ME444 ENGINEERING PIPING SYSTEM DESIGN

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

PRESENTATION ON TURNKEY CONSTRUCTION.
Typical Plumbing System
Click to edit Master text styles – Second level Third level – Fourth level » Fifth level Integrated Solutions for Hospitality Projects.
REYSUPREMO03 COMPANY Reynold Garza Chapa
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
INTD 59 bathroom design basics. five basic steps in bath design 1.gathering client & project information 2.setting priorities 3.researching and selecting.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Expand your skills in Drafting & Design Profitability CADian Vertical Applications for the Mechanical, Piping, Structural & HVAC Professional.
Skyscraper Construction
Chapter 20 Plumbing Plans.
Piping and Instrument Diagrams
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Unit 204: Common plumbing processes
The Piping and Instrumentation Diagram Schematic of a control system –more detailed than process flow diagram –does not include values of parameters Used.
PROJECT AND STUDY DRAWINGS & DIAGRAMS
Standard Grade Graphic Communications
Engineering Manufacturing Facilities
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Economics – Why Today? Collecting data Additional information for request –Single vs multiple units –Quantity –Quality Future decisions Economic analysis.
Plan Review Required Materials [ARM (3)] – (a) a plan view and a sectional view of both the pool, spa, or other water feature or related facility,
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
HVACR116 – Trade Skills Mechanical Drawings.
MEP201 Mechanical Engineering Drawing 1st semester
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
 To understand the equipment you are working on you must have the following information…  What the system/equipment does under normal conditions 
Construction Drawing Occupational Safety and Fundamentals
Specification & Quantities Estimating
PIPETECH CONSULTANCY WELCOME TO PIPE TECH CONSULTANCY
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
HVACR116 – Trade Skills Symbols.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
HVACR116 – Trade Skills Symbols. Objectives After completing this unit, you will be able to identify and understand the meaning of the listed symbols:
Job Seeking Skills Identify jobs and job ethics associated with architectural drafting.
Trimble Buildings An example of a business strategy dependent on 3D indoor mapping and modeling Trevor Venter & Brent Godfrey November 2013.
Chapter 13 Estimates for Remodeling Work
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 1: INTRODUCTION.
Week 7 Legends and Schedules. Objective This chapter discusses legends and schedules: what they are, the components they are used for, and how to draw.
CEE 578 Senior Capstone Design Types of Construction Drawings
Introduction to Building Trades Denver High School.
Symbols and Room Finishes
IRC Research and Technology Forum B uilding I nformation M odeling by Bill Wiseman, P.E. Sr. V.P. Hixson Inc. Director of Operations.
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
Session 1: Identifying Construction Drawings and Drawing Components.
Upon completion of this module, you will be able to:
Process Layout Chapter #6.
BIM EXECUTION PLANNING PROCESS
Architecture, Civil Engineer, and Interior Designer
$150K Chicago/ANL seed funding for Braidwood site investigation
Job Seeking Skills Identify jobs and job ethics associated with architectural drafting.
Financing Land Development Projects
Pre-contract Planning and Practice
Typical Plumbing System
Commercial Construction Projects
BIM EXECUTION PLANNING PROCESS
ME444 ENGINEERING PIPING SYSTEM DESIGN
Introduction to Construction Drawings
Job Seeking Skills Identify jobs and job ethics associated with architectural drafting.
Job Seeking Skills Identify jobs and job ethics associated with architectural drafting.
Engineering Drawing Muhammad Zahid
Piping and Instrumentation for Process Industries
         D Engineering Drawings.
Construction Contracts
Technical Drawings.
Presentation transcript:

ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 3 : PIPE DRAWING AND FLOW THEORY

LAST SESSION PIPES VALVES ACCESSORIES PUMPS

CONTENTS PIPE DRAWING COST ESTIMATION

1. PIPING DRAWING DRAWING IS A UNIVERSAL LANGUAGE

TYPES OF PIPING DRAWINGS FLOOR PLAN SINGLE LINE DOUBLE LINE SCHEMATIC or RISER FLAT ISOMETRIC DETAIL DRAWING 2D 3D

SYMBOLS - FITTINGS

SYMBOLS – FITTINGS (2)

SYMBOLS - JOINTS

SYMBOLS - VALVES

SYMBOLS - FIXTURES

SYMBOLS – PIPES (1)

SYMBOLS – PIPES (2) MORE IN PUMPING STATION DESIGN

PIPING DRAWING - FLOOR PLAN

PIPING SYSTEM SCHEMATIC DIAGRAM (FLAT)

SCHEMATIC DIAGRAM (ISOMETRIC)

PROCESS SCHEMATIC DIAGRAM

3D PIPE DRAWING

DUCT DRAWING

DIMENSIONING

EXAMPLE CONTENTS OF WORKING DRAWINGS COVER LIST OF DRAWINGS LIST OF SYMBOLS EQUIPMENT SCHEDULE MASTER PLAN UTILITY OUTLETS (OPTIONAL) OVERALL SCHEMATIC (OPTIONAL) SYSTEM1 SCHEMATIC DIAGRAM FLOORPLAN(S) DETAIL/SECTION SYSTEM2 …

COVER

LIST OF DRAWINGS

LIST OF SYMBOLS

MATERIAL AND EQUIPMENT SCHEDULE

MASTER PLAN

UTILITY OUTLETS (OPTIONAL)

OVERALL SCHEMATIC (OPTIONAL)

MACHINE ROOM LAYOUT

SYSTEM1 SCHEMATIC

SYSTEM1 FLOOR PLAN

TYPICAL DETAILS

Advanced Pipe Design Software

BIM ready BIM = Building Information Modeling

2. COST ESTIMATION B.O.Q. B.O.M. OR BILL OF QUANTITY BILL OF MATERIALS MATERIALS TAKE-OFF FROM DRAWINGS MATERIAL + LABOR + PROFIT

B.O.Q.

B.O.Q. (cont’d)

SCOPE (MAY VARY) DESIGNERS PRODUCE TERMS OF REFERENCE (T.O.R.) DRAWING + TECHNICAL SPECIFICATIONS COST ESTIMATION CONSULTANTS ARRANGE BIDDING SITE SUPERVISION MATERIAL/EQUIPMENT APPROVAL PROJECT MANAGEMENT CONTRACTOR GET THINGS DONE ACCORDING TO THE T.O.R. OWNER PAY

HOMEWORK www.me.engr.tu.ac.th/HW3.dwg Draw schematic diagram of the soft water (SW-F) piping system. www.me.engr.tu.ac.th/HW3.dwg