Stéphane Gabourin on behalf of TE/MPE-EP MPP Linac4 – 9 th July 2015 BIS installation in Linac4 For 50 MeV operation.

Slides:



Advertisements
Similar presentations
Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

FPGA Configuration. Introduction What is configuration? – Process for loading data into the FPGA Configuration Data Source Configuration Data Source FPGA.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
Machine Interlocks in the Injectors MPE-TMB. Puccio & al.25 th Aug v0.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Status of the Roman Pot Movement System and the Interlocks Mario Deile
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
B. Todd et al. 25 th August 2009 Observations Since v1.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
New PSB Beam Control Upgrade of daughter cards Alfred Blas PSB rf Working group meeting 24/03/ Generation of REV clocks 2.Synchronization with.
André Augustinus 9 October 2006 Interlocks update.
Handshake with the experiments 04/09/20091 R. Alemany (BE/OP/LHC) LHC Experiments Handshake.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
LLRF FOR CHOPPER Grégoire Hagmann Philippe Baudrenghien BE/RF/FB February 24th, 2013.
Machine Interlocks in the Injectors IEFC workshopBruno PUCCIO (TE/MPE) 22 nd March v0.
BLM “sunglasses” Filter Box. Current layout: BLM crates CIBU units Rack BY02 / SR8 BIC crate ( UA83 ) User_Permits Maskable channel Unmaskable channel.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
CERN Andrea Apollonio page 1 MACHINE PROTECTION CONSIDERATIONS FOR 50 MeV LINAC4 BIS COMMISSIONING A.Apollonio, B. Mikulec, C. Martin, B. Puccio, F. Roncarolo,
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ BIS: Beam Interlock.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
2( ) 8x + 14y = 4 -12x – 14y = x = x = 4 8x + 14y = 4 8(4) + 14y = y = y = -28 ___ ___ y = -2 The solution is (4, -2)
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
Beam Interlock System SPS CIBU Connection Review
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Overview of the Beam Interlock System
Review of the Machine Protection System in the PS complex
Overview of CERN BIS and Communication Hardware
LINAC4 50 MeV phase BIS STATUS
Injection BIS – next iteration
1v0.
352MHz Klystron Control for the 3MeV Linac test stand
XFEL Vacuum System Commissioning
Commissioning and Testing the LHC Beam Interlock System
Disabling Rules.
Linac 4 Devices Controls and Monitoring Status
Module 1: System Overview
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
LINAC4 commissioning plans etc.
1v1.
RF Local Protection System
BCM-BIS Interface Szandra Kövecses
Ion Source and LEBT control system topology, Interlock strategy
PSS0 Design & Concept of Operations
MPS commissioning at ESS
Interlocking strategy
TS2 PSS Software Requirements and Software Design
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
SPS Injection BIS - Draft requirements
Presentation transcript:

Stéphane Gabourin on behalf of TE/MPE-EP MPP Linac4 – 9 th July 2015 BIS installation in Linac4 For 50 MeV operation

2  For the 50MeV phase, the beam is stopped in the Chopper  The BICs “Source RF”, “Choppers” and “L4” are used.  Modifications have to be implemented into both masters

3 Modifications for the Master BIC “Source RF”

4 Define a suitable BIC equation for the source start procedure: “During a source start-up the nominal conditions are very different from those during standard operation; the beam stopper is “in” and no BIS signal or interlock software should interfere with source operation until the completion of conditioning” (J.Lettry) Solution:  1) Install a new CIBU near the source  2) Add a new equation for the “Source RF” BIC This CIBU named Source Start will be installed inside the source rack and will be manually controlled by a switch. The cable is already pulled; this solution will be operational for the 50MeV phase.

5  3) Add a new condition in the SIS Some signals are monitored by the SIS; during the source start these signals must be forced to TRUE. Important: While the Source Start gives a user permit to TRUE, the BIS is not responsible for the safety of the Source (Source Internal and Source HV are ignored). 50 MeV implementation:

6 Modifications for the BIC “Choppers”

7 Issue with the Beam Permit redundancy on the Pre-chopper:  In normal operating conditions the Pre-chopper receives 2 Beam Permit signals for redundancy reasons The BIS functionality is as expected in the Engineering specification  When downstream elements (like Valve 1&2) provide a User Permit to TRUE, the Beam Permit signals are both TRUE (all other User Permit signals must also be TRUE …)

8 If the Stopper is “IN” position :  The second equation of the BIC RF is selected (Beam Stopper IN), Valve 1 is not taken into account  If the Valve 2 gives a User Permit to TRUE, The functionality is as expected, the beam is sent to the stopper (stability of the source) Master BIC RF

9  The Pre-chopper is “stopped” and the beam is “diluted” at 45 KeV in the line.  In these conditions the beam never reaches the faraday cup nor the stopper. If the Stopper is “IN” position but Valve 2 gives a FALSE:

10  The problem is the same with all other BICs + downstream elements (except the Ejection BIC). If one of the User permit goes to FALSE, the beam is diluted at 45KeV as the source is not stopped.

11 What we want:  Keep redundancy on “Pre Chopper” for safety reason  When the Beam Stopper In is TRUE, the Beam Permit “Pre Chopper” must be TRUE  When the Beam Stopper Out/Moving is TRUE, the Beam Permit “Pre Chopper” must be TRUE only if all others users are TRUE for the required destination  => The User permits Beam Stopper In and Beam Stopper Out/Moving have to be considered by the BIC “Choppers”

12 Solution:  Add the 2 Beam Stopper signals to the “Chopper” BIC  Add new equation “Beam to Stopper” to give a Beam Permit to TRUE when the Stopper is “IN”  Remove the inputs Destination PS and PS ok (not enough place)  Remove equation “Beam to PS”

13  Master Chopper to install (before was only the L4 slave BIC)  Two out of the Four equations will be used  Two new connections for the Beam Stoppers  L4 slave BIC is now only one of the inputs  3 CIBUs to install for inputs 4, 5 & 6 => forced permits (bouchon/strap)  All other inputs not considered 50 MeV implementation: not considered new connections forced permits