1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.

Slides:



Advertisements
Similar presentations
S TEERING ALGORITHM EXPERIENCE AT CTF3 Davide Gamba 14 November 2013 The International Workshop on Future Linear Colliders LCWS13.
Advertisements

Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Probe beam distortion in TBTS due to high gradient RF acceleration (first part: observations) CTF3/TBTS Logbook 17 May 2013 Wilfrid Farabolini – Alexej.
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
General improvements Upgrades Loose collection of items Changed – being changed – to be changed CTF3 working meeting10/02/121.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Frank Tecker CTF3 Committee Last two months’ chronology Wed 23/03:first beam to end of TL1 Mon 28/03:beam to CR + factor 4 combination Thu 31/03:“near.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
1HG may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
Conclusions from CLIC (IWLC 2010, Geneva) Ken Peach (JAI) Comments.
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
R&D Programme for RT Phase Feedback Giulio Morpurgo.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
CTF Operations & Plans Piotr Skowroński for the CLIC Collaboration 27 January 2015 CLIC Workshop
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński Ben Constance Javier Barranco … 10 October.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
J.L. Navarro (CERN), for the CLIC/CTF3 collaboration.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
T. Limberg Position of the 3rd Harmonic System. Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg.
15 Oct 2008CLIC Workshop1 CTF3 Commissioning and Operation Simona Bettoni, Caterina Biscari, Roberto Corsini, Anne Dabrowski, Steffen Doebert, Andrea Ghigo,
1 General Status of Commissioning Piotr Krzysztof Skowroński CTF3 Collaboration Technical Meeting 27 January 2009.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
TBTS Test Program & Schedule G. Riddone
CLIC-ACE, Frank Tecker CTF3 program completion and upgrade to CTF3+ Frank Tecker – CERN for the CTF3 team CTF3 program completion and upgrade.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
R. Corsini, CTF3 results in /2/2011 CLIC MEETING 1 CTF3 Experimental results in 2010 R. Corsini for the CTF3 Team.
Two-Beam Test Stand results 5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program SLAC, Stanford, CA, USA Erik Adli, University.
1 CTF3 collaboration meeting Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
Status and plans for Two-Beam Test Stand and Two-Beam module in CTF3 Wilfrid Farabolini 1CLIC Workshop 3-7 January 2014.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CTF3 Drive Beam studies results & Program Piotr Skowroński for the CTF3 team 30 December 2013 CLIC Workshop
Oleksiy Kononenko CERN and JINR
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
2014 Issues & Strategy execution Piotr Skowroński 18 January 2016 CLIC Workshop
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30.
What is needed for the operation, the resources, infrastructure issues and plans for 2009 and beyond. Impact of short shutdown in 2010 Piotr Krzysztof.
Recent results from CTF3 Piotr Skowroński for the CTF3 Collaboration 22 January 2016 CLIC Workshop
CTF3 Brief Summary W. Farabolini on behalf of the CTF3 team W. Farabolini - CLIC Project Meeting #19119 Dec
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
XB-10 1st December 2010TBTS Status- Wilfrid Farabolini1 Status of the CLIC Two-Beam Test Stand 1.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CTF3 PROBE BEAM LINAC COMMISSIONG AND OPERATIONS
Piotr Skowroński for the CTF3 team
First Year of Operation at the Two-beam Test Stand
Status and progress of the CTF3 probe beam
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
Steering algorithm experience at CTF3
CLEX* Status and Plans CTF3 complex CLEX
Status and Interest of the X-ray FEL SINAP
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Have a chance to operate your own beam at CERN
CTF3 Collaboration Technical Meeting January 2008
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1

2 R. Corsini – CLIC Project Meeting CTF3 Update Conclusions 2 nd run of 2013 not very lucky: Problem with CALIFES cathode plug-in TWTs availability (from 2 ½ to 2, to 1…) – hope to be solved Delays in hardware components (in dogleg and feed-forward exp.) Some issues on klystron availability, operation manpower, infrastructure) However, good progresses in stability, repeatability, operational software, optics & procedures (not covered here)… Future schedule agreed upon, hardware problems on the way to be solved - will restart fast after the short Christmas break, all ready for an exciting 2014! 2 nd run of 2013 not very lucky: Problem with CALIFES cathode plug-in TWTs availability (from 2 ½ to 2, to 1…) – hope to be solved Delays in hardware components (in dogleg and feed-forward exp.) Some issues on klystron availability, operation manpower, infrastructure) However, good progresses in stability, repeatability, operational software, optics & procedures (not covered here)… Future schedule agreed upon, hardware problems on the way to be solved - will restart fast after the short Christmas break, all ready for an exciting 2014! From December 2013 Project Meeting From December 2013 Project Meeting

3 R. Corsini – CLIC Project Meeting CTF3 Update CALIFES : Fast successful repair, during winter short shut-down TWTs: 1 New one, from new supplier, 2 repaired. Now we have 3 fully operational + one spare. Ordering a second one from Poland. All 3 are working stably since January. Dogleg experiment: all hardware installed – start scheduled in summer Feed-forward experiment : amplifiers expected for Easter, all other hardware ready (will also receive two new phase monitors during 2014 – can start with present one only, and monitor phase in PETSs) Klystron availability: very good progress Operation manpower – still a bottleneck, but… An exciting 2014 has started! Status of last year issues

4 R. Corsini – CLIC Project Meeting CTF3 Update 30 Janfirst beam from gun 17 Febfirst beam in spectrometer 10 (3 GHz) 18 Febfirst 3 GHz beam in CR, first 1.5 GHz beam in linac 19 Febfirst CALIFES beam 21 Febfirst 1.5 GHz beam to CR 24 Febfirst combination 4 beam (1.5 GHz with phase switches) 26 Feb14 A (factor 4) extracted from CR 27 Febfirst beam in CLEX (uncombined) 4 Marfirst beam (3 GHz) to – and through – DL 5 Mar full combination factor 2 in DL (7 A) 13 Marbeam (uncombined) end of TBL / 3 GHz factor 4 optimized, 16 A 19 Marfirst drive beam to TBTS for Uppsala beam tests (factors 1 to 4) 21 Marfirst factor 8 recombination ~ 20 A 25 Margood factor 8, ~ 25 A ~1% stability 9 Aprtransport to TBTS, > 20 A Run 1 – summary until now

5 R. Corsini – CLIC Project Meeting CTF3 Update Status – 26 A in CR (factor 8)

6 R. Corsini – CLIC Project Meeting CTF3 Update Status – 26 A in CR (factor 8)

7 R. Corsini – CLIC Project Meeting CTF3 Update Status ~ 23 A through TBTS

8 R. Corsini – CLIC Project Meeting CTF3 Update Stability – Feedbacks Gun current feedback (plus flattening on request) RF compression system temperature (local + global) Local RF phase feedback on each klystron Injector feedback (MKS 2 and 3) RF amplitude flattening feedback Beam loading feed-back (MKS 5 to 15) TWTs feeback (extension of injector feedback) Energy feedback + energy flattening feedback (MKS15) Flattening of BPR 475… Gun current feedback (plus flattening on request) RF compression system temperature (local + global) Local RF phase feedback on each klystron Injector feedback (MKS 2 and 3) RF amplitude flattening feedback Beam loading feed-back (MKS 5 to 15) TWTs feeback (extension of injector feedback) Energy feedback + energy flattening feedback (MKS15) Flattening of BPR 475… A. Andersson, A. Dubrowski, T. Persson, P. Skowronski, L. Malina, D. Gamba…

9 R. Corsini – CLIC Project Meeting CTF3 Update energy flattening feedback (MKS15) BPR 475 flattening feedback Trips MKS02 & MKS 15 Disable MKS15 loading fb and inj. fb Stop energy flattening and BPR 475 D. Gamba

10 R. Corsini – CLIC Project Meeting CTF3 Update Emittance & optics – TL2 Still large Hor emittance Vert emittance small Suspect error in MTV 253 scan (calibration?) Stable Twiss parameters & optics in TL2 P. Skowronski, T. Persson

11 R. Corsini – CLIC Project Meeting CTF3 Update Stripline Drive Beam BPM in TBL (CERN-LAPP) Cavity Main Beam BPM in CALIFES/TBTS (CERN-JAI at Royal Holloway) Electro-optic bunch profile monitor in CALIFES (CERN-Dundee University) 2013 Goals R. Pan, T. Lefebre F. Cullinan, J. Towner, W. Farabolini, M. Wendt… CTF3 as diagnostics test bed

12 R. Corsini – CLIC Project Meeting CTF3 Update CALIFES F. Burkart, O. Stein, W. Farabolini Diamond beam loss detectors

13 R. Corsini – CLIC Project Meeting CTF3 Update CALIFES - bunch length compression CALIFES bunch length measured with streak camera, between 3 and 6 ps rms W. Farabolini, T. Lefebe, S. Mazzoni

14 R. Corsini – CLIC Project Meeting CTF3 Update TBTS A through PETS (factor 8) Up to 60 MW produced – halfway with On-Off mechanism Yesterday: about 50 MW in structure, no breakdowns Ongoing studies on DB deceleration, coupling etc… W. Farabolini, J.L. Navarro, N. Vitoratou, V. Ziemann, J. Oegren

15 R. Corsini – CLIC Project Meeting CTF3 Update TBTS – multipolar components W. Farabolini Unfocused beam through structure, No RF Zero crossing, Positive slope Zero crossing, Negative slope Positive crest Negative crest

16 R. Corsini – CLIC Project Meeting CTF3 Update first beam from gun beam in linac beam in CALIFES 16 A in CR – factor 4 7 A in DL factor 2 25 A in CR factor 8 Today 23 A in CLEX factor 8 CTF3 Schedule 2014

17 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Schedule 2014 Installation TBM / Maintenance klystrons

18 R. Corsini – CLIC Project Meeting CTF3 Update TBM Installation D. Gudkov, G. Riddone, H. Mainaud …