Photogrammetry Review Raphael Goudard Visit Nov 27 – Nov 30.

Slides:



Advertisements
Similar presentations
Debugging in End- User Software Engineering summarized by Andrew Ko Toward Sharing Reasoning to Improve Fault Localization in Spreadsheets Joey Lawrance,
Advertisements

Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.
Year 10 ISA Controlled assessment Week starting March 4 th 2013.
George Kovatchev Sitius Automation SITIU S Why Use the UG Model for Dimensional Control UG Users Group Conference Fall 2000.
Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.
Manufacturing Processes lab I Milling Machine- 2
V-STARS AUTOMATED MEASUREMENT Measurement and Record of Connecting Rods Lengths (Struts) in the A380 Wing Box TR21 AIRBUS Nantes France Speaker : N. ROMMAN.
Bell Ringer 12/1/14 What are the 3 Compositional Guides?
Vacuum Vessel Production Readiness Review
Monday 27 July 2009 CloudSat. Tasks for All Begin documentation in force Dani assemble water table Check GUI compatibility with Mac Molly finish sphere.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
1 CSSE 377 – Intro to Availability & Reliability Part 2 Steve Chenoweth Tuesday, 9/13/11 Week 2, Day 2 Right – Pictorial view of how to achieve high availability.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
Introduction to RobotStudio An Offline Robot Programming Tool Dr. Richard A. Wysk October 15, 2005
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
NCSX Metrology 1/7/04. Short term purchase recommendation Buy the Spatial Analyzer Software package –This software will be the user interface for operating.
Photogrammetry at WENDELSTEIN 7-X Unternehmung WENDELSTEIN 7-X Max-Planck- Institut für Plasmaphysik Torsten Bräuer1Meeting with NCSX, Greifswald,
(Tentative) Plan for Last Days of School. Friday 5/8 / Monday 5/11 Work on empathy final project Tuesday 5/12 / Wednesday 5/13 (MIN.) Work on empathy.
1 Programming Languages Tevfik Koşar Lecture - II January 19 th, 2006.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
A Secondary School For My Child. Apply If your child is due to start secondary school in September 2016 you can apply now. The national closing date for.
Trip Report from CERN and Wendelstein W7-X October 6 – 13, 2007 Michael Viola; Steve Raftopoulos; Bill Sands October 6-10 CERN Geneva, Switzerland October.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Comments from Rob Durham’s Visit September 24-25, 2007.
Gamma software Is it an E.R.P. ?. Behind the stage. The Software was specifically written for an Import-Export company. It took 1 and half months to write.
NCSX Metrology. Goals –Need to accurately make measure measurements for several NCSX systems Modular coil –As-built measurements of coil form –Conductor,
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
DATE# OF OCCURRENCES ADDITIONAL COMMENTS Frequency Data Collection Form Name: ____________________________________________ Target Behavior: ____________________________________.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Max-Planck- Institut für Plasmaphysik Karsten Liesenberg / AS-T Visit NCSX engineers 11/12 October 2007 Final assembly of Stellarator W7-X in the torus-assembly.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
Xx-xx-2010, tanks arrive from Snezhinsk to Novosibirsk A.Tribendis, July 19-21, 2010, Snezhinsk 1. Check cavity dimensions on a CMM 2. Assemble and measure.
9th July 2009Christophe BAULT1 REVERSE ENGINEERING: TEST OF CATIA CMS Tracker mock-up scanned with Faro Laser Scanner CMS Tracker mock-up scanned with.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
8/15/2007Mike Viola1 NCSX Field Period Assembly + + = August 15, 2007 Mike Viola Field Period Assembly Manager.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
Work Presentation Novel RNA genes in A. thaliana Gaurav Moghe Oct, 2008-Nov, 2008.
QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.
PEER Review of Coil Tolerances and Trim Coil Requirements plus Magnetic Material in Test Cell April 19, 2004 Art Brooks.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
1 NCSX Construction Overview NCSX Team (presented by L. Dudek) March, 2008.
Introduction to programming
CLAS12 - CT meeting 10 October 2013
High Power Test Facility Report David McClelland, Bram Slagmolen, John Jacobs ACIGA LSC Meeting, November 203. LIGO-G Z.
Assembler, Compiler, Interpreter
Alignment of the first two magnet system modules of Wendelstein 7-X
Torsten Bräuer and the Metrologyteam
Find It VR Project (234329) Students: Yosef Albo, Bar Albo
On the accuracy of port assembly at Wendelstein 7-X
Field Photos
Assembler, Compiler, Interpreter
Programming language translators
Presentation transcript:

Photogrammetry Review Raphael Goudard Visit Nov 27 – Nov 30

Suggested Activities Intro to NCSX Project / Assembly Sequence –Brown movies and models –Photogrammetry use on current phase –Measure and compare to our files –Offer suggestion of how photogrammetry can be used to rack and align coils Photogrammetry use on future phase –MCHP (3 coil Half Period), FP (Field period) and final assembly –Lock in on machine as we assemble layers (Mod coils, TF coils, PF Coils, Cryostat) Specifics of Aicon System –Reverse Engineering –Deflection analysis –Import/export –pre/post processing –How to avoid Wendelstein processing time (when does it bog down) –Reuse of coded target numbers –Is he familiar with GSI V-Star system?

Debrief Arrived Monday – gave brief tour Tuesday – Set up targets on A1 9:30 – 10:30 Took a lot of time to ream holes for new photogrammetry targets –10:30 – 11:30 took first project: set of 200 pictures Verify A1 scan with laser tracker (.060 mm) –Placed B1 on A1 then took second set of 200 photos and learned that B1 did not distort A1. (.070 mm) –During lunch B1 was removed then took third set of photos after lunch and verified the A1 still was stable (.060 mm)

Debrief Wednesday – Set up targets on B3 which had just completed racking and measuring –Took pictures to characterize coil (.050 mm) –Unracked coil using dial indicators took photos and whiskers showed that coil moved exactly as dial indicators. Analyzed data using best fit as well deformation analysis (.090 mm) Realigned wedge to itself before and after and could identify deformation vs. translation (.180 mm) –We then tried to rerack the coil by restoring the dial indicators. –The detection of this movement was much easier and obvious with photogrammetry –We validated this movement by checking a couple of point with the laser tracker.

Debrief Thursday – Validated LT measurements and Steve operated software personally and reran Monday’s data from the beginning to the end. Photogrammetry has validated that the laser tracker measurements to date are valid. Best fits of Photogrammetry to LT are within (.060 mm)