Industrializing the Building Construction Process Dr. Mohamed Al-Hussein 1 A Real Solution
Residential Construction Material Waste Minimization (by volume)
EMISSIONS ANALYSIS: ON-SITE CONSTRUCTION CO2 EMISSION 23%
4 CO2 Emissions from Transportation and Crew Trips Tasks Duration (hr) Material TripsCrew TripsCO2 (kg) Load Drywall215t truck 46.4 Drywall Boarding 32 5t picker4 0.5 truck kg of CO2 per kg of manufactured drywall MJ/Kg of manufactured drywall kg CO2/sf of manufactured drywall 3
5 The cost of weather protection & scaffolding Building 4-times
Replacing 7-Studnet dorms bungalows With 5- each is 3-story in one summer The challenge is how to assemble on site these 5 3-story each in 10- working days
7 June 15
10
Other level of industrialization & its Application
12 Today’s Technical Challenges Drafting For Manufacturing (DFM) Lean Manufacturing BIM Modeling Beyond BIM Supporting Tools
13 Industrialization creates new requirements for design Current Drafting software Does NOT support the manufacturing
14 ALGORITHM ANALYSIS: FRAMEX 3D Model Floor plan 45,000 + lines of Code
CUTEX: 2D-OPTIMIZATION SheetsResidual Non-Guillotine cutting Gilmore-Gomory Cutting pattern Possible cuts Cutting pattern vector Waste Guillotine cutting
CUTEX: 2D-OPTIMIZATION (CON) Waste : 2.4%
Beyond BIM: Lifting Scenario 19 Scenario 1 Kullman Arrangement one a time (1-Building in 2- days) -Background Color –one day of operation -Box – module number, sequence, Advance-Present -A, B, B1 – spots for module lifting -PB1 – place building 1
20 What is happening in Europe
21
22