DESY Cryomodule Discussion 10 T4CM PIPING proposal

30 May 2007 DESY Cryomodule Discussion 11 Maximum allowable pressures Helium vessel, 2 phase pipe, 300 mm header –2 bar warm Limited by cavity detuning Issue for pushing warm-up and cool-down flows –4 bar cold Limited by cavity detuning Issue for emergency venting Shield pipes –20 bar Need high pressure for density to reduce flow velocities and pressure drops

30 May 2007 DESY Cryomodule Discussion 12 Earlier discussions - 1 SMTF collaboration meeting at Fermilab, 5 – 7 October Working group 2 (modules) notes and comments Cyromodule meeting at CERN, January 2006, from my notes Cryomodule meeting at Milan, January 2007, from my notes Various other meetings and discussions

30 May 2007 DESY Cryomodule Discussion 13 Earlier discussions - 2 General issues (2005) –Need to gain assembly and test experience within the collaborating labs (still true) –Also need to start work toward ILC module design; assembly work competes for resources but feeds into design. –Need specifications for type 4 –Particularly need design specifications for quad-steerer package with respect to centering, hysteresis, etc. (ILC magnet technical group has these)

30 May 2007 DESY Cryomodule Discussion 14 Earlier discussions - 3 Revise the intercavity connecting flange and bolting (or welding) arrangement, detail the new spacing (Ideas have been sketched, some work is being done) Alignment and positional stability –Need requirements (have these) –Measurement and verification of positions –Position of quadrupole (center, end, separate). Center is preferred basis for Type 4. (See 2005 notes.) –Integration of BPM with quad –Stability with shipping –Stability with thermal cycles –Vibrations

30 May 2007 DESY Cryomodule Discussion 15 Type 4 magnet position The largest change "on the board" right now in going from Type 3+ to Type 4 cryomodule is to move the magnet package to the center. –Goal is positional stability with respect to interconnect forces –Central location has some disadvantages. Magnet people are among the strongest proponents of retaining better access to the magnet package for in situ measurements and alignment checks. –If center position has no mechanical advantage, magnet should go back to end like type 3+ (our second choice) or to separate cryostat See Module Working Group Report 7 Oct 2005 –Need to assess the central position for the magnet package with data from Type 4 modules compared to Type 3

30 May 2007 DESY Cryomodule Discussion 16 Type 4 magnet package Magnet package status –Vladimir Kashikhin has designed a nested quad/corrector. –The first coil is being wound and a test is planned this summer in Fermilab’s vertical test dewar.

30 May 2007 DESY Cryomodule Discussion 17 Earlier discussions - 4 In any solution need quad-BPM-steerer package integration, including clean-room compatibility, an important engineering effort. Would like to see real BPM in type 3+. Active remote “movers” for quad alignment (not presently planned) Reliability –Vacuum feedthroughs –Tuner (fast and slow) Assembly –Industrialization –Cost reduction Labor (60 – 80 man-days now per module at DESY) Materials Designs, e.g., flanges

30 May 2007 DESY Cryomodule Discussion 18 Module-to-module interconnect Need layout for automatic end pipe welding Minimize space (850 mm vacuum flange to vacuum flange in TTF) Two beam vacuum isolation valves (each end of modules) HOM absorber in interconnect space 2-phase pipe to 300 mm header cross-connect in interconnect space CERN is interested in providing help in this aspect of the design but has not been able to provide the manpower due to LHC effort A mock-up is planned

30 May 2007 DESY Cryomodule Discussion 19 Earlier discussions - 5 Decide on pressure drop criteria and pipe sizes for the modules –Done Design a “segmentation” spool piece –Segmentation for warm-up and cool-down has been dropped Modify the slow tuner design to allow closer cavity-to- cavity spacing –Blade tuner! (Done) Modify the fast tuner design for proper piezo function –Designed (status?)

30 May 2007 DESY Cryomodule Discussion 20 Earlier discussions - 6 Design the support details for locating quad/corrector/BPM package under center post, but still hung from 300 mm tube –Done Select some possible quadrupole current leads and work out configurations for integration into module –Need this! (Idea is to follow XFEL plan to use modified CERN current leads, but no details yet) Design module end to accommodate the input coupler at the far end of the cryostat –Done

30 May 2007 DESY Cryomodule Discussion 21 Earlier discussions - 7 Vibrational analysis of the quad and cavity support structure –In progress, much has been done (see Vibration Stability measurements talk earlier today) Design for stability with shipping, analysis of shipping restraints and loads –Some preliminary work in progress, initially motivated by 3.9 GHz module Develop module test plans and module component test plans –Have concepts and DESY’s test examples Design of instrumentation for installation into the module –Some work but needs more –R&D module instrumentation versus production model

30 May 2007 DESY Cryomodule Discussion 22 Earlier discussions - 8 Conceptual design of separate quad cryostat –An alternate, not receiving attention Determine module slot lengths –Set equal for 8 cavity/magnet and 9 cavity –Our present slot lengths are a good “working assumption”, but –Ongoing, still may change with magnet and interconnect details

30 May 2007 DESY Cryomodule Discussion 23 Regional differences Cryomodules will not be identical in all regions –Regions should pursue different design concepts in parallel –However, it would be nice if they are compatible in having (almost) the same interconnect piping positions and dimensions, with those similar to XFEL. –We should agree on an interface spec –The most fundamental requirement for interconnect compatibility is that the beam tube position and 300 mm pumping line position relative to the vacuum shell be held the same; we should be happy if we have that!

30 May 2007 DESY Cryomodule Discussion 24 Design evolution Allow the ILC design to continue to evolve –Do not "fix" a design too early for fear of interfering with project start. –But Type 4 will have to be fixed this summer to allow procurement A "clean piece of paper" approach would require a major separate parallel build and test effort for validation, probably more than we can afford. Design should be validated with system testing as close to ILC conditions as possible before project start (lessons learned from LHC experience) Pre-production should have involved significant industrial participation. –But pre-project assemblies would not include full industrial production since the large-scale infrastructure probably cannot be completed so early.

30 May 2007 DESY Cryomodule Discussion 25 Possibility for Cost Optimization Cryomodule / cryogenic system cost trade-off studies –Additional 1 W at 2 K per module ==> additional capital cost to the cryogenic system of $4300 to $8500 per module (depending on whether we scale plant costs or scale the whole cryogenic system). (5 K heat and 80 K heat are much cheaper to remove than 2 K.) –Additional 1 W at 2 K per module ==> additional installed power of 3.2 MW for ILC or $1100 per year per module operating costs. –Low cryo costs relative to module costs suggest that an optimum ILC system cost might involve relaxing some module features for ease of fabrication, even at the expense of a few extra watts of static heat load per module. For example, significant simplification of thermal shields, MLI systems, and thermal strapping systems In Milan (January, 2007) we agreed that the 5 K thermal shield bridge at interconnects can be left out

30 May 2007 DESY Cryomodule Discussion 26 ILC Cryomodule T5CM? Industrial involvement for design for manufacturability The final ILC cryomodule will implement cost reduction designs: –New cavity end-groups –New cavity-to-cavity bellows, flanges, and seals –New helium vessels, possible stainless steel –Optimized cryogenic pipe sizes –Pipe locations may change. –New insulation scheme –Possible magnetic shield design change –Design modifications to resolve shipping concerns

30 May 2007 DESY Cryomodule Discussion 27 Other cryomodules 1300 MHz with multiple magnet packages –Only about 10 of these –All in the positron source –Consider dividing them to avoid longer than the standard cryomodule and simpler assembly Other frequencies –650 MHz cavity cryostats and crab cavity cryostats are so totally different from the main 1300 MHz cryomodules that they make very nicely separable work packages.