SPD status and last operations A. Carboni, A. Comerma, D. Esperante, E. Picatoste et al. 08SEP2009Calo meeting1.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

Analysis of chip with 100 events, July 2001 Variation in pixel to pixel average ADC values (fixed pattern noise) Pixel ADC value event to event repeatability.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
String-18 New-DAQ Commissioning Azriel Goldschmidt AMANDA Collaboration Meeting Berkeley, March 2002.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
Hycal Energy Resolution, Timing, &Trigger Efficiency, A cumulative study. Chris Mauney.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
M.N Minard Trigger Validation Board Status Cyril Drancourt, Pierre-Yves David,Victor Coco, M.N Minard - Production status - TVB tests on Cryo side.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
FVTX High Multiplicity Trigger for Run15
Trigger sources in ODIN (new firmware)
Analysis of optical IPM data
Noise analysis of the 1m3 DHCal test beam
Presentation transcript:

SPD status and last operations A. Carboni, A. Comerma, D. Esperante, E. Picatoste et al. 08SEP2009Calo meeting1

Outline  Cable Problems  Temperature Probe Calibration  The phase of the MIERDA line for time alignment  Noise levels  Plans 08SEP2009Calo meeting2

Cables problem  Communication problems between some CB and VFE due to control/clock cables problem addressed long time ago.  A bundle of 4 cable got jammed between the 2 cable chains. The bundle somehow got stretched and was able to sneak to one side of the cable chain.  Repaired “in situ” by cutting ~10 cm and soldering back.  One of the repaired cables still showed failures in the reflectometer when shaking.  3 other spare cables in use. Two of them with a 5m extension at the Gantry. 08SEP2009Calo meeting Thanks to Albert for his great work on top of the cherry picker and to Pascal for all his support and nice pictures. 3

Temperature calibration 1  Theoretical calibration curve:  T = A*S+B  S = ADC reading  A = ±  B = ± 15  We had calibration values for side A, not for C.  We tried to find a way to do a rough and reliable estimation of the calibration curves for side C. Read the temps. at two different stable points.  We’ve found some other issues: glitches in the readings with a periodicity of 440 s. To be understood a bit better but Albert claims that it is a feature of the RB. This implies that we’ll have to implement a kind of filtering or re-try mechanism. 08SEP2009Calo meeting4

Temperature calibration 2 08SEP2009Calo meeting Histogram side A, theoretical temperatures. Histogram side A, old calib. RMS is smaller, but the mean differs considerably from the theo. values  The values obtained with the calibrations are much more reasonable: closer to real mixed water temp. and RMS lower. 5

Temperature calibration 3 We need two points to define the curve: 1 st point: when the electronics is cold. 2 nd point: when the electronics temperature is stable after long time running. We will assume that all the boards are at the same temperature in both cases, which is less true for the 2 nd point… We have the ADC readings, but which is the real temperature?. We decided to use the values obtained with the old calibrations, the RMS is lower which indicates that the measurements may be better. That is: 17.5˚C and 24˚C for the VFE and 17˚C and 35.5˚C for the regulators boards. It’s not that bad, we only want to know whether the boards are burning (overheating for the refined people) or not, We will remove the dead channels. 08SEP2009Calo meeting6

Phase of MIERDA line  In order to time align the VFEs their source clock will be delayed in the CB by means of the delay chips.  The MIERDA line carries fast control signaling for the VFE. Basically the VFE sub-channel reset. This signal has to arrive at the VFE with the right phase wrt to the clock in order to be latched properly (no timing violations).  The CB only allows to time shift the MIERDA line by half a period. The results show that the half a period is actually 8 ns…  After the VFE optimum timings are known we have two choices:  Try them and see if any VFE doesn’t respond properly. Not very gentle…  Know beforehand which are the not valid ranges for the clock phases. We’re currently measuring it for all of them (40/100 done). 08SEP2009Calo meeting7

Sample of phase measurements  There is no real difference between long and short control cables.  Where we had the cable extension the range spans over ~ 8 ns. That’s quite undesirable as we can only time shift ~ 8 ns. 08SEP2009Calo meeting VFEPRS0, CB16 Invalid rankPRS0, CB5 Invalid Rank 0Bot[13,17] Bot[13,16]Bot[10,17] 2Bot[13,16]Bot[8,15] 3Top[14,19]Bot[10,16] 4Top[13,20]Top[16,18] 5Top[16,20]Top[17,21] 6Top[16,21]Top[17,20] Top[17,19] 8

LED monitoring  Alessandro is developing a task for the calibration farm for led data monitoring for the SPD  First tests done with some specific runs. Results commented in following slides  Problems found:  Calibration B signal doesn’t work. The calibration command is hardcoded in the Odin, it doesn’t take the value in the PVSS panel. Richard promised to fix it soon.  Some timing issues found. Many of the events found in previous. A timing scan revealed a timing shift of 25 ns. Addressed to a bug in the TFC system. We have to repeat the timing scan and set the proper timings.  Many channels do not “flash” always or at all. Around 25% in side A and few single channels in side C.Our guess is that it has to do with the led bias. 08SEP2009Calo meeting9

10 LED Run  N. events: 10K (5K with even bx ID) ‏  No data for odd subchannels  C side almost dead Right counts: overall 08SEP2009Calo meeting

11 LED Run Wrong counts: overall Wrong zeros: overall 08SEP2009Calo meeting

12 LED Run Example of a correct count cumulation for a single trigger pattern. (trigg. pattern #1)‏ 08SEP2009Calo meeting

13 LED Run  Run #  N. events: 32K (~100% with even BXID) ‏  1 event with odd BXID  C side ~OK, but still worse than A side Right counts: overall 08SEP2009Calo meeting

14 LED Run Wrong counts: overall Wrong zeros: overall 08SEP2009Calo meeting

15 LED Run SEP2009Calo meeting Example of a correct count cumulation for a single trigger pattern. (trigg. pattern #1)‏

16 EVEN subch. - T0 Total cumulate of correct counts at T0, prev1 and next1 LED Run SEP2009Calo meeting

17 EVEN subch. - T0 LED Run SEP2009Calo meeting Total cumulate of correct counts at T0, prev1 and next1 for single trigger pattern #1

Noise levels  Run triggering on SPDmulti>0 (thanks to Patrick R.)  109k evts / 400 Hz = 272 s = 1,09 · BXs sampled  “Hot” VFE ~ 4 noise count / 10 8 BX  no problem  Will try to understand origin anyhow 08SEP2009Calo meeting18

Plans  Perform a cosmic campaign  Check last changes in the HV  Efficiency study: 1.5-3M event  Continue with LED monitoring SW  Synchronise dead BXIDs between L0DU and CB  Apply the temperature calibrations.  Continue with MIERDA line measurments.  Plans for time-alignment and calibration with first data in tomorrow's session 08SEP2009Calo meeting19