1 Energy Science Laboratories, Inc. Materials & Processing ESLI Cooled Carbon Support BTeV Pixel Detectors Development Recommendations for 2001 T R Knowles.

Slides:



Advertisements
Similar presentations
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Advertisements

Preliminary ANSYS Results: CCD Fixture and Lens Frame Andrew Lambert.
LBNE Science Collaboration Meeting - FNAL July 15, 2009 Horn/Target Material Studies at BNL Towards multi-MW Beam Nick Simos, Ph.D., P.E. Energy Sciences.
CryoCoat™ UltraLight™ Insulation
Vertex2002, Kailua-Kona, HI 11/07/02 B. Quinn1 Carbon Fiber Grounding Issues in the DØ Run IIb Silicon Detector Design Breese Quinn Marvin Johnson, Mike.
INTERIOR WALL FINISHES
1 THERMAL & MECHANICAL PRELIMINARY ANALYSIS ELM COIL ALTERNATE DESIGN Interim Review July 26-28, 2010 In-Vessel Coil System Interim Review – July 26-28,
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
Pixel Upgrade Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman,
M. Gilchriese Disk Rings and Assembly M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
Pre-Baseline Pixel R&D Simon Kwan BTeV Electronics & Software Mtg., May 24,2001 And BTeV Coll. Mtg., May 25, 2001.
NEWS  Internal Review  November 20  Presentation covering most of the relevant L4 WBS activities: rf shielding, substrate,Vacuum vessel, Position control.
WBS Stave Mechanics, Cooling and Support - LBNL ATLAS Upgrade R&D Meeting UC Santa Cruz May 3, 2007 E. Anderssen, M. Cepeda, S. Dardin, M. Gilchriese,
Walter Sondheim, FVTX Review Nov 12 th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Common Components of a Traditional Wood Framed Building
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
Mechanics and Cooling of Pixel Detectors Pixel2000 Conference Genoa, June 5th 2000 M.Olcese CERN/INFN-Genoa.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
M. Gilchriese SLHC Pixel Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese,
BTeV Pixel Detector Laurie Ramroth Fermi National Laboratory Under the direction of: Jim Fast.
ATLAS LBNL Pixel Support Study 1 W.O. Miller HYTEC ATLAS Pixel Detector Support Structure Status and Future Developments February 19, 1999 W. Miller HYTEC.
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
Thermal & Mechanical Support for Diamond Pixel Modules Justin Albert Univ. of Victoria Nov. 6, 2008 ATLAS Tracker Upgrade Workshop.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
The Mechanical Structure for the SVD Upgrade
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
ESLI new proposal Questions generated after their new proposal –radial fintubes –Dog-leg –Manifold –Development and production cost –CM’s design.
W.O. Miller i T i VG 1 Two Pixel Configurations Under Study First: A Monolithic Integrated Structure First: A Monolithic Integrated Structure –Axial array.
Referenced product Dolphin 5 RE: Lui 2 review #001 12/26/2015Answers to Lui 001 Dolphin 5 by Dale.1.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Walter Sondheim 6/2/20091 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL Mechanical Project Engineer.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Experiences and Issues with Carbon Foam at BNL & Yale BNL: David Lynn, Marc-Andre Pleier, Anatoli Gordeev, Russ Burns, Ken Sexton Yale: Paul Tipton, Will.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Basic Aircraft Structure
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Antti Onnela CERN – EP – Detector Technologies group
Update on WG4 A.Tauro - R.Santoro 11/10/11 ITS upgrade meeting.
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Date of download: 12/18/2017 Copyright © ASME. All rights reserved.
WG4 – Progress report R. Santoro and A. Tauro.
New Proposed Foam Developments
Basic Aircraft Structure
Presentation transcript:

1 Energy Science Laboratories, Inc. Materials & Processing ESLI Cooled Carbon Support BTeV Pixel Detectors Development Recommendations for 2001 T R Knowles 3/7/01

2 Energy Science Laboratories, Inc. Materials & Processing ESLI FY00 Progress Cooled carbon structure demo articles (full-scale) –Lightweight –Rigid –Shingled surface –Porous chip mount –Al manifolds Issues –Resistance at tube wall is high Need to increase thermal conductance –Tubing cracked, leaked Need to increase toughness and assure leak-tightness Fibrous surface for shingling with high contact conductance Vertical high-k fibers with in-plane discrete fiber reinforcements Tubes cemented in grooves

3 Energy Science Laboratories, Inc. Materials & Processing ESLI Increase Thermal Conductance “Fintubing” Concept –Improved fiber orientation –Issues: Precision? Manifolds? “Tubewall” Concept –Complete layer of tubing Tubing height < 1 mm –Issues: Precision, Rigidity? Manifolds

4 Energy Science Laboratories, Inc. Materials & Processing ESLI Graphite Header Tubing Sealed POCO graphite tube –Tube machined from POCO –Pyrocarbon CVD seal coat Helium leak test –Light CVD seal reduced He permeation to <5e-9 mL/s (most sensitive scale on leak detector) –Expect heavier coat to seal even better (no helium leak signal) Good candidate for headers –May reinforce with carbon braid to improve strength and toughness POCO graphite rod CVD POCO tube, (unreinforced – 8 ksi)

5 Energy Science Laboratories, Inc. Materials & Processing ESLI Tube Manifolding Carbon carbon construction –Tubular elements Large-gauge headers Small-gauge lines –Carbon joining Carbonize bonding resin Seal by pyrocarbon CVD Reinforcement options –Integral boss on graphite header for larger tube/header interface –Fabric reinforcements

6 Energy Science Laboratories, Inc. Materials & Processing ESLI FY01 Task 1 Review Issues and Options THERMAL “fintube” and “tubewall” options –Fabricate small comparison articles STRUCTURALfibercore; carbon fiber frame –Fabricate small comparison articles MANIFOLDINGaluminum vs carbon –Fabricate carbon-carbon T-joint to test hermiticity TOUGHNESSreliable tube/manifold connection –Fabricate stress-relieved joints with velvet or fabric

7 Energy Science Laboratories, Inc. Materials & Processing ESLI FY01 Task 2 Fabricate Prototypes Fabricate two (2) Cooled-Carbon Supports –Incorporate design features selected from Task 1 Assure leak-tightness by monitoring throughout fabrication Mount on aluminum frames; attach inlet and outlet lines Preliminary heat exchanger performance test at ESLI –Measure flow impedance –Measure heat exchanger performance T heater - T coolant when symmetrically 1 W/cm 2

8 Energy Science Laboratories, Inc. Materials & Processing ESLI FY01 Task 3 Superstructure Options Work together with FNAL engineering to draft design of support superstructure based on –Lightweight sandwich structures –Carbon tubing –Carbon truss superstructures carbon rod space framebulkheads

9 Energy Science Laboratories, Inc. Materials & Processing ESLI Carbon Truss Structure Concept Carbon sheet (100 µm) bulkheads Carbon-fiber rods in tension Carbon tubing & manifolds Carbon fibercore thermal area

10 Energy Science Laboratories, Inc. Materials & Processing ESLI Cost/Schedule