South Halls: Ewing-Cross Renovation AE Senior Thesis: Tech. 1 Quaid Spearing CM Option September 16, 2013.

Slides:



Advertisements
Similar presentations
Potential sources of asbestos in buildings
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT September 16 th, 2013 – October 25 th, 2013.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Chatham-Kent Health Alliance Facility Renewal and Capital Infrastructure Needs Tri Board Meeting October 26, 2010.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Update on FCPS Construction/Renovation Projects August 2009.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Johanna Mikitka AE-390 October 13, 2004
W504 – Asbestos removal – Case studies. Case study 1 – Asbestos rope removal – gas production platform Removal of asbestos rope insulation from pipework.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
SCHEMATIC DESIGN PRESENTATION
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
Specific Hazards. Hazards Categories p77 Physical Mechanical /Electrical Chemical Biological Pyshosical.
Anthony J. Lucostic Construction Management AE Senior Thesis Food Science Building University Park, PA AE Senior Thesis Anthony J. Lucostic.
M AJOR T AYLOR Cycling Center AN URBAN COMMUNITY CYCLING FACILITY.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Copyright © Texas Education Agency, All rights reserved. Architectural Design The Foundation Plan.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Building Plans.
7 Mini Mall Design. Connection Quick View Architectural view.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
UNT in partnership with TEA. Copyright © . All rights reserved.
DEREK BAUER CONSTRUCTION MANAGEMENT AE SENIOR THESIS 2008 PENN STATE UNIVERSITY AE SENIOR THESIS PRESENTATION APRIL 15, 2008 OFFICE/RETAIL BUILDING WASHINGTON,
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Arlington National Cemetery Renovation Show Building Overview Picture My name Date.
Shivam Patel CM Option Technical Assignment 1 Dr Ed Gannon September 16 th 2013 Image courtesy of Hines.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Student Health Center Jacob Brambley - AE (structural option)
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
CEE 578 Senior Capstone Design Types of Construction Drawings
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
Presentation Title Here Additional Line if Needed Date Here Eden Park Pump Station Building Assessment Strategic Growth Committee June 26, 2012.
Cuba-Rushford CSD Capital Project
Upon completion of this module, you will be able to:
Foundations of Technology Construction
Capital Projects Requests
NAU International pavilion expansion
Construction Documents
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
Prince Frederic Hall Tech One Lauren Kandt PSU AE Construction Sowers
Potential sources of asbestos in buildings
HANDICAPPED PEOPLE RESIDENT
Villa Graduation Project 2 Prepared By : Abdalla Naem Dwikat
The sport hall.
WAREHOUSE RENTALS OF GEORGIA
Foundations of Technology Construction
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

South Halls: Ewing-Cross Renovation AE Senior Thesis: Tech. 1 Quaid Spearing CM Option September 16, 2013

Client Information University Park is home to ~44,000 students, of which 13,700 live on campus Why Renovate? ▫Deterioration of current MEP systems ▫Not compliant with current building/ADA codes ▫Sorority relocation Project Expectations ▫#1 Priority = Safety ▫Meet Project Schedule ▫50 Year Decisions

State College: Google Maps Vicinity Map: Google Maps Existing Conditions: Quaid Spearing Existing Conditions

Building Systems Summary Demolition ▫Asbestos Abatement: ceiling mastic, floor tiles, insulation ▫MEP systems, bathroom slabs, interior/exterior walls Brick Façade East Stone Panel Projection South Wall Section Photos by Quaid Spearing North Walkway Slab Bathroom Slab Structure Masonry

Building Systems Summary Mechanical ▫System Types: Campus steam & Chilled Water, underground utilities ▫Distribution Types: Dual pipe system, four pipe system, Air-to-Air ERV ▫Fire Suppression: Wet pipe, with attic on dry pipe MDPLDPPanel boards ElevatorsEmergencyXFRMR Curtain Wall North/South Quaid Spearing Power Riser Diagram: Quaid Spearing Electrical Excavation ▫Earth formed footings ▫no dewatering required Curtain Wall

Project Delivery System

Staffing Plan

Project Cost Evaluation Table 1: RS Means Square Foot Estimate Table 2: Building Cost Summary Comparison Significant System Costs ▫Mechanical & Plumbing ▫Electrical ▫Drywall & Ceilings Key Differences ▫Existing Structure ▫Roofing ▫Low floor heights

Project Schedule Summary

Questions???