Overview of NLC X-Band Technology and Applications Including a Compact XFEL Chris Adolphsen SLAC.

Slides:



Advertisements
Similar presentations
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Compact Linear Collider. Overview The aim of the CLIC study is to investigate the feasibility of a high luminosity linear e-/e+ collider with a centre.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
Design of Standing-Wave Accelerator Structure
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
Low Emittance RF Gun Developments for PAL-XFEL
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
X-Band Deflectors Development at SLAC
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
SLAC Accelerator Development Program: X-Band Applications Chris Adolphsen OHEP Accelerator Development Review January 24-26, 2011.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
The NLC RF Pulse Compression and High Power RF Transport Systems Sami G. Tantawi, G.Bowden, K.Fant, Z.D.Farkas, W.R.Fowkes J.Irwin, N.M.Kroll, Z.H.Li,
SLAC Accelerator Development Program: X-Band RF Power Sources Michael V. Fazio OHEP Accelerator Development Review January 24-26, 2011.
J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II.
Optimisation of single bunch linacs for possible FEL upgrades Alexej Grudiev, CERN 6/02/2014 CLIC14 workshop.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
W. Wuensch CLIC project meeting High-power rf structure testing.
CLIC developments Xband FEL linac introduction W. Wuensch Xband technology.
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
A Compact X-Band FEL Linac Chris Adolphsen SLAC. Chose X-Band technology as an evolutionary next step for the Next Linear Collider (NLC) from the SLAC.
Towards a full C-band multi-bunch/high rep. rate/high gradient injector linac D. Alesini (LNF-INFN, Frascti, Italy) With the contribution of: A. Bacci,
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
X-band Based FEL proposal
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Heung-Sik Kang Pohang Accelerator Laboratory
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Abstract EuSPARC and EuPRAXIA projects
An X-band system for phase space linearisation on CLARA
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
CLIC Damping ring beam transfer systems
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Brief Review of Microwave Dielectric Accelerators
CLIC Klystron based. Updates 2017.
Update of CLIC accelerating structure design
Measurements, ideas, curiosities
XFEL Project (accelerator) Overview and recent developments
Overview Multi Bunch Beam Dynamics at XFEL
Explanation of the Basic Principles and Goals
Operational Experience with LCLS RF systems
Presentation transcript:

Overview of NLC X-Band Technology and Applications Including a Compact XFEL Chris Adolphsen SLAC

Chose X-Band technology as an evolutionary next step for the Next Linear Collider (NLC) from the SLAC Linac S-Band (2.86 GHz) technology. In general want higher rf frequency because: -Less rf energy per pulse is required, so fewer/smaller rf components. -Higher gradients achievable, so shorter linacs (with reasonable efficiencies) Offsetting these advantages are the requirements of: -High power (100’s MW) HV pulses with fast rise times (100’s ns). -High surface gradients in the klystrons, waveguide transport system and accelerator structures. -Tight alignment tolerances due to stronger wakefields (much less an issue for light sources where the bunch charge is low, and bunch length short). X-Band (11.4 GHz) RF Technology

SLAC Linac RF Unit (One of 240, 50 GeV Beam)

NLC/GLC Linac RF Unit (One of ~ 2000 at 500 GeV cms, One of ~ 4000 at 1 TeV cm)

Next Linear Collider Test Accelerator (NLCTA) In 1993, construction began using first generation X-Band components. In 1997, demonstrated 17% beam loading compensation in four, 1.8 m structures at ~ 40 MV/m. In , added second klystron to each linac rf station. In , used for high gradient studies and other programs.

Klystrons Dual-Moded SLED II Pulse Compression Load ‘Tree’ Eight-Pack Project: Second Generation RF Unit Test Phase I: Generate RF Power and Transport to Loads Eight-Pack Modulator

RF Component Performance

Solid State Induction Modulator

Waveforms When Driving Four 50 MW Klystrons at 400 kV, 300 A Each Eight-Pack Modulator 76 Cores Three-Turn Secondary > 1500 Hours of Operation

Next Generation Induction Modulator: The ‘Two-Pack’ Features kV IGBTs with in-line multi-turn 1:10 transformer. - Industrialized cast casings. - Improved oil cooling. - Improved HV feed through. Bechtel-LLNL-SLAC 20 kV Test Stack A Hybrid 2-Pack Modulator (15 core stack driving a conventional 1:10 transformer) was built and is still being used – also built a version to drive a single ‘5045’ S-Band Tube 2-Pack Layout (never built)

RF Component Performance

X-Band Klystrons ‘XL4’ – Have built at least 15, now producing 12 GHz ‘XL5’ versions

PPM Klystron Performance (75 MW, 1.6  s, 120/150 Hz, 55% Efficiency Required) SLAC Two tubes tested at 75 MW with 1.6  s pulses at 120 Hz. Efficiency = 53-54%. KEK/Toshiba Four tubes tested at 75 MW with 1.6  s pulses at 50 Hz (modulator limited). Efficiency = 53-56%.

Character of events suggest they originate in output cavity – visual inspection inconclusive so far. At 75 MW, iris surface field ~ 70 MV/m, lower than in 3% v g structures, but higher than sustainable (~ 50 MV/m) in waveguide with comparable v g (~ 20%) as the klystron TW output structures. May require multi-beam klystron approach for stable > 50 MW, 1.6  s operation. KEK PPM2 Output Structure Time (100 ns / div) Reflected Transmitted Power – Normal Pulse Power – Tear Event Klystron Tear Events 14 mm

For RF Unit Test, Four 50 MW Solenoid-Focused Klystrons Installed in the Eight-Pack Modulator (In Place of Two 75 MW PPM Klystrons)

RF Component Performance

First Generation RF Pulse Compression (SLED II) at NLCTA

TE 01 TE 02 TE 01 For NLC/GLC, Use Dual Moded Delay Line to Reduce Delay Line Length in Half

Also Use Over-Height Planar Waveguide to Lower Surface Fields Design for < 50 MV/m for 400 ns pulses Example: Power Splitter

Dual-Moded SLED-II Performance (475 MW, 400 ns Pulses Required) Combined Klystron Power Output Power (Gain = 3.1, Goal = 3.25)

RF Component Performance

NLC Accelerator Structure Requirements Convert rf energy to beam energy efficiently. Short-range transverse wakefields small to limit linac emittance growth: iris radius limited to 17% of rf wavelength (i.e. a/ = 17%). Long-range wakefields suppressed so bunch train effectively acts as a single bunch. Dipole mode power coupled out for use as guide for centering the beam in the structure. Operate reliably at the design gradient and pulse length. NLC/GLC Structures were developed by a FNAL/KEK/SLAC collaboration – CERN/KEK/SLAC now developing 11%-13% a/ structures that run at ~ 100 MV/m

High Gradient Structure Development 50 cm ‘T53’ Structure Since 1999: -Tested about 40 structures with over 30,000 hours of high power operation at NLCTA. -Improved structure preparation procedures - includes various heat treatments and avoidance of high rf surface currents. -Found lower input power structures to be more robust against rf breakdown induced damage. -Developed NLC-Ready ‘H60’ design with required wakefield suppression features.

H60 Structure Cells and Coupler Assembly Cells with Slots for Dipole Mode Damping Port for Extracting Dipole Mode Power High Power Output Coupler

Wakefield Damping and Detuning Time of Next Bunch Time After Bunch (ns) Wakefield Amplitude (V/pC/m/mm) Measurements Ohmic Loss Only Damping and Detuning Detuning Only Dipole Mode Density Frequency (GHz)

Hours of Operation Breakdown Rate History (Goal < 0.1/hr) Four H60 Structures at 65 MV/m  = 400 hr  = 600 hr  = 400 hr Breakdown Rate at 60 Hz (#/hr) with 400 ns Pulses Hours of Operation

RF Unit Test in From Eight-Pack 3 dB Beam From Station 2 From Station 1 Powered Eight H60 accelerator structures in NLCTA for 1500 hours at 65 MV/m with 400 ns long pulses at 60 Hz and accelerated beam

Efficiency (%)DesignAchievedComment Two-Pack Modulator 7060 Use Integrated Transformer (> 70% Expected) PPM Klystron ~ 60% Possible SLED II8178Improve Flanges/Fab/Assembly Wave Guide Transport 9277 Use Design Layout / Reduce High-Loss WG Structures3129Use Round Cell Shape RF Component Efficiencies

High Power (Multi-MW) X-Band Applications Energy Linearizer –Single Structure: in use at LCLS, planned for BNL, PSI, Fermi/Trieste and SPARX/Fascati Deflecting Cavity for Bunch Length Measurements CERN Linear Collider Structure Development 100’s of MeV to Many GeV Linacs –LLNL 250 MeV linac for gamma-ray production –SLAC 600 MeV energy ‘dither’ linacs for LCLS II –LANL 6-20 GeV linac for an XFEL source to probe proton-matter interactions –SPARX 1-2 GeV X-Band linac for their FEL –SLAC study of a 6 GeV Linac for a Compact XFEL (CXFEL) source See my Thursday talk in WG4 for more details

CERN/CLIC X-band Test-Stand (Under Construction) CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor Mode convertors RF Valve Circular pumping port

CLIC WS 10/2009KM Schirm BE-RF 31

ParametersymbolLCLSCXFELunit Bunch Charge Q 250 pC Electron Energy E 146GeV Emittance  x,y µmµm Peak Current I pk 3.0 kA Energy Spread  E /E % Undulator Period u 31.5cm Und. Parameter K Mean Und. Beta ββ 308m Sat. Length L sat 6030m Sat. Power P sat 3010GW FWHM Pulse Length  80 fs Photons/Pulse NN Compact X-Ray (1.5 Å) FEL

Linac MeV Linac GeV Linac-3 6 GeV BC1BC2 Undulator L = 40 m S rf gun X undulator LCLS-like injector L ~ 50 m 250 pC,  x,y  0.4  m X-band Linac Driven Compact X-ray FEL X X X-band main linac+BC2 G ~ 70 MV/m, L ~ 150 m Use LCLS injector beam distribution and H60 structure (a/ =0.18) after BC1 LiTrack simulates longitudinal dynamics with wake and obtains 3 kA “uniform” distribution Similar results for T53 structure (a/ =0.13) with 200 pC charge

UnitsCXFELNLC Final Beam EnergyGeV6250 Bunch ChargenC RF Pulse Width * ns Linac Pulse RateHz120 Beam Bunch Lengthμm7110 Operation Parameters * Allows ~ ns multibunch operation

Layout of Linac RF Unit 50 MW XL4 100 MW 1.5 us 400 kV 480 MW 150 ns 12 m Nine T53 Structures (a/ = 13%) or Six H60 Structures (a/ = 18%)

NLC RF Component Costs (2232 RF Units) Cost (k$) per Item LLRF26.1 Modulator83.7 Klystron56.6 TWT13.3 SLED-II242.3 Structures21.5 For the 6 GeV CXFEL, assume the cost per item will be 4 times higher. For 70 MV/m operation: UnitsT53H60 Total RF units1824 X-Band Linac Lengthm Total Accelerator Lengthm X-Band Linac CostM$5662

Assuming 1) Tunnel cost 25 k$/m, AC power + cooling power 2.5 $/Watt 2) Modulator efficiency 70%, Klystron efficiency 55%. Gradient Optimization

Structure Breakdown Rates with 150 ns Pulses 1)H60VG3R scaled at 0.2/hr for 65 MV/m,400 ns, 60Hz 2)T53VG3R scaled at 1/hr for 70 MV/m, 480 ns, 60 Hz 3)Assuming BDR ~ G 26, ~ PW 6 At 70 MV/m, Expect Rate Less Than 0.01/hr at 120 Hz

Single Bunch Wake Tolerances In both Linac-2 and Linac-3, short-range transverse wakefields in H60 are not a major issue in that: - An injection jitter equal to the beam size yields a 1% emittance growth in Linac-2 and.003% growth in Linac-3 - Random misalignments of 1 mm rms, assuming 50 structures in each linac, yields an emittance growth of 1% in Linac-2, 0.1% in Linac-3. With the T53 structure, the jitter and misalignment tolerances are about three times smaller for the same emittance growth. The wake effect is weak mainly because the bunches are very short.

X-Band Revival The 15 year, ~ 100 M$ development of X-band technology for a linear collider produced a suite of robust, high power components. With the low bunch charge being considered for future XFELs, X-band technology affords a low cost, compact means of generating multi-GeV, low emittance bunches. –Gradients of MV/m possible vs ~ 25 MV/m at S-Band and ~ 35 MV/m at C-Band The number of XFELs is likely to continue to grow (e.g., normal conducting linacs being considered in Korea and China). To expand X-band use, need to have components industrialized and a small demonstration accelerator built, such as the 150 MeV C-band linac at Spring-8 in Japan where they have done light source studies.