Operational Improvements at the Grant Town Power Plant Presented By: Steve Friend Sr. Plant Engineer Edison Mission O&M 2005 ARIPPA Technical Symposium.

Slides:



Advertisements
Similar presentations
Surface Engineered Coatings in Pressure Vessels
Advertisements

The second generation of IGCC Power Plants. Problems and solutions.
Singapore Polytechnic Singapore Maritime Academy & Maritime Institute Of William Barentsz Bachelor Degree in Maritime Operations (BMO) Diesel Technology.
CONTROLS OF SUPER CRITICAL BOILERS
MicroMistTM Wet Scrubber Advanced Scrubbing Technology
VORTEX FINDERS (DIP TUBES, IMMERSION TUBES)
Power Plant Engineering
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Furnaces also called Fired Heaters
1Page TÜV SÜD AG ARIPPA Technical Symposium Block Grid Nozzle Modification By TÜV SÜD Industry Service, Inc. August 2009 TÜV SÜD Industry Service, Inc.
MATS Compliance Initiative at Grant Town Power Plant.
A novel IGCC system with steam injected H2/O2 cycle and CO2 recovery P M V Subbarao Professor Mechanical Engineering Department Low Quality Fuel but High.
Salsnes Filter Overview
OUR ‘ISO’ CERTIFICATIONS CE Certification for our Leading Products.
DIRECT FIXED COST ESTIMATES ESTIMATE METHODS FOR AUXILIARIES AND SPECIFIC COMPONENTS.
DSI Options for MATS Compliance Pat Mongoven ARIPPA Aug 2013.
Models for Predicting Bed-Related CFB Performance Parameters Pete Rozelle U.S. Department of Energy ARIPPA, May 23, 2006.
Evolution of Coal-Fired Fluidized Bed Technology and Potential Operations Constraints.
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
Superheaters.
PG&E and Altera Data Center Energy Efficiency Project.
Fluidized Bed Solids Management: How Knowledge of Fundamentals can Help Optimize Plant Operations.
POWER PLANT.
B OILER Presented by: Muhammad Azffar Mohamad Hanif bin Yusof Nor Aminah bt. Mohd Khalil
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
Bulk flow—Pressure difference Plant Physiology UNI 2009.
An Introduction to Basic Hydrocyclone Operation
Distribution System Control Strategies.  Tank Management/Operations  Flushing  Rerouting Water  Others  optimizing existing booster chlorination.
Gulf Solvo Chem - PGCT® Introduction & Key Features Applications The Process Environmental Benefits Output Tables.
STUDY OF BOILER’S ACCESSORIES
Prof. D.N. Reddy Director Centre for Energy Technology University College of Engineering Osmania University.
Research and Development at HASLE Refractories A/S Tina Stendal Svendsen Product Mananger 1.
Energy And Environmental Technology
An Exercise in Evaluating Photo Backgrounds in Slides The Cain Project in Engineering and Professional Communication ENGINEERING SERIES.
Clark Reliance Corporation Strongsville, OH. Fuel Gas Treatment.
The Importance of Distribution. Manifold Position And Vapor Trail.
Forging new generations of engineers. Basic Pneumatics.
1. SIVA By Prof. Dr. Attaullah Shah 2 Fine and Coarse aggregates.
AN OVERVIEW PROF. D.N. REDDY DIRECTOR CENTRE FOR ENERGY TECHNOLOGY UNIVERSITY COLLEGE OF ENGINEERING OSMANIA UNIVERSITY.
Kerry O’Neill Director.
Analysis of Turbo Combustor P M V Subbarao Professor Mechanical Engineering Department A Device to Anchor the Flame…. The Cause of Major component of.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Sizing Variable Flow Piping – An Opportunity for Reducing Energy
STEAM POWER PLANTS.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
A Seminar On Suratgarh Super Thermal Power Station (Raj.)
SURATGARH SUPER THERMAL POWER STATION
Thermal Power Station.
2013 AEP BRO Forum INCREASING MILL CAPACITY AND PERFORMANCE Wide Track Grinding Elements Classifier Upgrades AEP BRO FORUM July 30, 2013.
SURATGARH SUPER THARMAL POWER STATION
Presentation on Steam Power Plants R.C.Chaturvedi
Presentation of HASLE Refractories A/S Ceramic Diptube Case Story at a plant in Thailand
Prepared by : Nishant .A. Raval
Coal quality issues and options Dr Andrew Minchener OBE General Manager IEA Clean Coal Centre January 2015.
Welcome! Drafting 2323: Pipe Drafting Andrew Amini Full Time Instructor, HCC.
A SHORT PRESENTATION Filcon Filtration ApS. FILCON FILTRATION APS Founded in 1999 A Danish private owned company All engineering in house. Professional.
Sorbent Handling Plant by NHI-Design & Equipment Specifications
Types of material handling equipment
Government Engineering College Valsad
Sr no Content 1 Stop check valve definition 2 How does a stop check valve work? 3 Stop check valve 4 Check.
Power Plant Engineering. Boilers Boilers Boiler is an apparatus to produce steam. Thermal energy released by combustion of fuel is used to make steam.
Furnaces (also called Fired Heaters)
AIR Quality Control Concepts
Chapter 6 Cyclones.
ESR2 Cryoplant Utilities
Joint Venture between IEC and Dor Chemicals
WEMCO® Hydrogritter® II Complete Grit Removal Package
Presentation transcript:

Operational Improvements at the Grant Town Power Plant Presented By: Steve Friend Sr. Plant Engineer Edison Mission O&M 2005 ARIPPA Technical Symposium

Improvements at the Grant Town Power Plant Fuel Handling and Processing Ro-Pro Facility Silt System Ash Handling Bottom Ash Screw Coolers Bottom Ash Piping Limestone Processing DFM Boilers Grid Nozzles Tube Erosion Cyclones NO x Control DCS Foxboro Migration

Fuel Processing and Handling Addition of the Ro-Pro facility has added flexibility to the fuel production process and additional means for final product cost Removal of the wet circuit equipment from the original preparation plant eliminated excessive reject and reduced costs of product – dewatering chemicals and equipment no longer used Silt system installation and modifications have allowed facility to maximize amount of lowest cost fuel to be added into final fuel blend – higher silt percentage = minimum fuel costs

Ro-Pro Fuel Processing Facility

Ro-Pro Screener

Silt Feed System

Bottom Ash Handling Improvements Screw Cooler capacity was approximately 20% lower than design with a 6” Pitch Auger – required running the screw cooler at higher RPM for adequate bed level control 7” Pitch Auger allowed screws to be slowed down – reduced erosion rates on the cooler components Addition of rifle bars has helped to control trough erosion but has increased wear rate on the auger Application of weld overlays, wear strips, and thicker materials has helped control auger wear

Bottom Ash Screw Cooler Trough with Rifle Bars

Bottom Ash Screw Cooler Inlet Section of Trough

Bottom Ash Piping Modifications Initial design was sweep elbows on both the primary and redundant pressurized bottom ash conveying systems Sweep elbows had very low mean time between failures due to erosion – on the order of a few weeks Reconfiguration of the system using blinded tees for the direction transitions has reduced maintenance costs. Effective pipe rotation program has helped to further reduce ash conveying system maintenance costs

Bottom Ash Blinded Tees

Limestone Handling System Williams Direct Fired Mill for processing limestone for injection into the CFBs Velocity Cone did not have any impact on final product size Optimization of air flow though the mill has helped to produce more ideally sized product Installation of VFD on the product cyclone rotary valve has helped to minimize transport line pluggage and system processing delays

DFM

Boiler Modifications Erosion Control –Sootblower lane shielding –Economizer hanger tube tube monitoring/shielding/replacement –Flame Spray –Pad Welding –Refractory Extensions –Stainless Steel Overlay

Combustor Tube Erosion

Refractory Extensions

Combustor Tube Weld Overlay

Boiler Modifications Arrowhead Nozzles –Provide nominal improvement in limestone utilization –Backsifting is a BIG problem –Internal stand pipe erosion now becoming a major concern –Increased maintenance costs offsetting any benefit realized in reduced limestone consumption –Considering repair/replacement options

Arrowhead Nozzles

New Nozzle being Considered as Arrowhead Replacement

Boiler Modifications Cyclones –Segmented Vortex Finders –Narrowing of cyclone inlet opening –Design of vertical bullnose on the cyclone inlet to narrow the opening about 10% –Narrowing of the opening has increased inlet velocity to >75 ft/sec –Both changes had major impacts on limestone consumption – improvement of about 20% in total when paired with the DFM optimizations.

Vortex Finder Deformation

Segmented Vortex Finder

Bullnose Modification to Narrow Cyclone Opening

Ammonia Unloading/Storage

Ammonia Injection Skid

DCS Modifications Foxboro Migration Package –Poor availability of Bailey replacement parts and support –Electrolytic capacitor failures –No changes to I/O wiring –Low cost alternative to wholesale DCS replacement

I/O Rack

DCS Processor Rack