1 AGATA – Ch. VEYSSIERE 09/07/2008 A. BOUTY; S. BROUSSARD; A. LOTODE; Y. MARIETTE; Ch. VEYSSIERE: CEA/DSM/IRFU/SIS D. BAZZACCO: Univ. Padova E. FARNEA;

Slides:



Advertisements
Similar presentations
Detector Characterisation Group
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ Proposal of the ECAL CW base modification + Anatoli, Michail ( Michail Soldatov.
Analog to Digital Converters (ADC) 2 ©Paul Godin Created April 2008.
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
Spectrum analyser basics Spectrum analyser basics 1.
Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.
Electrical Power Systems
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
Tests of a 10cm by 10cm triple GEM detector
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
1 Hall D Drift Chamber ElectronicsFJ Barbosa Drift Chamber Review6-8 March 2007 Electronics for CDC and FDC Hall D 1.Motivation 2.ASIC Development 3.Preamp.
Detectors and Preamplifiers Detector deliveries Customer Acceptance Tests Available detectors AGATA triple detectors Scanning program P. Reiter IKP University.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
1 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.
Wolfram KORTEN, JRA-02 AGATAEURONS PCC-Meeting, Mainz (Germany), April 2006 Status of the AGATA project Recent developments Milestones and deliverables.
Measurement of Ge detector by New cooling KEK Apr 25 th K.Shirotori.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.
Measurement of Ge detector by New cooling system KEK May 30 th K.Shirotori.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
False asymmetries/Ground Loops David Bowman 4/27/12.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
 Digitisation P.Medina  Pre-processing I.Lazarus GTSM.Bellato GTSM.Bellato  PSA P.Desesquelle R.Gernhäuser 7 th AGATA Week, Uppsala, July 8-11, 2008.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
AGATA Detector Meeting March 16th, 2006, Cologne Detector Acceptance Tests: delivered: three symmetric detectors S001 properties excellent S002 properties.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
1 The control of the Virgo mirrors is realized using coil-magnet actuators Can this technique be used in ET, from room to cryogenic temperatures? Is the.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
SiPM Workshop EU-FP7(HP3), Vienna, 16 Feb F.G. H.O. Study of scintillator detectors time resolution with different SiPM readout on T10 test beam.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
Cosmic Microwave Technology, Inc.
Plans for this week MWPC: wire stretching today
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
PID meeting SNATS to SCATS New front end design
Calorimeter Mu2e Development electronics Front-end Review
Baby-Mind SiPM Front End Electronics
Power Supply Development for JEDI Polarimeter Modules
Detectors and Preamplifiers
Monitoring system commissioning
Status of the AGATA installation at GANIL
cooling and supports of the forward endcap EMC
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
New pre study The setup results.
AGATA Detector Work Performed at Saclay in lessons learned -
Development electronics SIPM-MU2e
Status of the AGATA installation at GANIL
CAT of AGATA detectors &
DT Infrastructure: LV, HV, Gas
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
EMC Electronics and Trigger Review and Trigger Plan
BESIII EMC electronics
Development of hybrid photomultiplier for Hyper-Kamiokande
Presentation transcript:

1 AGATA – Ch. VEYSSIERE 09/07/2008 A. BOUTY; S. BROUSSARD; A. LOTODE; Y. MARIETTE; Ch. VEYSSIERE: CEA/DSM/IRFU/SIS D. BAZZACCO: Univ. Padova E. FARNEA; A. GADEA; R. MENEGAZZO: LNL P. JONES: Univ. Jyväskylä T. ENGERT; T. HABERMANN; I. KOJOUHAROV: GSI J. CACITTI; M. TRIPON: GANIL DSS tests in LEGNARO 22 nd to 25 th April 2008

2 AGATA – Ch. VEYSSIERE 09/07/2008 Goal of these tests Realized with the detector S001 To test the AXIS low voltage crate: –48V –±6V; ±12V for the preamps –6.5V for the HV Box (Proto #1) To test the HV box in an other environment (GSI (2006) -> LNL) To Test the last version of the GUI developed by GSI

3 AGATA – Ch. VEYSSIERE 09/07/2008 The “AXIS” Box

4 AGATA – Ch. VEYSSIERE 09/07/2008 The AGATA Box

5 AGATA – Ch. VEYSSIERE 09/07/2008 S001 – HV Box (proto #1)

6 AGATA – Ch. VEYSSIERE 09/07/2008 Poor Man’s Digitiser

7 AGATA – Ch. VEYSSIERE 09/07/2008 Means for the tests Comparatives tests: –Patrice Medina 48V / AXIS –±6V; ±12V NIM/ AXIS –6.5V AXIS + HV Saclay/ Silena module Following analysis from Dino Bazzacco: PStestsWeek17-1.doc

8 AGATA – Ch. VEYSSIERE 09/07/2008 Mechanical mounting of the LV crate Reference spectrum at high and low gain AXIS crate mounted (just grounded)  E HG = 2.52 keV at 1332 keV  E LG = 2.75 keV at 1332 keV

9 AGATA – Ch. VEYSSIERE 09/07/2008 Mechanical mounting of the PLC PLC mounted (outside of the cabinet) and switched on Replacement of the 24V PS of the PLC by a linear floating PS; 6V and 12V AXIS on  E HG = 2.57 keV at 1332 keV  E LG = 2.63 keV at 1332 keV

10 AGATA – Ch. VEYSSIERE 09/07/2008 Test of LV from AXIS (6V, 12V) versus NIM Final frequency spectra (100 k sample) before shutting down the HV Red:HG LV from Axis Green:HG LV from NIM bin Blue:LG LV from Axis Cyan:LG LV from NIM bin The spectra are very similar, with the ones using Axis slightly better at the lowest frequencies and those using NIM having lower amplitude in the peaks at 23 and 46 kHz.

11 AGATA – Ch. VEYSSIERE 09/07/2008 Test of the 48V (1/2) With the Patrice 48V With the AXIS 48V

12 AGATA – Ch. VEYSSIERE 09/07/2008 Test of the 48V (2/2) 48V AXIS with improvement on the grounding (copper braid shortened) With the Patrice 48V Green and blue when adding a 400 and 600W resp.

13 AGATA – Ch. VEYSSIERE 09/07/2008 Using a GPBox (dual core preamp. inside) Red: 6, 12 and 48 V Axis Green: LV NIM, 48V Patrice

14 AGATA – Ch. VEYSSIERE 09/07/2008 Comparison of AGATA and Silena HV Using AXIS LV Energy resolution (in keV) derived from INP UnfilteredFiltered with 3  s Filtered with 6  s HV Silena high gain HV AGATA high gain HV Silena low gain HV AGATA low Gain

15 AGATA – Ch. VEYSSIERE 09/07/2008 Noise spectra after 6  s shaping trapezoidal shaping RedHV Silena (high gain signal) GreenHV AGATA “” BlueHV Silena (low gain signal) CyanHV AGATA “”

16 AGATA – Ch. VEYSSIERE 09/07/2008 Integrated power spectra after ~6  s trapezoidal shaper RedHV Silena (high gain signal) GreenHV AGATA “” BlueHV Silena (low gain signal) CyanHV AGATA “” keV

17 AGATA – Ch. VEYSSIERE 09/07/2008 Problems to be solved: Voltage regulators associated to long cables generate oscillations: regulators to be changed, Temperature too high in the 48V module: –Geometry to be modified to improve the air path on the heat sink, –Vicor 600W PS to be tested. To check its influence on the signal, –Water cooling? When profibus is reconnected, the crate stops briefly, Safety of the 6 and 12V should not be linked with the 6.5V (when 6 and 12V stop, HV stops also), 48V offset to be reduced, Connectors (front panel Sub-D, 24V connectors, Profibus-DP)

18 AGATA – Ch. VEYSSIERE 09/07/2008 Some problems can be avoided… Reconnecting the PA when voltage is set induces an inrush current that trigs the safety of the 6 and 12V: not to be done… Removing the safety on the overcurrent might be dangerous in some cases. July tests of revised AXIS box at Legnaro – on platform -Production Digitiser -Detector (Single detector ?) -Integration with rest of DSS ongoing

19 AGATA – Ch. VEYSSIERE 09/07/2008