ECAL and HCAL technical status 1Yu. Guz 2015/09/02.

Slides:



Advertisements
Similar presentations
LHCb HCAL PMT problems HAMAMATSU studies 1 Yu. Guz.
Advertisements

ECAL and HCAL status 1Yu. Guz 2014/11/26. TED shots, 24-Nov 2Yu. Guz 2014/11/26.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
1 Initial Tests of DHC Tower Update - 09/03/2003 Kurt Francis, Donna Kubik - Northern Illinois University.
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
Choose the right picture
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
1 TOF Aging Discussion Background information Summary of results so far Examples of gain loss mechanisms Diagnostics Possible scenarios for 2006 Discussion.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
FPIX_flip_chip_test module calibration tests November 14 th 2012.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
7/2/2003Ivan Hruska,Francisca Calheiros1 Radiation test of components for LV power supply design  Test done in PSI verification and selection.
ECAL LED monitoring system upgrade R&D status V. Egorychev, P. Shatalov, A. Zhokhov (ITEP, Moscow, Russia) E. Chernov, Yu. Guz, V. Obraztsov (IHEP Protvino,
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
MINERvA Main INjector ExpeRiment for -A is the symbol for the neutrino. The beam that is sent to MINERvA is made out of neutrinos. In chemistry, an A stands.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
Yu. Guz 13/06/ ECAL LED system : degradation of clear fibers The radiation degradation of clear fibers of the LED system is (still) well pronounced.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Photon Flux Control Liping Gan UNCW. Outline PrimEx-  experiment requirement Tagged photon Procedure to obtain the number of tagged photons Relative.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
ECAL_test_Dec_2011 INR, Moscow. Standard test bench for ECAL modules test.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Evgeny Gushchin (INR,Moscow) 23-Feb-2009 Calorimeters meeting, CERN Status of PS/SPD LED tuning C-side : SPD, PS A-side : PS Some statistics, problems.
Upgrade of the LHCb ECAL monitoring system Yu. Guz (IHEP Protvino / CERN), on behalf of the LHCb collaboration 07/04/2014.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Calorimeter and its Upgrade Pascal Perret LPC Clermont 8 December 2015 OUTLINE  Detector status  Calibration  Upgrade.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
BRANs Sune Jakobsen (BE-BI-PM) LHC BI 2015 summary
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
CALO News Pascal Perret LPC Clermont 23 October 2011.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Authors: Dmitrii Pereima, ITEP; Dmitry Golubkov, ITEP; Iouri Gouz, IHEP; Victor Egorychev, ITEP. Visualization of HCAL 137 Cs calibration data 1 CALO +
Inventory of the ECAL spare Inner modules Scanning with 137 Cs 1Yu. Guz 2013/12/04 There are 32 spare ECAL Inner modules stored in b The purpose.
Calorimeter Outline: Detector status Calibration Upgrade Yu. Guz, IHEP, Protvino.
PMT/CW Irradiation tests-2010
Voltage Divider.
ScECAL+AHCAL+TCMT Combined Beam FNAL
LHCb HCAL: performance and calibration
The MPPC Study for the GLD Calorimeter Readout
Voltage Divider.
Presentation transcript:

ECAL and HCAL technical status 1Yu. Guz 2015/09/02

ECAL LED instability issue – I 2Yu. Guz 2015/09/02 It happens that the ECAL LEDs get unstable and die. now at unacceptably high rate – not infant mortality in the Outer zone only Aug 12: 8 dead LEDs replaced; Sep – other 14 replaced to other type LEDs The LEDs become unstable before they die.

ECAL LED instability issue – II 3Yu. Guz 2015/09/02 The reason is understood: this is an unfortunately wrong choice of the LED model done in the chosen LED type (Multicomp Mega Bright OVL-5523) have very good light yield but low (lower than usual) reverse breakdown voltage (8-12 V) (easy to measure with a KEITHLEY source meter). the design of the LED driver is such that between pulses the reverse voltage of up to ~15 V can be applied to the LED  the lower is required flash magnitude, the higher is reverse voltage  therefore the Outer area suffers most now working on selecting a proper LED CREE LC503FBL1 is a good candidate:  also good brightness  also cheap: ~ 0.15 euro/pc  selection is necessary: only 60% have U BREAK >20V, minimum is ~12 V total number of LEDs is 456 (however we can choose to replace LEDs only in the Outer zone – 168) used 01-Sep for the replacement: the light yield is similar to the old LEDs (next slide). stability etc to be studied LED driver (simplified)

ECAL LED instability issue – III 4Yu. Guz 2015/09/02 LED picture after the replacement of September similar light yield (even higher in some cases) two more dead LEDs since 02-Sep.

HCAL technical status – I 5Yu. Guz 2015/09/02 One dead cell

HCAL technical status – II : dark currents 6Yu. Guz 2015/09/02 >10 nA: 158 PMTs >50 nA: 57 PMTs >100 nA: 24 PMTs The PMT degradation continues: in 2015 all the PMTs with dark current >50 nA were replaced to new ones. Order of 150 PMTs would need replacement in the winter shutdown (of course for some of them the replacement can be postponed to the 2016/2017 shutdown).

HCAL technical status – II : dark currents 7Yu. Guz 2015/09/02 No degradation is seen in PMTs replaced in 2011 and 2014 (total of 183 PMTs were replaced).

HCAL technical status – III: Cs calibration system 8Yu. Guz 2015/09/02 The previous calibration was performed on 17-Jun-2015 evening after the test, the side A Geiger counter was found not working Geiger counter is the sensor used by the safety signalization, which is very important The Geiger HV mezzanine of the Garage module had to be replaced 1-Sep-2015: the replacement was done, the signalization is operational again the source run has been performed 02-Sep-2015

HCAL Cs calibration – I 9Yu. Guz 2015/09/02 The calibration was performed on 02-Sep-2015 evening; the PHYSICS recipe updated 03-Sep

HCAL Cs calibration – II 10Yu. Guz 2015/09/02 The calibration was performed on 02-Sep-2015 evening; the PHYSICS recipe updated 03-Sep

HCAL Cs calibration – III 11Yu. Guz 2015/09/02 It seems that now ageing takes place even without high radiation doses

HCAL Cs calibration – IV 12Yu. Guz 2015/09/02 For the completeness – same ageing plot, but as a function of time.