Innovation with Integrity Bruker Energy & Supercon Technologies (BEST) EUCARD2 status by Bruker HTS (together with KIT) CERN-BHTS T-conference 31.08.2015.

Slides:



Advertisements
Similar presentations
Technische Universität München Status report on SADC feature extraction.
Advertisements

Visual 7.1 Course Summary – Putting It All Together Unit 7: Course Summary – Putting It All Together.
ISS meeting UCIrvine 21 August 2006 Alain Blondel 1 Evaluation of « optimal » segmentation for neutrino factory far detectors A. magnetized iron sampling.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Radiograph Examples. Bone Height:
Bruker tape (T053) analysis for Roebel cable A.Kario, B. Ringsdorf, A. Kling, B. Runtsch, A. Jung, R. Nast, W. Goldacker (KIT, ITEP) 1.
Weights and Measures Workshop. Equipment Needed – Sign In Weights & Measures Signs Weights & Measures Signs Tape – Masking, Duct and Athletic Tape – Masking,
Design Review: November 17,2011 Team Members: Allan Davis Carlos Gonzalez Cooper McBride.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
1 Xenon Detector Xenon Detector Group. 2/22 Contents  Construction Status Cryostat PMT mounts  PMT Pisa PMT test PSI PMT test Trouble report  Neutron.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
SPSU Progress on coatings and grooves M.Taborelli -Progress on C based coatings -Progress on rough coatings -Progress on SEY instrument -Grooves.
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
Superconducting Large Bore Sextupole for ILC
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
EuCARD 2012 Collaboration Meeting Warsaw University of Technology 22 th April 2012 WP-7 / Task 4 Very high field magnet Introduction/objectives/partners.
Innovation with Integrity Klaus Schlenga Washington, March 25, 2015 Bruker response to the FCC specifications.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Frankfurt (Germany), 6-9 June 2011 Luciano Martini – IT – RIF S1 – Paper 0339 Development and Testing of Innovative Fault Current Limiters for Distribution.
WP10.2 – where do we stand ? L. Bottura, C. Senatore Graphics by courtesy of A. Kario, KIT.
Faculty Center Review of the new Faculty Center and Functionality in Student Administration Presented by: Michael Busges / Susan Dawson February 2009.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
Status and Highlights of the Pulsed Magnet Program as of summer 2010, mid-point in current award period Delivered 350 th science pulse > 70T in 75T magnets.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
2 Oct 2008PC We have only 1 hour today May need to be brief.
Harold G. Kirk Brookhaven National Laboratory High-Field Solenoids for a MC Final Cooling System AAC 2012 Austin, Texas June 11-15, 2012.
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
BRUKER HTS tape measurement John Himbele, Arnaud Badel, Pascal Tixador 1.
The HCAL barrel absorber structure
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
X-Ray Box Imran Awan Experimental High Energy Physics November 12, 2015.
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
Copyright © 2011 Deloitte Development LLC. All rights reserved. 0Footer Weekly Update: 11/14 Total Negatives (606) Negatives Resolved (127) Minor (65)
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
Procurement for the Supporting Systems
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
HTS Roebel cables for the EuCARD2 “Future Magnets”
Nikolaj Zangenberg, Danish Technological Institute Dec 1st, 2015 HTS tape insulation.
Understand real potential of YBCO CC A Xu, J. Jaroszynski, D. Abraimov, Y. Viouchkov, F. Kametani V. Braccini A. Polyanskii D. Larbalestier Motivation:
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
First results from tests of gaseous detectors assembled from resistive meshes P. Martinengo 1, E. Nappi 2, R. Oliveira 1, V. Peskov 1, F. Pietropaola 3,
EuCARD2 WP10.2 main results and open issues
L. Bottura and C. Senatore on behalf of WP10.2 February 7th, 2017
Status of RACC- Cables: Roebel Assembled Coated Conductor cable
From: Gas-Filled Encapsulated Thermal-Acoustic Transducer
Bruker Energy & Supercon Technologies (BEST)
Updates on the Micromegas + GEM prototype
CERN Conductor and Cable Development for the 11T Dipole
Roebel cables for EuCARD²: experience and options.
Mouth-formed mouth guards. (Left) Without loop strap
Mouth-formed mouth guards. (Left) Without loop strap
the MDP High Field Dipole Demonstrator
EuCARD2 WP 10.2 HTS Conductor
TPC Paul Colas Technical meeting, Lyon.
Additional protection PUR Additional innovative values
A summary of part 1 of Chapter 7 CEP 812 Kay Paff March 24, 1999
Teleconference ACS – FREIA 19th June 2017
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Presentation transcript:

Innovation with Integrity Bruker Energy & Supercon Technologies (BEST) EUCARD2 status by Bruker HTS (together with KIT) CERN-BHTS T-conference

Bruker HTS 2 Outline Critical currents in high fields: new UH Ic-s; BHTS comments Plating of 32-36m tape with KIT meander Dog-boning General status at Bruker HTS Gustaaf Van Tendeloo Alexander Meledin, Uni Antwerpen 2CERN-BHTS Meeting, Alzenau, June 18, 2015

Bruker HTS 3 New HU data (summer 2015): CERN-BHTS T-Conf., Aug 31, 2015 BHTS comments: Great results!! -To check tape length in UH (it should be above 0.1 m) -Alpha value seems to be above 1 (we have 0.88); this may reduce currents above 20T

Bruker HTS EUCARD2: SS+Ag tapes recently punched by KIT Confidential CERN-BHTS Meeting, Alzenau, June 18, 2015 Additional protection of tape after punching is provided

Bruker HTS Additional protection of tape after punching at KIT Confidential CERN-BHTS Meeting, Alzenau, June 18, 2015 Two new defects were introduced to the 36m long tape: one from low-current end (delta x = 1.5 m from the end). Other defect was at distance 21 (?) m. Reason: errors in tape handling (not during plating step!) Suppression of dog boning is implemented. This suppression is found to be dependent on quality of punching.

Bruker HTS 6 Progress in suppression of dog-boning: is important in case of meander-punched tapes Cu thickness: 27µm in the middle 38µm at the edge Not ideal, but much better! 35 µm Confidential CERN-BHTS Meeting, Alzenau, June 18, 2015

Bruker HTS EUCARD2: Highlights at Bruker HTS CERN-BHTS Meeting, Alzenau, June 18, 2015

Innovation with Integrity First 610m long tapes (w=4mm) processed in PLD600 (May-June 2015) 8 8

Bruker HTS 9 Summary BHTS is transferred by 90% to new building. Installation works with equipment are in progress. Installation to be completed in October Fine tuning of process parameters: November 2015 New equipment for 12 mm tape is ordered in the end of August. New PLD300 will be assembled in November 2015; will be put in operation in the beginning of Works on alternative processing sequence is successfully accomplished by KIT and BHTS. Additional protection of tape after punching is developed. 36 (?)m long tape is processed with minor problems (not by plating!) Suppression of dog boning is implemented. This suppression is found to be dependent on quality of punching. Confidential CERN-BHTS Meeting, Alzenau, June 18, 2015

Innovation with Integrity Copyright © 2014 Bruker Corporation. All rights reserved.

Bruker HTS Supporting foils: CERN-BHTS Meeting, Alzenau, June 18, 2015

Bruker HTS 12 Progress in length up-scale CERN-BHTS Meeting, Alzenau, June 18, 2015