Sub Committee 6 Ballot resolution Summary June 2012 Mike Briggs.

Slides:



Advertisements
Similar presentations
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Advertisements

Doc.: IEEE 802 EC-12/0008r1 Agenda March 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
SC6 Work Group on VR Plugs SC6 Summer Meeting June 27, 2013 Bob Barnett / Jean Brunjes.
Manufacture and Testing of a Large Zirconium Clad Vessel David Clift, P.Eng. Production Manager Ellett Industries September 14, 2005.
SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
11.2 Nominal masses Nominal mass is used in connection with pipe having end finish such as threads and couplings, upset and threaded ends, upset ends,
League of Women Voters of New York State Constitutional Convention Delegation Selection Process Position Update Prepared by the League of Women Voters.
ASME Liaison Report to CRE May 18, 2011 Urey R. Miller, P.E.
Dimensioning.
Standards and Certification Training Module B – Process B5Consensus Process for Standards Development ASME S&C Training Module B5 Consensus Process for.
API SC6 Winter Meeting New Business: API Spec 6A Tensile Test Specimen Requirements Tim Haeberle 8 February 2011.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus March American Welding Society Stainless Steel Edition.
BIT-224 Audit Chapter-2 Muhammad Khurshid Khan. Auditing Standards GAAS—Generally accepted auditing standards ensure “uniformly high quality audit work”
For the benefit of business and people
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
ISO 9001:2008 What did the November 2008 amendments to ISO 9001 mean to you?
Tim Haeberle API SC Winter Meeting
Proposed Governing Document Revision Updated April, 2011.
Introduction Chapter 10 :: Drafting and Revising Coherent Documents Pages 218 to 236 By: Meghna Nagarajan, Sarah Curet, Brandon Plunkett, Andrew Hardin,
Doc.: IEEE Submission November 2004 Robert F. HeileSlide 1 Forward P REVa-D6 to RevCom Robert F. Heile Chair
ISO 9001:2008 What will the November 2008 amendments to ISO 9001 mean to you?
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
SC6 Resource Group on Trees and Wellhead SC6 Winter Meeting 2012 Eric Wehner 22 February 2012.
Submission February 2014 Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AR 19 February 2014 Authors: NameCompanyPhone .
Recommendation of Informal work group for changes to Weld Overlay requirements in API Spec 6A Chairman - Mike Briggs (Cameron) Members – Tim Haeberle(GE),
API Spec 6A Tensile Test Spec Reference Requirements Tim Haeberle API SC Summer Meeting.
Committee Charter Revisions and Proposed Amendments to IFTA, Inc. Bylaws Lonette Turner Executive Director IFTA, Inc.
ADVANCED MECHANICAL DRAFTING LECTURE #5. PREPARING TO DRAW MANUALLY Purchase MECHANICAL vellum – size B, C, or D Use proper line types Use proper line.
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 18 March 2014 Authors: NameCompanyPhone .
Doc.: IEEE /1206r0 Submission Oct 2004 Black, NokiaSlide 1 TGk LB71 Parallel category comment resolution Simon Black (Nokia)
Comments from Simplified PROCESS-DATA Exercise John Pietras CSTSWG Berlin May, 2011.
Update the “Procedures for Accredited Standards Committee C63®, ElectroMagnetic Compatibility (EMC), Revision 10 January 2013.” Input Received 01-MAY-2014.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
IEEE P1603 reviewer’s guideline Wolfgang Roethig, WG chair.
Page 1 Non-Assurance Services Gary Hannaford IESBA January 2015 London.
ASME BOILER & PRESSURE VESSEL CODE AN INTERNATIONAL STANDARD
Doc.: IEEE Submission September 2010 Hind Chebbo, FujitsuSlide 1 NOTE: Update all red fields replacing with your information; they.
The X Dimension - Mandatory or Not? The back face ID (“X”) dimension on 6B flanges carries a note: Reference dimension. It does not meet the usual definition.
Tim Haeberle API SC Winter Meeting
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Welcome! Drafting 2323: Pipe Drafting Andrew Amini Full Time Instructor, HCC.
Date of download: 6/2/2016 Copyright © ASME. All rights reserved. From: Technical Basis of Material Toughness Requirements in the ASME Boiler and Pressure.
Doc.: IEEE a Submission Sept 2004 Tom Siep, TMS Assoicates, LLCSlide 1 Project: IEEE P Working Group for Wireless Personal.
amendments to ISO 9001 mean to you?
Supplement 198 Retirement of WADO-WS
Accredited Standards Committee C63® - EMC
Nov 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Resolution of PAR and 5C Comments for MBAN Study.
Carry Over From API SC6 Winter Meeting API Spec 6A Tensile Test Requirements Tim Haeberle 30 June 2011.
Money Bills Amendment Procedure and Related Matters Bill [B 75–2008]
API Spec 6A Tensile Test Yield Offset Requirements
Recommended Draft Policy ARIN : Post-IPv4-Free-Pool-Depletion Transfer Policy Staff Introduction.
Welcome! Drafting 2323: Pipe Drafting
SC6 Work Group on VR Plugs
Specification on float equipment
September 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG6 Proposed MAC comment resolution]
First 8 slides are what was presented in San Fransisco…
Supplement 198 Retirement of WADO-WS
Agreed Procedure Updates
First Article Inspection
Draft Resolutions.
Main changes in 2018 revision of ISO/IEC Directives, Part 2
June, 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Comment Resolutions – Taylor et al] Date.
March 2013 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Comment Resolution Suggestions Date Submitted:
2nd Edition: 2019 Winter Standards Meeting
PRESENTATION OF THE COMMISSION FOR GENDER EQUALITY AMENDEMENT BILL TO THE SELECT COMMITTEE 19 JUNE 2013.
Bob Heile Chair, , Wireless Specialty Networks
Alignment of Part 4B with ISAE 3000
August 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Still More LB156 Comment Resolutions Date.
August 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Still More LB156 Comment Resolutions Date.
Presentation transcript:

Sub Committee 6 Ballot resolution Summary June 2012 Mike Briggs

Summary 17 of 25 voting members voted. 4 negative and 13 affirmative votes. 52 comments in all Most all changes were deemed to be fairly minor in nature and the WG did not feel there were any technical changes to the requirements of the standard.

Details of proposed changes Partial (an adjective) should be replaced with Partially (an adverb). WG felt the current wording was correct The terms clad and cladding are introduced. Previously only the terms overlay or overlaid were used. Section 6 uses only these terms to specify welding requirements. These terms are already used in 6A and the WG felt the proposed wording was clear Use of “Well bore wetted” in definitions. Suggest changing to wetted surfaces since this term is already defined in 6A Change phrase – “considered as part of the manufacturer's or this international Standard's design criteria” to "needed for structural strength“. The WG felt this was outside of the WG charter

Details of proposed changes Add "and other corrosion resistant overlay" to the title. The revised title would read Corrosion Resistant overlay (including Ring Grooves and other corrosion resistant overlay) to maintain compatibility with 17D. Do not remove the reference to the 2004 edition of ASME Section IX. WG agreed this was not the appropriate time to remove this reference and retaining the reference does not create an issue or confusion. Leave table 14 in the document. This is a redundant table to table 13 and the WG saw no reason to leave the table in. Do not remove table 15 The WG agreed with this proposal and felt removal of this table was outside the WG charge. Table 15 should be added into section

Details of proposed changes Do not remove figure 6 WG agreed this figure should remain in the document and propose it be moved into Section Following the sentence, "Other than ring grooves, if the overlay material is considered as part of the manufacturer's design criteria or where dimensions for the product are specified in this International Standard, mechanical testing per clause 5 of the overlay material is required," add: "If overlay material is part of the manufacturer's design criteria only, acceptance criteria for mechanical testing of the overlay material shall be as specified in clause 5, or as established by design analysis and specified by the manufacturer.“

Details of proposed changes Add the following statement to the beginning of the sampling section. "Where the overlay is considered part of the manufacturer's design criteria or is part of the design criteria of this standard,". Add the following statement to the end of the sampling section: "If the overlay is not considered part of the design criteria then examination shall be done in accordance with manufacturer's specifications. The WG felt this was a change in requirements, not a clarification, and as such was outside the WG charge. Delete the phrase "No overlay thickness less than 3 mm (0.125") “ The WG agreed this was outside the WG charge and the statement should be removed. Clarify what adjacent isin Propose the words "on all sides" be added after the word metal. Revise to direct use of ASME Section V Article 4 using flat bottom hole or side drilled hole techniques. WG felt this would be a change to current requirements and was therefore outside the WG charge.

Details of proposed changes The statement of "prior to machining operations that limit effective interpretation of results" could be misleading and could lead the manufacturer to believe UT must be done on as clad material. Add the following statement to this section. “This may require intermediate machining operation to meet surface finish requirements without limiting the effectiveness of results.” The reference to visual inspection does not pertain to visual inspection of weld preps - Add "and weld preps to b&c Pressure containing Repairs section refers to for PSL2 and for PSL3 for preparation prior to welding. These paragraphs surface NDE of finished welds. Previously Table 18 referred to Note "h" which required surface NDE prior to weld

Details of proposed changes The last row of Table 18 "Weld Metal Fully Clad". By definition Fully Clad must be corrosion resistant alloy material. This prevents full weld metal overlay of a loose flange or other body, bonnet, end or outlet connection with any material other than CRA – Agree in principle, the definition of fully clad to be changed to allow CRA or Austenitic Stainless The row in Table 18 for partial clad calls for surface NDE prior to weld using Paragraph which is for surface NDE of finished welds. – Revise to Paragraph for base material. There is a contradiction in the completion note and the sampling requirement in (1). The sampling note require the UT be done prior to machining that would limit effective interpretation of results. - Add the following statement to the end of the completion note. “Except for volumetric NDE which shall be done prior to machining that would limit effective interpretation of results.”

Details of proposed changes Table 17, the paragraph references for “impact testing” are incorrect. The correct paragraphs for PSL 2, PSL 3/3G, and PSL 4 are , , and respectively. - Change the table number from 37 to 17. Correct the paragraph references as noted.