Accelerating Change December 3, 2015 By Stuart Cohen.

Slides:



Advertisements
Similar presentations
Bryan Roach Chairman Crime Stoppers Australia. Strategic Planning The process for defining strategy (direction) and decision making For Crime Stoppers,
Advertisements

W RITING A P ERFORMANCE I MPROVEMENT P LAN FOR LOCAL RFP Workshop by EveryOne Home December 11, W. Winton Ave, Hayward, Room 160, 1:00-3:00 pm.
Significant Additions and Changes to the 2014 Update to the CLRP Access for All Advisory Committee July 24, 2014.
I-15 MANAGED LANES Building on Success Institute of Transportation Studies’ Center for Urban Infrastructure March 7, 2003.
 Our primary budget objective for the year is to resolve the dependency on reserves  Our carry forward (level services) budget will require double the.
Canterbury Water Management Strategy in the Orari-Opihi-Pareora Zone CWMS – finding local solutions to water management challenges in the OOP zone.
Douglas R. Failing, P.E. Executive Director, Highway Program LA Metro’s Highway Program LA Metro’s Highway Program May 10, 2013 Construction Management.

Phase Difference = Phase Difference = 0.05.
UCSC Committee on Planning and Budget Professional School Update Spring Senate Meeting March 9, 2007 Spring Senate Meeting March 9, 2007.
Gas/Electric Harmonization: Issues, Answers & Risks SNL Knowledge Center December 13, 2012 Lorraine Cross 10 G Street, N.E. Suite 710 Washington, D.C.
Readiness-Based Sparing addresses a challenge common across DOD
International Workshop Sustainable development: Products, consumption, promotion and place marketing T HE ATTRACTIVENESS OF SMART AND GREEN COMMUNITY IN.
L OCAL C ONTROL F UNDING F ORMULA & L OCAL C ONTROL A CCOUNTABILITY P LANS Town Hall Meeting Special Guest, Ted Lempert Tuesday, April 1, 2014.
A S OCIETY ON THE M OVE 13-2 Notes. A MERICANS MOVE TO THE S UBURBS Levittown Mass produced homes Low interest loans – 40 million migrated Depended.
Embedding Travel Planning in the Development Process Sarah Cummings Behaviour Change Transport for London.
Presentation to Community Reference Group Thursday 7 February 2013 Patterson Lakes Community Centre.
Identifying Priority Projects for Funding Joan LeBlanc GOMC Council Coordinator.
CEE 8207 Design of Sustainable Transportation System CEE 8207 Design of Sustainable Transportation System Today’s Topic A tool of sustainability Types.
Working together for clean air Tacoma Clean Air Performance Commitment May 2010.
Planning.Maryland.gov S UPPORTING S USTAINABLE G ROWTH AND C ONSERVATION WITH F OUR S TEP T RANSPORTATION M ODELS S UPPORTING S USTAINABLE G ROWTH AND.
CMAST I MPROVEMENT P ROJECT Report to the CMAST Advisory Task Group June 19, 2013.
Climate Change Steering Committee’s Draft Climate Change Report September 5, 2008 Joan Rohlfs Chief, Air Quality Planning Metropolitan Washington Council.
1 DESTINATION 2030 Update KRCC TransPol and TransTac Meeting Scoping Results Criteria Alternatives May 22, 2008.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Today’s Weather. What causes the weather? 4F53-B998-E6D91AE43323&blnFromSearch=1&productcode=US.
Science and Technology Committee GGOS, December 2006.
Educational Achievement Project Kickoff. Goals Develop an initial technical specification for the exchange of educational achievement data across medical.
 The SNC’s mission is to initiate, encourage and support efforts that improve the environmental, economic and social well- being of the Sierra Nevada.
A very warm welcome to the 2008 Community Door Training & Awareness Workshop.
TUESDAY 19 TH OCTOBER a) Give you the time to consolidate your understanding of each of the 4 phases of the accelerated learning cycle. b) Share.
Current and Future Air Quality Issues Facing the States Bart Sponseller Air Management Bureau Director Joseph Hoch Regional Pollutants Section Chief NASA.
1 Regional Measure 2: Capital Program Update October 14, 2009 Programming and Allocations.
EWB BUILDING SMART BRIDGES NAVIGATING EXTERNAL RELATIONSHIPS Sal Ajek Steph Tom.
E DUCATIONAL C OLLABORATION, C ENTRAL O FFICE C ONSOLIDATION, AND D ISTRICT R EGIONALIZATION Combining school systems for the benefit of all Presentation.
R EGIONAL L AND USE S CENARIO P LANNING S TUDY G ENERAL I NTRODUCTION TO S CENARIO P LANNING.
D EVELOPING L EAD A BATEMENT AND W EATHERIZATION I NDICATORS TO T RACK N EIGHBORHOOD S USTAINABILITY Seema D. Iyer, PhD. Associate Director Research Assistant.
State Route 268 Rutherford County, TN DESIGN PUBLIC MEETING June 2, 2015.
Improving the world through engineeringwww.imeche.orgImproving the world through engineering 1 RSB Budgeting Process April 2013 RSB Mtg.
GC e-Orientation Program for New Hire Module 4 – Knowing your Career in Oracle Updated by HR in July 03.
INFRASTRUCTURE AND HUMAN SETTLEMENTS Presentation by Delegation of the European Union Consultative Group Meeting Technical Session La Palm, Accra, 23/09/2010.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2015-D08-04 CLE-32 Eastern Corridor Phase 4a.
CEN WS/BII2 1 Spreading interoperability in eProcurement processes across Europe Open Seminar Brussels December 6, 2012.
10 W EEK P ROJECT S COPE OF S ERVICES March 13th, 2014.
6/3/11 1 DEPARTMENT OF WATER AFFAIRS “Progress in the Accelerated Community Infrastructure Programme (ACIP)” Briefing to the Select Committee on Land and.
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
Geometric Probability Probability Recall that the probability of an event is the likelihood that the event will occur.
10-8 Geometric Probability
THE ASEAN SAFE SCHOOL INITIATIVE (ASSI) PROGRAM ASSI Launch –Jakarta, Indonesia November 2014 Olle Castell, DRM Manager Plan International Asia Regional.
Presentation to the Portfolio Committee on Public Works 1 March 2016 GREEN BUILDING FRAMEWORK PROPERTY MANAGEMENT TRADING ENTITY.
Today  Participation Assessment  What did you learn from the fishbowl debate?  What is sustainable? What is equitable?  Discussion Questions.
D OWNTOWN D EVELOPMENT I NCENTIVES P OLICY A N I NITIATIVE OF P ROJECT D OWNTOWN City Council Presentation May 17, 2011.
Image from
Presented by: Carmen D’Agostino and Dan Gutwein CPOD “If you don’t set goals, you can’t regret not reaching them.” Yogi Berra.
DESTINATION 2030 Regional Local Personal Adopted May 24, 2001.
Outcomes, Values and Priorities Workshop 1 Redesign Board 10 th May 2016.
C APITAL I MPROVEMENTS P LAN C ITY M ANAGER R ECOMMENDATION October 28, 2014 FY 2016 – FY 2020.
An introduction to CDP and the disclosure process
SMART Targets Sam emsley.
NGTA Halton Planning and Public Works Committee
Lessons Learned from HSIP & CMAQ
Supporting learning in practice
Regional Projects Report 5-Year Integrated Plan Projects Status
This powerpoint can be used as a prompt for teaching phase 3 sounds
Capital Region Climate Readiness Quarterly Meeting February 24, 2015
Handwriting sheets Phase 3
Presentation to the Environmental Concerns Committee Charlotte Chamber
Monitoring System (WDQMS)
Committed Partners (part 1)
Additional commission applicable as $51k ≥ $50k
Presentation transcript:

Accelerating Change December 3, 2015 By Stuart Cohen

S CENARIO P ERFORMANCE A SSESSMENT Comparing Forecasted Outcomes to Regional Targets 14

S CENARIO P ERFORMANCE A SSESSMENT Comparing Forecasted Outcomes to Regional Targets 15

C ALTRAIN D OWNTOWN E XTENSION S AMPLE H IGH - P ERFORMING P ROJECTS P RIORITIZED FOR R EGIONAL F UNDING BART M ETRO U RBAN BRT S YSTEMS F REEWAY P ERFORMANCE I NITIATIVE SMART E XPANSION D UMBARTON R AIL F REEWAY W IDENING (US-101 & SR-239) S AMPLE L OW - P ERFORMING P ROJECTS R EQUIRED C OMPELLING C ASE FOR I NCLUSION IN P LAN S AMPLE M ODERATE - P ERFORMING P ROJECTS “N OTHING TO S EE H ERE, M OVE A LONG ” U RBAN B US F REQUENCY I MPROVEMENTS E XPRESS L ANE N ETWORK 21

Projects re-scoped: (7) Environmental phase only (5) Sponsor agreed to fully fund project locally (1) Down-scoped to achieve B/C ratio greater than 1 Projects withdrawn by sponsors Compelling cases approved: (6) Communities of Concern (1) Air quality (1) Recreational trips Case slated for rejection; “settled out of court” I MPLICATIONS OF C OMPELLING C ASE R EQUIREMENT FOR L OW -P ERFORMING P ROJECTS Image Source: 22

TODAY PLANNED HOV STANDARD HOT OPTIMIZED HOT

TODAY PLANNED HOV STANDARD HOT OPTIMIZED HOT