Control Plans Control Kaizen Facilitation.

Slides:



Advertisements
Similar presentations
Planning Your web content
Advertisements

Testing Relational Database
Standard Work Making the “new way” become the standard way
EMS Checklist (ISO model)
Root Cause Analysis for Effective Incident Investigation Christy Wolter, CIH Principal Consultant Environmental and Occupational Risk Management (EORM.
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
How to Document A Business Management System
ICASAS305A Provide Advice to Clients
The Islamic University of Gaza
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Systems Analysis I Data Flow Diagrams
Compliance Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
ACCIDENT INVESTIGATION
Examine Quality Assurance/Quality Control Documentation
The Quality Improvement Model
Remedy, a BMC Software company Change Management Maximize Speed and Minimize Risk in the Change Process.
Process Mapping.
SystematicSystematic process that translates quality policy into measurable objectives and requirements, and lays down a sequence of steps for realizing.
Network security policy: best practices
OH&S Management System
Fundamentals of ISO.
Training. Why Train? skills and knowledge needed by new staff update skills of old staff assure conformity to standards teach the proper use of SQA procedures.
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Today’s Lecture application controls audit methodology.
Even More SQA: CAPA Corrective and Preventive Actions.
Reaching Goals: Plans and Controls
Control and Accounting Information Systems
System Testing There are several steps in testing the system: –Function testing –Performance testing –Acceptance testing –Installation testing.
S/W Project Management
9 Closing the Project Teaching Strategies
EAGLE INSIGHT “EXPERIENCE SPEAKS OF LESSONS LEARNED”
Segregation of Duties– Sponsored Programs APM
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Reaching Goals: Plans and Controls Today’s smart supervisor.
Quality Directions Australia Improving clinical risk management systems: Root Cause Analysis.
Business Analysis and Essential Competencies
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
Internal Control in a Financial Statement Audit
Chapter 3 資訊安全管理系統. 4.1 General Requirements Develop, implement, maintain and continually improve a documented ISMS Process based on PDCA.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Testing -- Part II. Testing The role of testing is to: w Locate errors that can then be fixed to produce a more reliable product w Design tests that systematically.
Risk Management NDS Forum June 23 rd Example safety objective Objective 1: To protect the health, safety & welfare of employees and people at our.
Project monitoring and Control
Process Walk & SIPOC Define Kaizen Facilitation. Objectives Understand the process as a “system” Describe the concept of an entity and how it relates.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
FACILITATOR Prof. Dr. Mohammad Majid Mahmood Art of Leadership & Motivation HRM – 760 Lecture - 25.
A guide to... Safe Systems of Work.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 6-1 Chapter Six Internal Control in a Financial Statement Audit.
Planning in Organizations Why supervisors and managers plan: Knowing what the organization is trying to accomplish helps them set priorities and make decisions.
Project management Topic 1 Project management principles.
Safe Systems of Work. Legislation w HSWA Section 2 (2) (a): Provide and maintain plant and systems of work that are, so far as is reasonably practicable,
Internal Auditing ISO 9001:2015
Chapter 8 Auditing in an E-commerce Environment
S D BELLAMY - Group Total Quality Manager - 22 August 2000 ( 5TH Revision - Health Version ) PDCA Problem Solving Guide A Guide to a Team Approach to.
Chapter 3 – The Process Approach 1 Process Approach Auditing 28-Oct-2009 VARIATION RISK PERFORMANCE WASTE PROCESS MEASUREMENT AND OBJECTIVE DEPLOYMENT.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
OHSAS Occupational health and safety management system.
Business Continuity Planning 101
Software Project Configuration Management
Reaching Goals and Objectives
Systems Analysis and Design
Fundamentals of ISO.
PDCA Problem Solving Guide
Corrective and Preventive Actions
Systems Analysis and Design
Company X Process Mapping Training
Quality Assurance in Clinical Trials
Presentation transcript:

Control Plans Control Kaizen Facilitation

Objectives Discuss the purpose of Control Planning Present the Control Plan Introduce common pitfalls encountered in Control Plans

Transition Through A-I-C In Analyze, you try to identify the root causes In Improve, you implement changes to fix the root causes In Control, you identify how to ensure those fixes stay in place and how to know if they vary from expected outcomes Control is really about maintaining the gains from the project!

Why Control Plans? Left to themselves processes tend to degenerate and go back to the “old ways” Project Goal “Control”

What Are Some Reasons For This? Accountability “Churn”- people leaving, people moving, business growth, business contraction etc. No documentation / institutional memory/ communication Reward system that favors heroes over planners No systemic methodologies to capture lessons learned, process knowledge, better practices, etc. “Not Invented Here” syndrome Others?

Need For Control Plans Control Plans are about sustainability exist to ensure the process maintains the gains seen from the project provide predictive information, such that adjustments can be made before the output deviates from the plan ensure improvements stay in place All too often this is where the fun ceases, the real work starts, and people start bailing out

Control Plan Elements In preparing a control plan, concentrate on: What needs to be monitored? Who is going to be keeping the process functioning properly? How are they going to monitor? Where will the monitoring be conducted? Where should the plan reside? What will be done if the monitoring detects a condition outside of the Customer’s specifications?

Control Plans and Mapping Different types of process mapping for different purposes: In Define, a simple form of process mapping, typically SIPOC, is used to identify key inputs and outputs In Measure, more complex forms of process mapping are used to better understand the process and identify Inputs In Control, detailed process mapping will be used to record and document the improved process. Deployment flow charts clearly show the sequence of events, handoffs, and the job functions of the people performing the tasks

Deployment Flowchart – Example Call Center Rep New Account Dept Order Fulfillment Accounting Answer Phone Obtain Customer Info Determine Customer Needs Determine Avail/Lead Time Select Expedite or Normal Customer Account? Pre Approval Complete Credit Application Complete New Account Receive Order Prioritize Order Reorder Select Order Pack Notify Accounting Ship Instock Create Bill Invoice Customer Receive Payment Post Actions and responsibilities are clear!

Improvement Hierarchy / Control / Interactions Why a hierarchy? So you don’t have to “fix” this again! Full Automation Most Desired No Manual Intervention Impossible to Fail Eliminate Activity Certification and Audits Notification Fail-Proof The process is changed to be less dependent upon variation caused by people Simplification Training Awareness Behavior typically reverts back Least Desired

Reaction Plan 1/2 Be pragmatic! Actions should be the responsibility of people closest to the process Secure process owner’s approval Document in detail, and identify the person responsible for, reacting to unacceptable variation Incorporate procedures by reference in the control plan Build control plans from the updated Risk Assessments

Reaction Plan 2/2 Some reactions are better than others! PREVENT Root cause identified and permanently corrected CORRECT Root cause is identified and corrected temporarily COMPENSATE Making adjustments – without identifying root cause BETTER Compensating actions are usually less successful. Preventative actions will last longer.

Weekly Dashboards - Example Weekly dashboards were used to report Data Accuracy and report weekly Performance summaries

Process Documentation 1/2 General purpose: Ensure compliance with relevant standards and procedures A means for implementing a company’s objectives and policies General rules: Compliance is easy to check Employees can: Understand them Understand their individual responsibilities Respond to all situations that might arise Are practical and economical

Process Documentation 2/2 Process Map or Flow Chart Consider at what level to map - High, Detailed What type of map will you use? Traditional Process Map, Swim Lane, VSM Procedures / Instructions / Planning Documents Develop a sequence of steps and other instructions Who, What, Where … Be specific, clear, realistic Highlight potential pitfalls to performance Note any common exceptions Note how to obtain or find the document

Tips in Documenting Your Improvements Use your team and / or affected individuals Test the procedure exactly as it is documented Be complete, but concise Do not assume prior knowledge Place the procedure where it is readily available Outline a method for updating procedures for continuous improvement Date your new procedures Remove all obsolete procedures!

Checking Procedures 1/2 Directly By Observation Are people actually doing what the procedure says? Are all the steps being followed? Are people referring to the procedure? By asking those using the procedure “Is each step in the procedure clear?” “Are you having difficulty in following the procedure?” “Could we improve the procedure and still get results?”

Checking Procedures 2/2 Indirectly By Observation When was the last time the instruction was revised? Is the Control Chart being used as a signal for investigation?

Common Pitfalls Not involving affected employees in creating the new procedure Not testing the procedure Omitting information - results needed or how to do a step Lowering the importance of procedures - either by not having them or by management ignoring need Putting procedures on the shelf - not tracking actual use, regular maintenance and configuration control Not destroying all obsolete procedures

Review Discuss the purpose of Control Plans Introduce common pitfalls encountered in Control Plans Don’t expect to control everything Measure what is important to ensure sustainability!