Mechanical  Do the service agreement’s temperatures minimally satisfy your equipment’s needs? If not, it’s clearly a no go.  Confirm the typical repeat.

Slides:



Advertisements
Similar presentations
Cost Control in banking sector
Advertisements

Correctional Certification Subpart 1. Purpose: establish program certification requirements that govern facilities providing correctional program.
Total Productive Maintenance
MAINTENANCE MANAGEMENT Module 9
Steve Lewis J.D. Edwards & Company
KPI Familiarisation.
Food Safety Award of Excellence A Recognition Program for Food Establishments Practicing Exemplary Food Handling Practices.
The Performance Appraisal Welcome to Kathleen A. Razi, Ph.D. Razi & Associates, Inc. Razi & Associates, Inc. Presented by.
R2000 Homes Energy Efficiency Indoor Air Quality Ventilation.
CREDIT RECOVERY AND COLLECTION. CHALLENGERS 1.Longer repayment period 2.Higher loan limits 3.Higher monthly installments 4.Many cases handling cash in.
OPSM 639, C. Akkan Monitoring Progress How does a project get one year late? … One day at a time –Frederick P. Brooks MBWA: Management by Walking Around.
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
Microclimate Study Leom Sheng Teng(13),Tan Zhong Yi(21), Jovan Lee(09), Caleb Low(16) 2i2.
Chapter 17 The Ongoing Assessment. © 2005 by Thomson Delmar Learning,a part of The Thomson Corporation. All Rights Reserved 2 Overview  Ongoing Assessment.
Recovery CPSC 356 Database Ellen Walker Hiram College (Includes figures from Database Systems by Connolly & Begg, © Addison Wesley 2002)
Failure Mode and Effects Analysis
BEM class 3 Climate & Human Comfort. Class (lecture) objectives Appreciation of the indoor and outdoor environments and how they relate to our energy.
Productive Maintenance
What is RoofShade? Your best way to Go Green Your fastest way to reduce energy costs Your smartest way to extend roof life RoofShade is:
Chapter 19: Network Management Business Data Communications, 4e.
Ensuring Non-Functional Properties. What Is an NFP?  A software system’s non-functional property (NFP) is a constraint on the manner in which the system.
The Future of the Internet Jennifer Rexford ’91 Computer Science Department Princeton University
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
1 HIV Drug Resistance Training Module 9: A Systems Approach to Laboratory Quality.
Physical Assessment.
Technical requirements:
Computerised Maintenance Management Systems
CHAPTER OVERVIEW SECTION 5.1 – MIS INFRASTRUCTURE
International Cryogenic Materials Conference Tucson, AZ Mark Haynes and Paul Fabian June 29, 2015 SOFI/Substrate Integrity Testing For Cryogenic Propellant.
The AHU From A Case Study Presented by David Sellers Portland Energy Conservation Inc. INLAND EMPIRE CHAPTER 1 - 2/27/2002.
CHAPTER FIVE INFRASTRUCTURES: SUSTAINABLE TECHNOLOGIES
Managing the Facilities Asset Portfolio Prepared for the Tuition Policy Advisory Committee by The University of Texas Physical Plant September 10, 2003.
Module 5: Assuring the Quality of HIV Rapid Testing
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
BUILD WITH US. ™ 5S – The Foundation for Improvements Safety the “6 th ” S.
Welcome to Food Safety Plan Documentation and Record Keeping Heidi Dupuis, RD, SFNS ODE – Child Nutrition Ode.state.or.us/services/nutrition.
1 Nassau Community CollegeProf. Vincent Costa Session 7 Infrastructures Sustainable Technologies CMP 117 Business Computing: Concepts &Applications.
Module 4 Activity: Compare Quality Essentials to ISO 15189:2012 Checklist Sections.
“To Colo or not to Colo” Choosing the Right Solution a Critical Facilities Round Table presentation October 17,
What is quality control?
Architectural acoustics Acoustical materials. Sound absorber: Reapor Expanded Glass Granulate  Description  The sound absorber for challenging environments.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
–Try to establish good rapport with the interviewer. –Make sure each panel member is treated equally as important. –Remember all questions are important,
What It Means for Great Dane Customers Comprehensive Safety Analysis (CSA) 2010.
Database Design. The process of developing database structures from user requirements for data a structured methodology Structured Methodology - a number.
Reliability, Validity, and Bias. Reliability Reliability Reliability is the extent to which an experiment, test, or any measuring procedure yields the.
Safety Culture and Empowering Safety Robby Jones, Supervisor NC Department of Labor, OSHA.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 21 Slide 1 Software evolution 1.
Assessment. Workshop Outline Testing and assessment Why assess? Types of tests Types of assessment Some assessment task types Backwash Qualities of a.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Quality control & Statistics. Definition: it is the science of gathering, analyzing, interpreting and representing data. Example: introduction a new test.
Sensors and Control Applications 7 Rivers Robotics Coalition December, 2015 D. Foye.
Driver Violation Notification Study Presentation to: ITS America CVFM Homeland Security SIG Presented by: Jeff Secrist Federal Motor Carrier Safety Administration.
Computerised Maintenance Management Systems
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
If it’s not safe, don’t do it that way Engagement of Marine Surveyors Meeting with Vessel Agents.
1. 2 Human Factors in Software Engineering (HCI - Human Computer Interactions Alias MMI, Automation Boundary.
Greg Baker © Part One The Foundations – A Model for TQM Chapter # 1 Understanding quality.
Chapter 13 Risk Management. Chapter Objectives 1.Define risk and risk management 2.Outline key risk issues and types of risk 3.Identify concrete methods.
Industrial Radiography Equipment Need for a review of the effectiveness of the implementation of ISO 3999? IAEA Technical Meeting Vienna, June 2014.
2.1 Basic concept of data processing 2.2 Need for electronic data processing 2.3 Examples of electronic data processing 2.4 Effect of introducing computers.
QUALITY MANAGEMENT Suzanne Kamel-Mohamed PhD, MBA, MT (ASCP) Associate
Improve asset availability
Day 4 Planning a Program When you begin planning for the upcoming season try and keep the following thoughts in mind No individual has the same physical.
Total Productive Maintenance and Maintenance Management
KPI Familiarisation
Design Review ELEC 421.
The Quality Control Function
ISO 9001 – 2008 Changes Summary of Changes
Definitions Cumulative time to failure (T): Mean life:
Presentation transcript:

Mechanical  Do the service agreement’s temperatures minimally satisfy your equipment’s needs? If not, it’s clearly a no go.  Confirm the typical repeat occurrence, in years, of the outside temperature and humidity levels that exceed the system’s design ability to maintain the service agreement’s interior conditions?  Do the indoor and outdoor design conditions too greatly exceed your requirements, therefore cost too much?  Perhaps the facility’s rigor speaks well of the provider and the unnecessary benefit leads to only a negligible cost.  Or this design rigor may be an indication not to move into a colo provider and build your own more leanly designed facility. 1

Mechanical Reliability Through Time and Temperatures  Is the facility on the edge of disaster or does it employ multiple safety measures (2N vs N+2)?  What is the COLO’s history of failures?  Does the history reflect a key weakness of design, e.g. weather, redundancy, aging or poorly maintained equipment  How quickly and systematically were past failures corrected? 2 or

How quickly and systematically were past failures corrected?  Is there a tracking mechanism to record the mechanical state of all cooling equipment and ambient outside conditions before during and after any failures?  Does the provider routinely produce a root cause analysis for each failure, even if it did not interrupt service conditions, which is given to the customers?  Take a look at these to see how well they have been done. If the provider does not have the ability to provide these records, this is another no go indicator.  When the redundancy design level is absent, are all lessees guaranteed immediate notification? 3