Working Group 4: Air Pollution Mr. Andres Markwitz ( LCC unavailable) Ms. Muhayatun Santoso (Indonesia) Ms. Preciosa Corazon Pabroa (Philippines) Mr. Joon-Keuk.

Slides:



Advertisements
Similar presentations
Development Alternatives SOUTH ASIA E N V I R O N M E N T O U T L O O K.
Advertisements

Maryse Robert, Director Department of Economic and Social Development Executive Secretariat for Integral Development San Pedro Sula, Honduras, September.
High Level Sub-regional Consultation on Advancing Action on Short Lived Climate Pollutants (SLCP) in Southeast and Northeast Asia 19 August 2014, Bangkok,
Session V: Programme Roles and Responsibilities
Katoomba Group Training Initiative Climate Change, Markets and Services Welcome and Introduction Course Introduction and Guidelines Participant Introduction:
Managing Project Risk.
The Quality Management System
Seite 1 1 Implementation of MEDISSA National Steering Committee Meeting Ashgabat 2 February, 2011 National Bureau for Drug Prevention Poland.
Why Assess Environmental Impacts? The Big Picture Why does environment matter?
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
1 JOINT RESEARCH CENTRE EUROPEAN COMMISSION IAEAPNRI Particle air pollution monitoring with nuclear analytical techniques: challenges and opportunities.
Update and future directions for prequalification of medicines WHO HQ, Geneva, 4 February 2008 Dr Lembit Rägo Coordinator Quality Assurance and Safety:
Contingency Planning and Emergency Preparedness Process and Practice PCWG Protection Cluster Coordination Training 2008.
Project Overview, Objectives, Components and Targeted Outcomes
Male’ Declaration Report on the progress since the Seventh Session of the Intergovernmental Meeting by Secretariat UNEP RRC.AP.
Senior Environmental Engineer
INNOVATION 2004 Prague, Nov. 30/Dec.1-3, 2004 The EUREKA Initiative: Assessment and Evaluation Procedures Svatopluk Halada EUREKA Secretariat, Brussels.
Malé Declaration on Control and Prevention of Air Pollution and its Likely Transboundary Effects for South Asia Regional Resource Centre for Asia and the.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
Regional Resources Centre For Asia and the Pacific 1 PROGRESS OF ACID DEPOSITION MONITORING NETWORK IN EAST ASIA (EANET) Ms. Adelaida B. Roman Coordinator,
Male’ Declaration Male’ Declaration Phase IV Implementation over the next 3 years by Secretariat AIT/UNEP RRC.AP.
A National approach to Cyber security/CIIP: Raising awareness.
RCARO Homepage Management - Current Status and Future Direction - July 15, 2010 Mr. Jin-Hyung KIM, Ph.D. Head, Administration Division RCA Regional Office.
Dr. David Mowat June 22, 2005 Federal, Provincial & Local Roles Surveillance of Risk Factors and Determinants of Chronic Diseases.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
The Use of Source Apportionment for Air Quality Management and Health Assessments Philip K. Hopke Clarkson University Center for Air Resources Engineering.
Male’ Declaration Work Plan in 2007/08 by Secretariat UNEP.
Malé Declaration Report on the Progress of. Malé Declaration: Phase IV Objectives Malé Declaration/IG11/2/1 1. Strengthen Regional Cooperation for addressing.
WAY FORWARD AND THE ROLE OF THE REGIONAL CENTER ON HEALTH IMPACT ASSESSMENT Regional Center for Air pollution Impact on Health Department of Occupational.
Technical Cooperation for Risk Reduction South-South Cooperation: Replicating the Risk Reduction Management Centre, a Cuban model UNDP - CRMI Jacinda Fairholm.
CAPACITY BUILDING ON ELECTRICITY REFORMS IN BANGLADESH, INDIA AND NEPAL (RESA PROJECT) (RESA – Regulatory reforms in Electricity sector in South Asia)
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
Experiences from Technology Needs Assessment and Related Activities by the CTI Elmer Holt, Vice Chair, Climate Technology Initiative Tobago Seminar – 14.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
Managing Smoke and Emissions. A new system for managing smoke and emissions in Victoria that will provide for coordinated: Investment Service delivery.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Male’ Declaration Male’ Declaration Review of Progress in Phase III by Secretariat UNEP.
Variations of Elemental Concentration in PM 10 and PM June 2007,Colombo. M.C. Shirani Seneviratne Head, Nulear Analytical Services Sec. Atomic.
The Male’ Declaration Proposal for Phase 4 Implementation.
Тренировъчна сесия София 23 – 24 февруари 2006 Specific measures in support of international co-operation Overall presentation of the Work programme Karina.
The Male’ Declaration Proposal for Phase III. Looking back to think ahead Policy Dialogue Background Materials Ministerial agreement Capacity building.
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
IAEA International Atomic Energy Agency Arusha, Tanzania Uganda Dr. Akisophel Kisolo Project Counterpart 2 – 5 December 2013 RAF9038 Final Coordination.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
ALUMANDA M. DELA ROSA Director Philippine Nuclear Research Institute.
Accelerator Based Techniques for Air Pollution Studies Across Asia David Cohen, ANSTO, Sydney, Australia
Malaysia National Workplan on IAEA/RCA “Strengthening Clinical Applications of PET in RCA Member States (RAS/6/049) Presented by: Dr. Mohamed Ali Abdul.
International Atomic Energy Agency Planning Meeting of the RCA Project on Establishing a Benchmark for Assessing the Radiological Impact of Nuclear Power.
A BRIEF OVERVIEW OF THE POLICY ISSUES CONCERNING THE RCA PROGRAMME PRINATH DIAS RCA COORDINATOR.
Prinath Dias Former RCA Focal Person.  A little history  The policies behind the achievements  Some thoughts for the future.
Report on SBSTA-43 John Bates NOAA, National Centers for Environmental Information (NCEI) NOAA/NESDIS 6th Working Group on Climate Meeting.
RCA-RO Workshop, ROK, Jeju, June 7-11, 09 Machi 1 Roles and Activities of RCA-RO Workshop on Partnership Promotion and Sustainable Development, 7-9 July,
Implementation of RCA Projects
Alumanda Dela Rosa RCA MTS Working Group Chair
RCA Project on Establishing a Benchmark for Assessing the Radiological Impact of Nuclear Power Activities on the Marine Environment in the Asia and Pacific.
Update on WHO and TFH activities
EIF Tier-2 Project (Component B):
5 OCTOBER 2015 MANILA, PHILIPPINES
Workshop on RCARO Future Strategies Seoul, Korea July 2007 RCA Participation in International Conferences Prinath Dias Senior Project Management.
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
Implementation Support
RA II Regional priorities
Forum for Air quality Modelling FAIRMODE ew. eea
Future Concepts Turning Water into Wine
Reliability Standards Development Plan
Strengthening the air quality management community in Asia
Building Organizational Capacity: An evaluation of
Roles and Responsibilities
RCA Workshop on RCARO Future Strategies July 2007
Presentation transcript:

Working Group 4: Air Pollution Mr. Andres Markwitz ( LCC unavailable) Ms. Muhayatun Santoso (Indonesia) Ms. Preciosa Corazon Pabroa (Philippines) Mr. Joon-Keuk Chung ( PAC Member) Mr. Roman Padillia-Alvarez (IAEA) Ms. Lan Anh Nguyen (IAEA) Ms. Dongxin Feng (PAC Member) Mr. Ho-Seung Lee (IAEA)

Key Comments 1. Revision of title and clearly define objective/outcome, outputs and activities 2. Possible new participating Member States 3. Clarification of Problem/Objective Tree 4. Define roles of each stakeholders and IAEA 5. Clearly define project milestones 6. Specify potential risks and mitigating measures

Original Title: Impact of Air Particulate Matter in the RCA region: Quantification of Key Sources and the Relationship between Major Components, Light Scattering and Visibility for Managers to Better Understand and Control Key Components  Revised Title: Assessing the impact of urban Air Particulate Matter on air quality Original Overall Objective: Improved understanding of key sources of urban fine particulate matter pollution in major cities across the RCA region impacting on human health, visibility and cultural heritage  Revised Overall Objective: To enhance capacity using NATs in assessing fine particulate matter impact on human health, visibility and historic monuments

Original Outcome: 1. Assessment of impacts from anthropogenic sources (local industries, coal burning for power production, manufacturing, motor vehicles, etc.) on fine particle urban air sheds using nuclear analytical technologies in relation with human health. 2. Establishment the new relationships between fine particle composition (black carbon, sulphates, nitrates, soil and other) with light scattering and visibility in the RCA Region. 3. Impacts of fine particulate matter pollution on cultural heritage objects identified.  Revised Outcome: Enhanced awareness on air particulate matter impact on human health, visibility and historic monuments

Original Outputs 1. Project team operational  National Seminars for information transfer of project objectives to end-users  Relationship between visibility and find particulate matter sources in RCA Member States identified  Applicability of nuclear analytical techniques for cultural heritage studies  Tools for populating database and results extracted from database  Gaps in fine particulate matter database filled by RRU services in case of equipment breakdown and urgency  Database of fine particulate matter source from anthropogenic sources in urban areas in the RCA region  Find filters loaded with air particulate matter  Manuals for GENT samplers and sites selection, XRF and IBA analysis of air particulate matter

Revised Outputs 1. Project progress review and regional cooperation strengthened 2. Trained personnel on impact of APM on human health, visibility and historic monuments 3. Reports/ scientific papers on APM impact on human health, visibility and historic monuments 4. Regional database updated with APM elemental contents and source profile mainly from densely populated urban areas

 Title: Assessing the impact of urban Air Particulate Matter on air quality  Overall Objective: To enhance capacity using NATs in assessing fine particulate matter impact on human health, visibility and historic monuments  Outcome: Enhanced awareness on air particulate matter impact on human health, visibility and historic monuments  Outputs: 1. Project progress review and regional cooperation strengthened 2. Trained personnel on impact of APM on human health, visibility and historic monuments 3. Reports/ scientific papers on APM impact on human health, visibility and historic monuments 4. Regional database updated with APM elemental contents and source profile mainly from densely populated urban areas

Problem Tree

Objective Tree

Work Plan Output/ Actvities/ Input ResponsibilityInputsFunding Source Quantity (Q) Rate (R)Budget (=QxR) StartEnd 1. Project progress review and regional cooperation strengthened 1.1 Mid-term review meeting IAEA/ MS Meeting IEX IAEA ,000 10,000 Q Final Coordination Meeting IAEA/ MS Meeting IEX IAEA ,000 10,000 Q Trained personnel on impact of APM on human health, visibility and historic monuments 2.1 National training course on source apportionment and identified impact on human health in priority countries MS NWS IEX MS IAEA , ,000 Q Q Regional workshop on impact of fine particulate matter on visibility IAEA RWS IEX IAEA ,000 5,000 51,000 10,000 Q Q Regional workshop on degradation of historic monuments due to APM impact (including end- users) * IAEA RWS IEX IAEA ,500 5,000 70,000 10,000 Q Q Regional workshop on database for source IAEA RWS IEX IAEA17 2 3,000 5,000 51,000 10,000 Q Q4 2017

Work Plan Cont’ Output/ Actvities/ Input ResponsibilityInputsFunding Source Quantit y (Q) Rate (R)Budget (=QxR) StartEnd 3. Reports/ scientific papers on APM impact on human health, visibility and historic monument 3.1 Provision of advice, operational procedure, sampler and supply to new participating countries as to expand the regional sampling network * MS IAEA Procurement IEX MS IAEA ,000 15,000 Q Q Q Q Sampling of air particulate matter in polluted urban air sheds. NAT for elemental analysis. Source identification/apportionment. Presentation of interpreted results to end-users. MS 000 Q Q Sampling of APM mainly at historic monuments locations. NAT for elemental analysis. Source identification/ apportionment. Presentation of interpreted results to end-users* MS 000 Q Q Regional database updated with APM elemental contents and source profile mainly from densely populated urban areas 4.1 Transfer of data and source apportionment information to database coordinator. MS 000 Q Q Gaps identified by data coordinator and national project counterparts and recommendation provided for elemental analysis. MS RRU servicesIAEA45,00020,000 Q Q Updated database through designate database coordinator IAEA IEX/ HBA(1 person/ year) TCF25,00010,000Q Q4 2018

Project Timeline Output/ Actvities/ Input Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 1. Project progress review and regional cooperation strengthening 1.1 Mid-term review meeting 1.2 Final Coordination Meeting 2. Trained personnel on impact of APM on human health, visibility and historic monuments 2.1 National workshop on source apportionment and identified impact on human health in priority countries 2.2. Regional workshop on impact of fine particulate matter on visibility 2.3 Regional workshop on degradation of historic monuments due to APM impact (including end-users) * 2.4 Regional workshop on database for sources 3. Reports/ scientific papers on APM impact on human health, visibility and historic monuments 3.1 Provision of advice, operational procedure, sampler and supply to new participating countries as to expand the regional sampling network * 3.2 Sampling of air particulate matter in polluted urban air sheds. NAT for elemental analysis. Source identification/apportionment. Presentation of interpreted results to end-users. 3.3 Sampling of APM mainly at historic monuments locations. NAT for elemental analysis. Source identification/ apportionment. Presentation of interpreted results to end-users* 4. Regional database updated with APM elemental contents and source profile mainly from densely populated urban areas 4.1 Transfer of data and source apportionment information to database coordinator. 4.2 Gaps identified by data coordinator and national project counterparts and recommendation provided for elemental analysis. 4.3 Updated database through designated database coordinator

Acknowledgement Dr. Andres Markwitz ( LCC unavailable) Ms. Muhayatun Santoso (Indonesia) Ms. Preciosa Corazon Pabroa (Philippines) Mr. Joon-Keuk Chung ( PAC Member) Ms. Dongxin Feng (PAC Member) PAC Team Ms. Lan Anh Nguyen (IAEA) Mr. Gashaw Wolde (IAEA) Mr. Andreas Karydas (IAEA) Mr. Roman Padillia-Alvarez (IAEA) Mr. Ho-Seung Lee (IAEA) Mr. Sinh Van Hoang (IAEA) Ms. Elise Ratschmann (IAEA) Ms. Daniela Izabal Nogueda (IAEA)