Transmitter Performance Section Participants –LSU –NAVCEN –NAVCEN (West) –Peterson Integrated Geo-positioning, Inc –BAH LORIPP Meeting #2 Portland, OR.

Slides:



Advertisements
Similar presentations
Ultrasound sensors for micromoulding M. Kobayashi*, C.-K. Jen, C. Corbeil, Y. Ono, H. Hébert and A. Derdouri Industrial Materials Institute, National Research.
Advertisements

Loran Integrity Performance Panel The Loran Integrity Performance Panel Sherman Lo, Per Enge, & Lee Boyce, Stanford University Ben Peterson, Peterson Integrated.
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Long RAnge Navigation version C
U.S. COAST GUARD NAVIGATION CENTER FY 2003 LORAN PERFORMANCE LCDR MAX CARUSO, NAVCEN OPS.
Hazardously Misleading Information Analysis for Loran LNAV Dr. Ben Peterson, Peterson Integrated Geopositioning Dr. Per Enge, Dr. Todd Walter, Dr. Sherman.
Differential Loran Ben Peterson, Ken Dykstra & Peter Swaszek Peterson Integrated Geopositioning & Kevin Carroll, USCG Loran Support Unit Funded by Federal.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Transitioning to Time of Transmission Control in the U.S. Loran System ILA 2003 Boulder, CO Mr. Gene Schlechte CAPT Curtis Dubay, P.E. U. S. Coast Guard.
TREND DAQ proposal Version II. Trigger module (see C) Trigger inhibit Trigger bypass Threshold value Trigger order FPGA Antenna signal Ch1 Antenna signal.
The Game Plan for Loran-C Modernization John J. Macaluso U. S. Coast Guard Mitchell J. Narins U. S. Federal Aviation Administration International Loran.
LORAN C UPDATED: April 14, US EAST COAST CHAIN 1957 – 1965 MARTHA’S VINEYARD 41 20N – 70 49W Y CAROLINA BEACH Present N.
Avionics Engineering Center Characterization of Atmospheric Noise in the Loran-C Band Presented to the International Loran Association (ILA-32) November.
1 10/16/2014 HydroLynx ALERT2 Training How to upgrade your system to use the ALERT2 protocol.
LIBS Detector System Design & Preliminary Testing David Hahn, Tom Moskal, Ken Iida Department of Mechanical Engineering University of Florida July 9, 2001.
Loran Integrity Performance Panel Integrity Fault Tree for Loran Sherman Lo Second LORIPP Meeting Portland, OR September 23-24, 2002.
Mitigation of the Effects Early Skywaves Ben Peterson, Peterson Integrated Geopositioning & Per Enge, Stanford University Funded by Federal Aviation Administration,
A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.
CNS Systems, Inc. Communication, Navigation and Surveillance © 2002 CNS Systems, Inc. GPS Receiver Test Bed at USNO Prepared for the 34th Annual Precise.
V-1 Common-View LORAN-C for Precision Time and Frequency Recovery Tom Celano, Timing Solutions Corp LT Kevin Carroll, USCG Loran Support Unit Michael Lombardi,
V-1 TFE: The New Heartbeat of Loran T. P. Celano, Timing Solutions Corporation LT Kevin Carroll, Loran Support Unit.
Multiplexing GPS & eLoran on single RF cable for retrofit installations Benjamin Peterson Peterson Integrated Geopositioning International Loran Association.
Loran Integrity Performance Panel The Loran Integrity Performance Panel Sherman Lo, Per Enge, & Lee Boyce, Stanford University Ben Peterson, Peterson Integrated.
A Preliminary Study of Loran-C Additional Secondary Factor (ASF) Variations International Loran Association 31st Annual Convention And Technical Symposium.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
October 29, 2002 International Loran Association Design and Test of the First Article Accufix 7500 Transmitter Presented by Mark Danieli.
1 of 22 Glaciers and Ice Sheets Interferometric Radar (GISIR) Center for Remote Sensing of Ice Sheets, University of Kansas, Lawrence, KS
GPS based time synchronization of PC hardware Antti Gröhn
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
KICKOFF OF ASF DISCUSSIONS 1000 km  sec to 6  sec 400 to 1800 meters on a 1310 km --- up to 8  sec.
New Timing and Control Equipment At LSU Wildwood, NJ.
Enhanced LORAN Receiver (ELR) Kirk Montgomery – Symmetricom/Advanced Timing Solutions 2007 Convention and Technical Symposium - ILA-36 Orlando, Florida.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Front End DAQ for TREND. 2 Introduction: analog part 2015, feb 10 th.
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
LORAN TRANSITION Briefing to National PNT Advisory Board Captain Curtis Dubay, PE Department of Homeland Security U. S. Coast Guard Friday, October 5,
Hazardously Misleading Information Analysis for Loran LNAV Dr. Ben Peterson, Peterson Integrated Geopositioning Dr. Per Enge, Dr. Todd Walter, Dr. Sherman.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
1 Loran-C User Position Software (LUPS) Navigation Performance with the August 2001 Cross-Country/Alaska Flight Test Data Jaime Y. Cruz and Robert Stoeckly.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Status – U.S. Maritime Backup Issues Session 2, 28 October 2002 –Status & Plans of LORAN-C Service Providers 31st Annual Convention & Technical Symposium.
NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.
KHz-SLR PC Board Eastbourne, October 2005 for kHz SLR Complete PC Board.
General Licensing Class Voice Operation Brookhaven National Laboratory Amateur Radio Club.
Loran Integrity Performance Panel The Loran Integrity Performance Panel (LORIPP) The LORIPP Team Loran Team Meeting McLean, VA July 30, 2002.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Loran Update Mitchell Narins (US FAA) G. Thomas Gunther.
PMT Readout and Floor Triggering Charge estimation using the times over the thresholds Event Building and Triggering + multiplicity George Bourlis.
“Status of the Loran Recapitilization Project” FAA Team Meeting – July 2002 CDR G. K. Weeks Jr., U. S. Coast Guard, Commanding Officer USCG Loran Support.
Software development Control system of the new IGBT EE switch.
Philippe Picard 2 nd SKADS Workshop October 2007 Station Processing Philippe Picard Observatoire de Paris Meudon, 11th October 2007.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
LORAN Modernization Loran Data Channel Mr. Raymond Agostini International Loran Association Orlando, FL October 15, 2007.
Modernizing Loran Command and Control U.S. Coast Guard Loran Support Unit Pacific Ave. Wildwood, NJ Raymond Agostini James R. Betz International.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
Mini-GPS2 and Canopy GPS Synchronization
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
Data Collection Effort Objectives Time of Transmission (TOT) monitors Time of Arrival (TOA) monitors Pulse Analysis Measurements re UTC, & sign of delay.
LORIPP Meeting July 24-25, Implementing a LORIPP-Compliant Option in the Loran-C User Position Software (LUPS) LORIPP Meeting July 24-25, 2002 Jaime.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
Master independent, multi-chain navigation Requirement –Resolution of 200 usec cross chain lane ambiguities Ambiguities are 20 usec in Europe Would also.
Michael Lupberger Dorothea Pfeiffer
BCTW calibration status and future
Dual Tone Multi Frequency (DTMF)
Monitor and Control Software
Damping Ring Kicker Tests at AØ
Trigger Strategy for LOPESSTAR
Telecommunications Engineering Topic 2: Modulation and FDMA
Presentation transcript:

Transmitter Performance Section Participants –LSU –NAVCEN –NAVCEN (West) –Peterson Integrated Geo-positioning, Inc –BAH LORIPP Meeting #2 Portland, OR September 23-24, 2002

Tasking from LORIPP Meeting 1 TOTM calibration to USNO-UTC ABS threshold and time to blink from onset to fault, P(OOT w/o blink) Determine transmitted ECD and blink if OOT. Monitor requirements at transmitter and what certification requirements on monitors. Chain Operations (TOE verses SAM)

LRP Status NSSX sites –LSU –LORSTA George, WA –LORSTA Narrow Cape, AK –LORSTA Dana, IN SLEP TFE –MOD 5 –Delivery Feb 03

TOT Measurement System Digital Averaging O’scope Antenna current transformers Envelope Trigger Circuitry TrueTime XLDC GPS Timing Rcvr Event Time Input Computer RS-232 Temporary at antenna base Permanent USB Ethernet to LSU Temporary for calibration

Start of Pulse Standard Zero Crossing Strobe from Envelope Trigger

Start of Antenna Zero Transformer Time read from GPS receiver Oscilloscope Measurement (15.54us) 30 usec Zero Oscilloscope Delay: Transformer to Oscilloscope (148ns) Delay GPS to O’scope (15ns) Calibration value = – = us Example of Calibration (data is for Carolina Beach)

Note: * 133 = * 166 = sec.

Note: 8290M (Havre) off by 2.3usec per USCG TOTM and 0.1 usec per USNO. Note: 8970M (Dana) off by –0.9 usec per USCG TOTM and approx. 0 per USNO.

Pulse Analysis System Pentium PC w/ICS-650 (12 bit) or ICS-652 (14 bit) Prototype developed & tested at Baudette 9/05/ MHz P3, ICS-650 Logged TOT, ECD, and Amplitude of each pulse, no raw RF data Processed 2/3 of the PCI’s (one rate only) Will continue development on 2 GHz P4 w/ICS-652, log raw RF Antenna Current Transformer

Note: Outliers indicate need to log raw RF and visually verify why

Future Plans Visit to Seneca 8-10 Oct w/DCN (funded by NELS) –Effort to get common, worldwide, definition of what is meant by sync to UTC (presently 2.5 usec offset between USCG and NELS) Visit to Boise City –Test new pulse analysis system –2 usec Offset between USCG TOTM and USNO data Visit to Dana –Long transmission line to resolve sign of delay term Installation at what other secondaries? –TFE installation starts in Mar 03 in SEUS and will be about 1/month. Do we need the data now? –Gillette, Las Cruces, Searchlight, Middletown, etc. –Canada? –Have about 4 more GPS receivers available, do we procure more?

Conclusions TOTM system works well and is getting valuable data I have long felt that large secondary offsets in TOT may be due to offsets between published and actual emission delays –Hence a need for minimum of 12 months of data to establish new values to avoid large position jumps in legacy receivers when going to TOT control. –Getting this data now may enable earlier transition to TOT control –Large offsets may be in master TOT and new emission delays may be unnecessary