Decadal Survey Tier 1 Missions Road to Mission Concept review Mary DiJoseph ESM Program Deputy Technical.

Slides:



Advertisements
Similar presentations
Brian Killough NASA NASA Future Missions Summary CGMS-38 Meeting Delhi, India November 8-12, 2010.
Advertisements

Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
2 - 1 WCRP Denver 2011 Measurement of Decadal Scale Climate Change from Space Marty Mlynczak, Bruce Wielicki, and David Young NASA Langley Research Center.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Preliminary management plan for PACE SDT What are the Goals of PACE? The goals of the PACE mission are: 1-Extend key climate data records on ocean color.
A NASA Headquarters Perspective August 24, 2010 George J. Komar Associate Director/Program Manager Earth Science Technology Office.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
NASA Earth Science – a Headquarters Perspective Presented to: Doppler Wind Lidar Working Group May 1, 2012 George J. Komar Associate Director/Program Manager.
1 NASA Weather Applications Program 2010 Program Overview John A. Haynes Program Manager, Weather Applied Sciences Program Earth Science Division Science.
NASA AGENCY REPORT Dr. Eric J. Lindstrom Physical Oceanography Program Scientist Earth Science Division Science Mission Directorate MARCH 12, 2007.
Build to Cost Directions & Guidelines Peter Wizinowich SSC Meeting November 3, 2008.
The Systems Engineer’s Role in Project Success J. H Rothenberg May 1, 2006.
Developing Technology for NASA Earth Science Technology Strategy Panel, 50 th Goddard Memorial Symposium March 28, 2012 Robert Bauer Deputy Director Earth.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Joint Polar Satellite System Harry Cikanek Director, Joint Polar Satellite System March 18, Science Week.
Innovative Technologies Contributing to Future Earth Science Capabilities Presented to: Working Group on Space-Based Lidar Winds June 17, 2009 George J.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
PACE Science Definition Team Kickoff Meeting Paula Bontempi, Betsy Edwards, Eric Ianson, Hal Maring, Woody Turner NASA Headquarters PACE Program Science.
NASA’s Earth Science Division Flight Overview Bradley D. Doorn Program Manager Earth Science Division, Science Mission Directorate PECORA 18.
NOAA Satellite Conference April 8-12, 2013 Mary Kicza Assistant Administrator for Satellite & Information Services.
Michael H. Freilich 21 April 2009 Earth Science Division Overview and Status.
IT PMB: Executive Oversight and Decision Authority for Application and Infrastructure Projects at NASA Larry Sweet Chair, IT PMB JSC CIO August 2010.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
CLARREO Mission Studies Overview David F. Young First CLARREO Mission Study Team Meeting Newport News, VA April 30 - May 2.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
Path to Mission Concept Review
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
1 Requirements Gathering, Validation, and Concept Studies GOES Users’ Conference Boulder, CO October 1-3, 2002.
New Developments in IT Project Management Policy at NASA Robert Benedict Lara Petze August 18, 2010.
GSFC GOES-R Notional End-To-End Architectures Satellite Direct Readout Conference for the Americas December 9 – 13, 2002 Miami, Florida Sandra Alba Cauffman.
Decadal Survey Mission Planning Presentation to GEO-CAPE Workshop Steve Volz August 18, 2008.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
Diane E. Wickland NPP Program Scientist NPP Science: HQ Perspective on VIIRS May 18, 2011.
NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team)
PoDAG XXI: SEEDS SEED: NSIDC Potential Interactions NSIDC DAAC should prepare an evaluation of their desired future roles in "core activities" and in mission.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
NASA Applied Sciences Program Update John A. Haynes Program Manager, Weather National Aeronautics and Space Administration Applied Sciences Program Earth.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Constellation Space Transportation Planning Office July 30, 2009.
Gary Jedlovec Roadmap to Success transitioning unique NASA data and research technologies to operations.
Dr. Richard R. Vondrak Director, Robotic Lunar Exploration Program Science Mission Directorate NASA Headquarters September 2004 NASA Robotic Lunar Exploration.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
Science Team Objectives K. Jezek and J. Richter-Menge Science Team Co-leads.
NASA Update NDIA PMSC Quarterly Meeting August 26, 2010 NDIA PMSC Quarterly Meeting August 26, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
NASA Earth Science Perspective February 8, 2011 George J. Komar Associate Director/Program Manager Earth Science Technology Office.
Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.
NASA Headquarters Perspective on Space- Based Global Wind Measurements Presented to: Working Group on Space-Based Lidar Winds February 2, 2010 George J.
1 Climate Absolute Radiance and Refractivity Observatory (CLARREO) Welcome David Young Project Scientist CLARREO Mission Formulation Team NASA Langley.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Transitioning unique NASA data and research technologies to operations Short-term Prediction Research and Transition (SPoRT) Project Future Directions.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California CLARREO GPS RO/AJM-JPL.
Second GOES Users Conference, Boulder October 1-3, Issue B Page 1 ACTIVITIES TOWARDS USER REQUIREMENTS FOR POST-MSG by R. Stuhlmann GOES Users.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Weather & Water Synthesis.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Office of Major Project Development (OMPD) Overview November 2015.
The ESA call for the 9 th Earth Explorer mission (EE9)
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
DoD Template for Application of TLCSM and PBL
Life Cycle Logistics.
NASA/US Ocean Satellite Missions
Identify the Risk of Not Doing BA
Systems Engineering Management
Instrument PDR Summary of Objectives
Presentation transcript:

Decadal Survey Tier 1 Missions Road to Mission Concept review Mary DiJoseph ESM Program Deputy Technical

Outline Introduction Decadal Survey Tier 1 mission status Road to Mission Concept Review (MCR) and Key Decision Point (KDP) A Study guidelines NPR 7123 requirements for Mission Concept Review (MCR) NPR requirements for KDP-A Mission Concept Study Report content

Tier 1 Mission Status NASA’s goal for the Tier 1 missions is to have all missions in or ready for Phase A by October 2009 –Must complete Mission Concept Review SMAP completed Mission Concept Review in July 2008 and KDP-A (a presentation to the Science Mission Directorate Program Management Council) on September 12, SMAP is officially in Phase A. ICESAT II is on track to conduct MCR in February CLARREO and DESDyni both plan to conduct MCR in September/October 2009

MilestoneDuration BarProgress/Status Bar Completed MilestoneStudy Phase Earth Science Projects Division Decadal Survey Master Schedule SMAP (Soil Moisture And Precipitation) ICESAT II (Ice, Cloud, and Land Elevation Satellite) LRD 03/13 01/13 As of 10/14/2008 CLARREO (Climate Absolute Radiance and Refractivity Observatory) MCR 06/08 KDP-A 09/08 CDR 12/10 SIR 10/11 KDP-B 04/09 PDR 12/09 KDP-C 02/10 MDR 02/09 09/14 KDP-D 12/11 PER 04/12 PSR MCR 02/09 KDP-A 04/09 NET LRD 11/14 PSR PER 08/13 SIR 05/13 KDP-D 07/13 CDR 09/11 PDR 11/10 KDP-C 01/11 KDP-B 01/10 MDR 11/09 MCR 09/09 Pre-Phase A Mission Trade Studies Launch Readiness Window DESDynI (Deformation, Ecosystem Structure and Dynamics of Ice) MCR 09/09 Pre-Phase A Mission Trade Studies Launch Readiness Window SWOT (Surface Water Ocean Topography) ASCENDS (Active Sensing of CO2 Emissions over Nights, Days, and Seasons) ACE ( Aerosol - Cloud – Ecosystems) GEO-CAPE (Geostationary Coastal and Air Pollution Events) HyspIRI (Hyperspectral Infrared Imager) NLT LRD 03/16 Launch Readiness Window International Hydrology Work Workshop 10/21 – 10/23 Imaging Spectrometer and Infrared Imager - Science Workshop 10/21 – 10/23 ACE Science Working Group Meeting 11/06/2008 GEO-CAPE U of North Carolina 08/18 – 08/20 ASCENDS U of Michigan 07/23 – 07/25

Associate Director/ Earth Systematic Missions Program Manager Gilberto Colon Program Integration Manager Paul Brandinger Secretary Donna Mudd Earth Science Projects Division And Earth Systematic Missions Program Office ESM Flight Deputy Director/Program Manager David Mitchell ESM Operations & Data Systems Deputy Program Manager Gilberto Colon (Acting) Advanced Studies & Strategic Capability Deputy Associate Director/ Technical Mary DiJoseph DPM-Resources, DS Missions Kathy Shifflett Systems Engineer/590 Norman Rioux Program Instrument Systems Mgr Bernie Graf Program Business Office Program Business Manager Jonathan Bryson Deputy Program Business Manager Tracy Felton (Acting) Program Support Manager Katy Mikkelsen –LDCM –GPM –Glory –NPP –ESMO –ESDIS – Ground Systems Capability PAO Sarah Dewitt ESM Performing Centers ARC: TBD GSFC: Laurie Leshin LaRC: Leila Vann JPL: Diane Evans __________________________ Signature /date Draft- 10/15/08 Procurement Manager Steven Kramer NOAA Projects Marty Davis – NOAA N’ – GOES N-P – NPOESS IPO – SMAP (JPL) – ICESat II (GSFC) – CLARREO – DesDynI – Decadal Survey studies Systems Safety & Mission Assurance/300 Program Systems Manager (ITA)/500 Nick Speciale Senior Scientist Vacant Instrument Technology & Development Deputy Associate Director Mary DiJoseph (Acting) – TSIS (NOAA) – CERES FM6 (NOAA) – Instrument Studies

Role of the Earth Systematic Missions Program Office in Decadal Survey All Decadal Survey Missions are directed missions and will be managed by the Earth Systematic Missions (ESM) Program office, housed at NASA Goddard Space Flight Center (GSFC). –This is former EOS Program Office renamed and re-envigorated for the Decadal Survey Directed missions are managed by the implementing Center (LaRC for CLARREO) with oversight and assistance as needed or requested from ESM-PO EMS-PO develops performance standards and provides independent assessments for all Decadal Survey missions While housed at GSFC the ESM incorporates expertise from across NASA –In particular including science and instrument expertise from LaRC and JPL

NASA’s Project Lifecycle CLARREO is here Need to be here by October 2009

Road to MCR and KDP-A: The Mission Study Process Conduct studies and analyses to derive the Level 1 requirements (Science, engineering, cost and schedule) Complete an analysis of alternatives resulting in a conceptual design, and conduct Mission Concept Review Prepare for approval all documents required in NPR D (NASA Space Flight Program and Project Management Requirements) 8

Study Guidelines: the study process Pre-Phase A is an iterative process. Crucial to conducting a successful study is agreement on a set of realistic mission objectives and their flowdown to science and measurement requirements that are documented in the mission’s Level 1 Requirements.

Study Goals & Objectives Establish performance metrics, develop and document the mission science requirements (Level 1 requirements), explore the full range of implementation options, define an affordable project concept to meet requirements specified in the Level 1’s, identify needed technologies, and begin preliminary development of the Project Plan. Define the best mission that fits within the allocated resources and bring the mission to Phase A maturity. Mission Study Teams should explore the optimum range of cost, schedule, and capability that will maximize the science/cost ratio across the entire Decadal Survey flight program.

Study Guidelines: activities Investigate: –Potential Partnerships with non-NASA organizations –Instrument and mission design and development options, including make/buy decisions and alternative mission operations approaches Conduct trades: –Science requirements, trying to identify the significant cost vs. performance parameters –Mission risk (looking for cost vs. reliability drivers) –Technology –Acquisition Strategy –Mission operations approach –Data Processing and distribution approach –Access to space (launch vehicle selection; co manifest; etc)

Study Guidelines: study schedule should include these activities Detailed mission concept definition Sensitivity analyses (science measurement requirements and instrument performance parameters) Cost estimates Risk assessments System impacts of new technology infusion Concept validation Mission trade space modeling Study reports and archived models Level 1 requirement definition –Temporal and spatial resolution requirements. –Measurement accuracy requirement as a function of spatial resolution. –Effect of orbit selection on mission performance. –Mission lifetime. –Other science requirements achievable by potential instrument combinations that could extend the mission applicability to other science questions. –Measurement(s) to be made –Science rationale (How measurements contribute to science question(s)) –Related measurements of complementary value –Define roles for international partners Define a baseline instrument concept, including the rationale and key instrument performance parameters Identify alternative instrument concepts Define a spacecraft concept, including key spacecraft performance parameters Identify launch requirements Identify Supporting R&A investments Identify Specific cal/val requirements Generate a detail cost estimate for instrument, Ground System, MO& DA, Science, Project Management, Systems Engineering, and Flight Assurance. Parametric estimate for spacecraft. Develop a detailed mission schedule (at least WBS Level 3 for instrument)

NPR 7123 requirements for MCR Mission Concept Review Entrance CriteriaSuccess Criteria 1.Mission goals and objectives. 2.Analysis of alternative concepts to show at least one is feasible. 3.Concept of operations. 4.Preliminary mission descope options. 5.Preliminary risk assessment, including technologies and associated risk management/mitigation strategies and options. 6.Conceptual test and evaluation strategy. 7.Preliminary technical plans to achieve next phase. 8.Defined MOEs and MOPs. 9.Conceptual life-cycle support strategies (logistics, manufacturing, and operation). 1.Mission objectives are clearly defined and stated and are unambiguous and internally consistent. 2.The preliminary set of requirements satisfactorily provides a system that will meet the mission objectives. 3.The mission is feasible. A solution has been identified that is technically feasible. A rough cost estimate is within an acceptable cost range. 4.The concept evaluation criteria to be used in candidate systems evaluation have been identified and prioritized. 5.The need for the mission has been clearly identified. 6.The cost and schedule estimates are credible. 7.An updated technical search was done to identify existing assets or products that could satisfy the mission or parts of the mission. 8.Technical planning is sufficient to proceed to the next phase. 9.Risk and mitigation strategies have been identified and are acceptable based on technical risk assessments.

NPR Requirements Deliver the following products –Draft Level 1 requirements document –Preliminary Formulation Authorization Document –Mission Concept report –Preliminary Integrated Baseline

Mission Concept Study Report content 1.Mission Architecture and System Concept 2.Technology Maturity, Risk Assessment and Risk Mitigation 3.Mission Acquisition Approach 4.Cost and Schedule