- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

COST EFFECTIVE MASS HOUSING TECHNOLOGY
Timber Portal Frame Construction
Lightweight Forming System and Roofs for Concrete Floors.
Al-Shandagha Revitalization Dubai, UAE, 1996 Adil Abdalla Restoration Architect, then Head of Research Unit, Historical Buildings Section, Dubai Municipality.
Experimental Testing of Drift- Sensitive Nonstructural Systems – Year 4 The Pathways Project San Jose State University Equip Site:
Emerging Technologies for Housing & Building Construction
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
Concrete Fooring & Roofing System
Brief Introduction of 3D Construction System
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Structural System Overview
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
Fundamentals of Building Construction, Materials & Methods, 5 th Edition Copyright © 2009 J. Iano. All rights reserved. Plant-Cast Precast Concrete Concrete.
Wall construction steps and illustrations Incan construction.
Concrete Pre Cast Panel By Peter Spence ID:
Lecture Goals Slab design reinforcement.
Arch 330 Fall 2008 FORMWORK AND REINFORCING FOR CONCRETE.
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
Reinforced Concrete VS Steel
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
Reinforced Concrete Design II
Rectangular framed structures
Beam and Slab. Site cast that is cast into forms on site. Typically used for storage facilities, and libraries because it can withstands heavy loads with.
Cellular construction
Topic C1 Superstructures - walls
PRE-FABRICATED STRUCTURES
Major Assignment Construction & Structures SRT251 Lecturer: J.J. Ham Kylie Dalton
Commercial Structural Framing Systems The Skeleton of the Building The structure of life I have described in buildings... is deeply and inextricably connected.
Prefabricated Timber Frame Construction
THE MITCHELL FRAMING SYSTEM A building system that encourages homeowners to have a direct involvement in driving building growth and expansio n Neal Mitchell.
Introduction to a pit installation
Tying together means and methods in a Methods of Construction – Concrete & Masonry curriculum A Faculty Perspective Case Study.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Introduction to Proprietary Formwork Systems By Paul Markham.
3D Panel Construction System
AFFORDABLE MASS HOUSING DELIVERY By Babajide Alade, B.Arch, MRED, MBA, October B George Street Ikoyi, Lagos State, Nigeria
The four basic types of structures are :
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Caretakers House Demolition Decking to STEM and ARTS.
Name ________________ Unit 6/P6 – Concrete Construction Expensive Heavy and dense = strong, sound proof and thermally efficient. Cast in situ or pre-cast.
Slide 1 Computer Control The Gig. Slide 2 What features in the program can help us run the lighting & smoke effects? The computer is good at controlling.
Week 6 Timber based columns
QuickWalls® strong. fast. simple. *Light Weight *Insulated
TYPE OF STAIRS STRAIGHT-RUN STAIRSQUARTER-TURN STAIR HALF-TURN STAIR SPIRAL STAIRS WINDING STAIR CIRCULAR STAIR Building construction illustraded 4 th.
Economical Design of Concrete Buildings Lawrence Novak.
Garage Project Presentation Accu-Crete 2/28/2016.
NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD E.T.& L. CORP.
Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements.
FORMWORK BUILDING CONSTRUCTION PREPARE BY:-
Construction Methodology for Suramadu Main Bridge.
Integrated Design : Building Scale | Prof. Craig Schwitter, Prof
Introduction to composite construction of buildings
INTRODUCTION to EUROFORM
Prefabricated Timber Frame Construction
Construction Technology
“Building Better for the People of the World”
FORMWORK FORMWORK COMPONENTS Scaffold frames Plywood
CONCRETE FORMWORK Formwork.
What are the Requirements of an Effective Construction System?
Minuteman Vocational Technical Regional High School Progress
Concrete Structures DR. Nabil Dmaidi.
SAB 3122 CONSTRUCTION TECHNOLOGY AND ESTIMATING CONCRETE AND REINFORCEMENT Dr. Chai Chang Saar.
Building Frame (Column & Beam)
Presenter Tony Bosnich 2015
Monolithic Concrete Construction using Aluminum form work system
Commercial Structural Framing Systems
Presentation transcript:

- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple Erection HYUNDAI FEATURES Make to order for each project High Quality Finishing

“High Efficiency Slab System” “Three Main Components Only” “No throwing of Formwork” AluminiumFormwork SLAB “50% Less Labours”

: Install Wall Reinforcement : Erect Wall Panels : Erect Deck Panels : Install Slab Reinforcement 5-8 days Per Floor SYSTEMATIC: 5-8 days Cycle : Pour Concrete Zone Casting Everyday HYUNDAI FORM Day 1Day 2Day 3 Day 4Day 5

AluminiumFormwork Everything cast together - wall - column - beam - staircase - liftcore

AluminiumFormwork Light weight Panel No need tower crane Lightweight panel, easily handle by Workers

AluminiumFormwork Quick & Easy to shift

Hyundai AluminiumFormwork Fast & Easier of installation & dismantle

AluminiumFormwork Short training time

AluminiumFormwork Reuse up to 200 times !

AluminiumFormwork Less wastage & damage Lesser hidden cost

AluminiumFormwork Lesser and cheaper Labour System formwork labour: Rm13.00 / m2 Conventional labour: Rm18.00 / m2

AluminiumFormwork Strip early Wall 10 hours, Slab 2 days Formwork 1 level Props 2 levels

AluminiumFormwork No need do any Plastering Reduces Cost of Architectural Touch up

ALUMINIUM VS Conventional (Conventional slow by 4-5 months) TIME = MONEY !!! 1)Bank interest 2)Operation expenses (tower cranes, labour and others) 3)Worker 4)Rubbish expenses