Lessons Learned – Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International Charlie Jackson, PSP,

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Microsoft Project Tutorial for Chapters 6 & 7
RCM-Tool v1.0 Demo Performing Welcome to the RCM-Tool RCM-Tool
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
©2012 Construction Science, LLC 1 Primavera P6 Settings Presented by Karen Reynolds, Partner Construction Science, LLC.
Systems Analysis and Design 9th Edition
Microsoft Project.
Building Your Project Work Plan in March 2, 2007 HP Project & Portfolio Management by Dan Gallagher See NOTES page for Presentation Discussion, Tips &
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Reviewing & Analyzing Schedule
Chapter 3: The Project Management Process Groups
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
MCDST : Supporting Users and Troubleshooting a Microsoft Windows XP Operating System Chapter 5: User Environment and Multiple Languages.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Maintaining Windows Server 2008 File Services
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
The What Why and How.  MCTS  These certifications provide the foundation for Microsoft Certification  MCITP  These certifications build on the technical.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Microsoft Project – Tutorial 2 Project Goal network company computers to easily share resources within a time frame of three months and within a budget.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Edward B. Farkas, Managing Director, Project Management Practice
Primavera Highlights During COLLABORATE  Primavera Key Note: Making the Most of Your Oracle Primavera Investment Dick Faris, Primavera Co-Founder & Oracle.
Solutions Summit 2014 Discrepancy Processing & Resolution Terri Sullivan.
System Analysis and Design
Lecture 1 Saima Gul. What is a Project? A Project is a job that has a beginning and an end (time), a specified outcome ( scope) at a stated level of quality.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
INTRODUCTION TO PRIMAVERA PROJECT MANAGEMENT MODULE (P6) The Primavera Project Management module is comprehensive, multi- project planning and control.
The Project Plan IT Project Management COSC
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Project Management Software Application PRM 705 Lecture 32 1.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Chapter 3 Managing the Information Systems Project
Improved Project Control Through CPM Scheduling What Owners, PM’s and CM’s Need to Know t H E T I B U R O N T I B U R O N G R O U P, L L C G R O U P, L.
Proposal Processing Proposals, Staffing Profiles, Financial Summary Hewlett-Packard Project & Portfolio Management Project & Portfolio Management Slide.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Hannah Schumacher, PSP, LEED AP, PMI-SP Hill International Charlie Jackson, PSP, Primavera Certified Trainer Project Life Span, LLC Construction CPM Conference.
Microsoft Office 2013 Try It! Chapter 4 Storing Data in Access.
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Proposal Processing Proposals, Staffing Profiles, Financial Summary Hewlett-Packard Project & Portfolio Management Project & Portfolio Management Slide.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Performing a Critical Path Analysis Presented by Jonathan Japka, PMP Japka Management Moorestown NJ
Microsoft Project Mastering Microsoft Project 2010 Instructor: Tom Vorves Dial In:1 (800)
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference ERP Fixed Assets ERP Fixed Assets Presented by: Will Brock ERP Programmer PowerPoint.
VA Primavera P6: Creating a Project and Work Breakdown Structure (WBS) Department of Veterans Affairs Office of Information and Technology IT Workforce.
VA Primavera P6: Baselining the Project Department of Veterans Affairs Office of Information and Technology IT Workforce Development (ITWD) in collaboration.
VA Primavera P6: Resource Attributes and Assigning Resources Department of Veterans Affairs Office of Information and Technology IT Workforce Development.
Fundamentals of Project Management and Schedule Development.
© 2008 Prentice HallAppendix A -1 Introduction to Project Management Appendix Microsoft Project Tutorial Information Systems Project Management: A Process.
New Task Properties UI Change most tabs to Property/Value grids Provide option to dock Task Properties on the side (vertical layout) or on the bottom (horizontal.
Schedule Margin July 2013 NAVY CEVM
Software Planning Guidelines
Introduction to Project Planning & Scheduling Software Microsoft Project Prepared by; Emedya Murniwaty Samsudin emedya murniwaty samsudin_msp2013 sem 2.
In this tutorial you will:
SSI Toolbox Status Workbook Overview
Schedule Margin July 2013 NAVY CEVM
Schedule Margin July 2013 NAVY CEVM
CAD DESK PRIMAVERA PRESENTATION.
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Lessons Learned – Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International Charlie Jackson, PSP, Primavera Certified Trainer Project Life Span, LLC Construction CPM Conference

Author Biography – Charlie Jackson Position / Company: Vice President Project Life Span, LLC Degree / University: BA Journalism Baylor University, Waco, TX Years of Experience / Background: 17+ years in the construction industry, primary focus on scheduling application, with a focus on scheduling practices and project controls implementation

Author Biography – Hannah Schumacher Position/Company: Managing Consultant, Construction Claims Group Hill International Degree/University: BS – Construction Management BS – Building Construction Technology Wentworth Institute of Technology, Boston, MA Years of Experience / Background: 23+ years in construction industry, primary focus on planning, scheduling, project controls, and claims services Clients: Owners, Developers, Construction Managers, General Contractors, Subcontractors Project experience: commercial, residential/custom homes, multi- family/student housing, retail, hospital, medical, hospitality, education, casino, correctional, infrastructure, public works and industrial sectors

Lessons Learned – Schedule Updating & Maintenance using Primavera P6  Many specifications are requiring the use of the latest Primavera software (P6).  Our presentation focuses on the use of Primavera P6 to update and maintain schedules.  The Schedule Update Process consists of 4 main steps: 1. PLAN 2. UPDATE 3. REVIEW / ANALYZE 4. COMMUNICATE 4

Lessons Learned – Schedule Updating & Maintenance using Primavera P6  PLAN Understand Contract and Specification Requirements Determine Update Frequency Establish Baseline / Contract Schedule Assign Responsibility to each activity Provide Training Gather Data Visit Job site, hold update meeting, and validate data Understand P6 settings that affect updates 5

Lessons Learned – Schedule Updating & Maintenance using Primavera P6  Understand Contract and Specification Requirements Frequency of updates Procedures for updates versus revisions Earned Value requirements Cost and/or resource status requirements Change management procedures Software requirements 6

Lessons Learned – Schedule Updating & Maintenance using Primavera P6  Determine Update Frequency Factors to consider: Contract Requirements Internal company policy Project budgeting Considerations Benefits to frequent updates: Greater accuracy of as-built documentation Promotes early identification of issues Promotes timely issue resolution / mitigation Enhances user’s skill in application & management of schedule Provides starting point to which user can return if errors are made in updating process 7

Lessons Learned – Schedule Updating & Maintenance using Primavera P6  Establish Baseline / Contract Schedule Baseline is the accepted as-planned schedule (Contract Schedule) In Primavera “Baseline” is a snapshot of project plan (similar to “Target” in P3) Number of baselines (maximum number is set by Administrator) User can assign up to 3 baselines to current schedule for data comparisons Can copy baselines when copying project 8

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Assign Responsibility to each activity Use Activity Code Global vs. Project Specific Group and Sort by Activity Code 9

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Assign Responsibility to each activity Assign Resource / Role CAUTION: Resources and Roles are Global (use unique identifier) Group by resources in Assignments window 10

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Provide training How to update the schedule How to review the schedule How to add fragnets for change management Content of update reports What information is needed from each individual 11

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Gather Data – Use Update Layout or Report Visit the jobsite, hold an update meeting, and validate data 12

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Understand P6 settings that affect updates Security access settings Based on Organizational Breakdown Structure (OBS) Read / Write access can be defined down to the Work Breakdown Structure (WBS). Set by the Administrator (Admin, Security Profiles) 13

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Understand P6 settings that affect updates Percent Complete Types Duration Percent Complete (default) Physical Percent Complete Units Percent Complete Default type defined at the Project Level (Projects Details, Defaults tab) and can be changed at the Activity Level (Activity Details, General Tab) Project Level defaults only apply to new activities. 14

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Understand P6 settings that affect updates Duration Types Fixed Duration and Units (default) Fixed Duration and Units/Time Fixed Units Fixed Units/Time 15

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Understand P6 settings that affect updates Activity types Milestones Task Dependent and Resource Dependent Level of Effort and WBS Summary Default Activity type is set at Project Level (Project Details, Defaults tab) Change type at Activity Level (Activity Details, General tab) 16

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Understand P6 settings that affect updates Calculation settings (General) Relationships to and from other Projects Open ends Schedule Calculation options Retained Logic Progress Override Actual Dates Critical activity definition Calculate SS lag Float definition Calendar for scheduling relationship lag 17

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Understand P6 settings that affect updates Resource settings Resource Details for Labor, Nonlabor, Material Auto Compute Actuals Calculate costs from units Activity Details Override Resource Details settings 18

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Understand P6 settings that affect updates Resource settings at Project Level (Project Details, Calculations tab) Link Actual and Actual This Period Units and Costs (when using Financial Periods) Resources Drive activity dates by default (Project Details, Resources tab) 19

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Understand P6 settings that affect updates Financial Periods Defined at Admin Level (Admin menu, Financial Periods) CAUTION: Financial Periods are GLOBAL 20

Lessons Learned – Schedule Updating & Maintenance using Primavera P6  UPDATE Opening the file – (Exclusive / Shared / Read Only) Importing and Configuring ‘Outside’ Information Maintain Baseline Rename File Assign and Compare Baselines Enter Status (dates, percent complete, resources, costs) Enter Revisions / Forecast (activities, durations, logic) 21

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Opening the file Exclusive only one user can change / modify the schedule Recommended to use when updating / statusing Shared multiple users can change / modify the schedule AT THE SAME TIME CAUTION: this is the default when selecting project from Project Window, right-click, select Open Read Only view only mode can not change / modify the schedule 22

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Importing and Configuring ‘Outside’ Information Import Configuration utility – how to handle duplicate data. Do Not Import Insert New Keep Existing Update Existing Delete 23

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Maintain Baseline (Activity window, Project, Maintain Baseline) Rename File to new version (i.e. EX00  EX01) (Project Window) P6 allows user to copy current schedule as a ‘Reflection’, make changes and merge back into current schedule CAUTION: The following data items when deleted in a Reflection copy WILL NOT be deleted in current schedule during the merge: Activities, Relationships, Resource Assignments, WBS elements, Work Products and Documents, Project Expenses, Project Issues and Project Risks. These would need to be manually deleted. (Oracle Knowledgebase ID ) 24

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Assign and Compare Baselines Project: Standard baseline for comparison for all users (typically the Contract Baseline Schedule) User Baseline (Primary, Secondary, Tertiary) Primary Baseline allows for dates, resource, etc. comparisons Secondary and Tertiary compare date information only Check earned value settings (Admin, Earned Value, Earned Value Calculation) These settings determine which baseline dates will be used for comparison. 25

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Prior to statusing, make sure time is shown to alleviate non- standard start/finish times (Edit, User Preferences) 26

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Enter Status Actual Start dates Actual Finish dates Percent complete Remaining duration Resources and/or Costs Enter Manually Apply Actuals (Tools menu, Apply Actuals) Update Progress (Tools menu, Update Progress) CAUTION: Apply Actuals and Update Progress use PLANNED Dates versus Scheduled Dates or Early Dates which may be different Calculate the schedule (Tools, Schedule) with new Data Date Recommendation: To improve speed and efficiency of the program, turn off option to “Schedule automatically when a change affects dates” Review data entered Maintain Baseline (with ‘Status only’ in title) 27

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Enter Revisions / Forecast New Activities Delete Activities (Do not reuse Activity IDs) Revise Logic Revise Durations Calculate the schedule (Tools, Schedule) with new Data Date CAUTION – To improve speed and efficiency of the program, turn off option to “Schedule automatically when a change affects dates” Review data entered Maintain Baseline (with ‘Revision’ added to title) Review compared to ‘status only’ update as well as previous update and Baseline schedule 28

Lessons Learned – Schedule Updating & Maintenance using Primavera P6  REVIEW & ANALYZE Review and Verify data input (Scheduler self-check) Compare to previous update and Contract schedule Review Logic reports / Layouts and Changes made Finalize and Maintain Baseline (of this finalized update) 29

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Review P6 Scheduling / Leveling Report (Tools menu, Schedule) 30

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Review and Verify data input (Scheduler self-check) Open Ends (activities with no Predecessors and / or Successors) Dangling Relationship ties (Start to Start and/or Finish to Finish ties without a Predecessor and/or Successor) Incorrect and non-overlapping lag ties that result in gaps in sequencing Start to Start lag that exceeds the activity duration Finish to Finish lag that exceeds the successor duration Finish to Start lag Out of Sequence progress Actual dates in the future Incorrect times Calendars Activities on the data date (verify predecessor logic) Excessive float values Negative float New activities, durations, logic and impact to plan Critical Path and Near Critical Path Constructability issues Stacking of trades 31

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Compare to previous update and Contract schedule Create comparison layouts Assign appropriate baseline (Project menu, Assign Baseline) Select baseline bars (View, Bars) and baseline data columns Note: varying baseline types (Project vs. User Baselines – Primary, Secondary, Tertiary) allow for different levels of data for comparison. Check earned value settings (Admin Preferences, Earned Value) Determines what dates will be used for comparison – Planned or Start/Finish Recommendation: use “Budgeted values with current dates” CAUTION: Setting is global, not project specific, affects all projects in the database 32

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Comparison layout: 33

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Review Logic reports / Layouts and Changes made Schedule Log Claim Digger Tabular Reports Schedule Analyzer for the Enterprise (SAe) 34

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Once the entire team has reviewed and approved the draft update, finalize and Maintain Baseline Maintain Baseline (Project, Maintain Baseline, Save Copy) Export Backup to safe location(s) 35

Lessons Learned – Schedule Updating & Maintenance using Primavera P6  COMMUNICATE Layouts Reports 36

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Layouts Global (available to all projects in the database) User (available to only the user) Project (specific only to the project) Bar charts Look ahead schedules Critical Path Near Critical Path Responsibility sorts 37

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Time Scale Logic (available in P6 v7 Service Pack 3) (Tools, Time Scale Logic Diagram) 38

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 Standard Reports Schedule Resource Cost Customized Reports using Report Editor or Report Wizard 39

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 CONCLUSION Understand contract and specification requirements Understand the P6 settings that affect updates Provide training to those responsible for providing and reviewing the update data Visit the jobsite and walk the job Hold an update meeting and verify data Update Frequently Review and Analyze the schedule Maintain Baselines for comparison Compare to previous updates and Baseline Schedule Communicate the schedule using Reports and Layouts 40

Lessons Learned – Schedule Updating & Maintenance using Primavera P6 We hope that you can use schedule updating and maintenance lessons learned outlined in this presentation to update your schedules quickly and efficiently using Primavera P6™ Questions? 41 Hannah SchumacherCharlie Jackson Managing ConsultantVice President Hill International (602) (702)