Status 1 Telecon MAVEN PFFSW STATUS 8/14/2012 Conf: 866-541-6330 #7064930.

Slides:



Advertisements
Similar presentations
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
Advertisements

1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
IMPACT Report SSMO Receiving Review– January 23, 2007.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
1 PFP MSR, 8/21/2012 Particles and Fields Package Monthly Status Review (MSR) August 21, 2012 Dave Curtis, PFP PM.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
1 PFP MSR, 11/15/2011 Particles and Fields Package Monthly Status Review (MSR) November 15, 2011 Dave Curtis, PFP PM.
1 PFP MSR, 3/20/2012 Particles and Fields Package Monthly Status Review (MSR) March 20, 2012 Dave Curtis, PFP PM.
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
ISUAL Instrument Software S. Geller. CDR July, 2001NCKU UCB Tohoku ISUAL Instrument Software S. Geller 2 Topics Presented Software Functions SOH Telemetry.
18-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Package Dave Curtis, PFP Package Manager Mars.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
Barbara PlanteFIELDS iPDR – DCB Flight Software Solar Probe Plus FIELDS Instrument PDR DCB Flight Software Barbara Plante UC Berkeley SSL
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
Software Project Management With Usage of Metrics Candaş BOZKURT - Tekin MENTEŞ Delta Aerospace May 21, 2004.
1 PFP QSR, 1/19/2011 Particles and Fields Package Quarterly Status Review (QSR) January 19, 2011 Dave Curtis, PFP PM.
1 PFP MSR, 3/15/2011 Particles and Fields Package Monthly Status Review (MSR) March 15, 2011 Dave Curtis, PFP PM.
1 PFP QSR, 10/18/2011 Particles and Fields Package Quarterly Status Review (QSR) October 18, 2011 Dave Curtis, PFP PM.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
1Sep 30-Oct 1, 2009EFW I-CDR Instrument Critical Design Review EFW Flight Software Peter R. Harvey 2009 Aug 31 RBSP Radiation Belt Storm Probes RBSP Radiation.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
1 PFP MSR, 2/14/2012 Particles and Fields Package Monthly Status Review (MSR) February 14, 2012 Dave Curtis, PFP PM.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
Control & Data Handling, Operator Control, Aircraft Interface to C&DH Steve Musko Space Physics Research Laboratory University of Michigan Ann Arbor, MI.
NPP High Rate Data (HRD) Broadcast: Preparing for the Future Timothy Trenkle Patrick Coronado October 6, 2005.
1 PFP QSR, 1/18/2012 Particles and Fields Package Quarterly Status Review (QSR) January 18, 2012 Dave Curtis, PFP PM.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
1 PFP QSR, 10/9/2012 Particles and Fields Package Quarterly Status Review (QSR) October 9, 2012 Dave Curtis, PFP PM.
GLAST LAT ProjectI&T Face-to-Face Online Presentation – May 30, 2002 R. Claus1 I&T Online Status and Plans Ric Claus.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
Networking with LabVIEW. Introduction To put it in simple terms, networking focuses on how to make computers “talk” to each other.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
1 PFP MSR, 2/14/2011 Particles and Fields Package Monthly Status Review (MSR) February 14, 2011 Dave Curtis, PFP PM.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
MAVEN Archive Overview J. Mafi PDSMC Face-to-Face Berkeley, California 18 November 2014.
System Software Design GPS Training System Jason Corbridge May 8, 2008 Western Washington University.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
1 PFP MSR, 9/18/2012 Particles and Fields Package Monthly Status Review (MSR) September 18, 2012 Dave Curtis, PFP PM.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
1 PFP MSR, 12/13/2011 Particles and Fields Package Monthly Status Review (MSR) December 13, 2011 Dave Curtis, PFP PM.
March 28, 2011 MAVEN SWEA instrument Pre-CDR Peer IRAP March 28-29, IRAP Management MAVEN SWEA Instrument Pre-CDR Peer Review IRAP, March.
11-1 MAVEN PFP ICDR May 23-25, 2011 PF Flight Software Critical Design Review May , 2011 Peter R Harvey Mars Atmosphere and Volatile EvolutioN (MAVEN)
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
1 PFP Team Meeting Particles and Fields Package Weekly Team Meeting, SSL April Dave Curtis, PFP PM.
11/3/2000cmd_soh1 SOH and CMD Current Status. 11/3/2000cmd_soh2 ISUAL Flight Software 0.0 SOH Telemetry CMD Input Debug I/O.
1 PFP QSR, 11/17/2010 Particles and Fields Package Monthly Status Review (MSR) November 17, 2010 Dave Curtis, PFP PM.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review RFAs and Recommendations Peter R. Harvey.
Operational Flight Software
Operational Flight Software
Working with MAVEN Data
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
University of California - Berkeley
I&T&C Organization Chart
Operational Flight Software
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Acceptance Test Review
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
CubeSat vs. Science Instrument Complexity
Presentation transcript:

Status 1 Telecon MAVEN PFFSW STATUS 8/14/2012 Conf: #

Status 2 Telecon Operational Status Interface Documents, Meetings, Deliveries CTM Delivery to LM (8/10/12 ) Development  Real-time checkout of SWIA on ETU Science Data  Collection Timing offset by 2 seconds (deferred)  Real-time checkout of SWEA on ETU Developed displays for SWEA Loaded EEPROM with LUT and RTS LUT load testing Science Data collection  Collection Timing  Real-time checkout of STATIC on ETU Developed displays for SWEA HV Ramps Slow HSK specification and development Loaded EEPROM with LUT and RTS LUT load testing Science Data collection (for EMC: Mass Hist and Rates packets only)  Collection Timing Changed Actuator Polling (to suppress noise in SEP detector) Testing SSR Flash Recording/playback of Science Data (in progress) Next Up  STATIC Science Data Packet verification  SSR Flash Recording/Playback  Operational code load leveling *** on ETU *** (DVF does NOT make enough messages)  Maximum telemetry rate operations ISSUES  Instrument teams are ignoring rules about command and telemetry rates  Instrument teams are ignoring the LUTs and loading their memories directly  Instruments Are Overloading the CPU with messages, Unlike Instrument Simulator

Status 3 Telecon SPRs and SCRs

Status 4 Telecon Charts CHARTS

Status 5 Telecon Op SLOC

Status 6 Telecon Module Status Chart

Status 7 Telecon Metrics Chart

Status 8 Telecon Margin Chart EEPROM size has been recalculated for April-May-June

Status 9 Telecon Margin Chart

Status 10 Telecon Defect Chart