FM2 PPEREMC 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW EMC Test Dave Curtis System Engineer University of California - Berkeley.

Slides:



Advertisements
Similar presentations
Electromagnetic interference A number of digital hearing aid users have reported occasional loud noises when using their fm system Occurrences were unpredictable.
Advertisements

Datalink Features & Performance Frequency Band 4.4 – 5.80 GHz Operational Frequency Range A. Range # GHz (CONUS) B. Range # GHz (OCONUS)
MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
Wireless System for TPS Sensors Presented By: Tye Reid and Greg Swanson.
TIME-DOMAIN MEASUREMENT SYSTEM FOR IMPULSE NOISE CHARACTERIZATION Salvador Verdaguer Ferran Silva Electromagnetic Compatibility Group (GCEM). Technical.
1 An Informational presentation for the audiological professional from Connevans Limited.
TCCA Aircraft Certification
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
Doc.: IEEE /168r0 Submission March 2001 Stephen Berger, TEM Consulting Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
© Copyright 2003 TEM Consulting, LP - All Rights Reserved Presentation To ATIS HAC IncubatorRev – 07/21/03 - HSB Overview of ANSI C Wireless Hearing.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
Copyright 2005 International EMC Standards Activity 1 EMC International Standards Update CISPR SC A and I Activity Don Heirman Don HEIRMAN Consultants.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
TS9975 Konyang University 20 th July to 22 nd July 05.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
FM2 PPSRVibration 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION David Pankow Vibration Test Director University of California.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
PLC Testing with ET 91 Level Test Set To learn more click on note! Pilot Level Measurement on RF Test Point Measurements in Special Tracking Mode Pilot.
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
EQUIPMENT. Radio Transceiver (and Amplifier) Transceiver Block Diagram.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
NSG 4070 Signal generator and immunity test system Dr. Heinrich
Entrance to EMI.
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
CINEMA System Engineering
(EFW Systems Engineer) University of California, Berkeley
THEMIS MISSION PRE-SHIP REVIEW
Solar Probe Plus – FIELDS Main Electronics Package
Accredited Standards Committee C63® - EMC
FIELDS SCM Thermal iPER
MISSION PRE-ENVIRONMENTAL REVIEW
THEMIS MISSION PRE-SHIP REVIEW
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
The Best Value in Electronic Test & Measurement
Presentation transcript:

FM2 PPEREMC 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW EMC Test Dave Curtis System Engineer University of California - Berkeley

FM2 PPEREMC 2 UCB, March 16, 2006 Test Requirements Launch Site Requirements Test in Launch configuration with instruments off RE02, RS03 per THEMIS ICD with Boeing Self Compatibility Requirement Test in plugs-out configuration with instruments on RE02, RE04, RS03 per THEMIS Environmental Spec Limit RE02 to science sensitivity band, 20Hz-1MHz, plus the probe receiver band GHz Limit RS03 to probe transmitter band. Also power up transmitter to verify self-compatibility. Test Procedures in sign-off: THM_MINT_041. UCB Test Procedure THEMIS_EMC_TP. JPL Facilities Procedure

FM2 PPEREMC 3 UCB, March 16, 2006 Launch Site Levels Launch Mode RE02 Limit

FM2 PPEREMC 4 UCB, March 16, 2006 THEMIS RE02 Levels

FM2 PPEREMC 5 UCB, March 16, 2006 THEMIS RE04 Levels

FM2 PPEREMC 6 UCB, March 16, 2006 JPL EMC Facility

FM2 PPEREMC 7 UCB, March 16, 2006 JPL EMC Facility Facility EMI background meets THEMIS requirements Will have to look between 60Hz harmonics for RE04 Low frequency RE02 (<14kHz) on a best effort basis Facility test equipment adequate for THEMIS measurements Frequency range, sensitivity, power, etc. Facility size adequate for Probe and EGSE see following section on layout of test Probe will be fork-lifted into facility on roll-around stand (no crane) Facility cleanliness level can meet THEMIS requirements has been demonstrated on previous project

FM2 PPEREMC 8 UCB, March 16, 2006 Launch Mode Setup Probe connected to EGSE via Umbilical Instruments Off (Launch Mode) Launch Site Test Levels (RE02, RS03)

FM2 PPEREMC 9 UCB, March 16, 2006 Operational Setup Probe connected to EGSE via RF (Hat) Instruments On (Operational Mode) THEMIS Science Test Levels (RE02, RE04, RS03)