Margaret St Bike Blvd & McKnight Trail Reuben Collins Department of Public Works Capital and Transportation Planning
In a Nutshell ASK: $400,000 PURPOSE: Design YEAR: 2017 WHY: Prepare for 2018 Construction
The Project Margaret Street Bike Blvd McKnight Road Trail Bike Blvd: Low Volume, Low Speed, Residential Roadway Parallel to high volume arterial
This sounds familiar… 2014 CIB Funds: $100,000 We used that money for: Public Process Concept Identification Initial Implementation Project Website:
Bike Blvd: 3 Essential Steps 1)Route Identification & Branding 2)Traffic Calming 3)Arterial Crossing Treatments
INSERT PICTURE OF ROUTE SIGNS
Bike Blvd: 3 Essential Steps 1)Route Identification & Branding 2)Traffic Calming 3)Arterial Crossing Treatments
Traffic Calming 85 th % Speeds: mph Max Speeds: ???
2013 Daily Traffic Volumes Margaret = ~1,000 Forest = 2,300 Earl = 4,700 Johnson Pkwy = 11,300 White Bear = 17,500 Ruth = 6,600 McKnight = 15,700
Traffic Calming & Arterial Crossing Proposed Elements Atlantic Hazelwood Flandreau Hazel Winthrop Forest Earl Johnson Ruth White Bear McKnight TRAFFIC CIRCLES BUMPOUTS OTHER
McKnight Road
Existing Traffic Signals Minnehaha Conway Hudson
2016 Margaret
Federal Funding Request
Questions?