Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013
Muon Ionization Cooling Experiment Measure transverse (4D) Muon Ionization Cooling 10% cooling – measure to 1% (10 -3 ) Single-Particle Experiment Build input & output emmittance from ensemble Alan Bross AEM October 14, Tracking Spectrometer RF Cavities Focus Coils Magnetic shield Liquid Hydrogen Absorbers Fiber Tracker
MICE Beam Line Alan Bross AEM October 14, 20133
Schedule Alan Bross AEM October 14, TOF, CKOV, CAL
Schedule II Schedule has been driven by magnet delivery. Step IV need: u 2 Spectrometer Solenoids + 1 AFC Step VI need: u 2 Spectrometer Solenoids + 3 AFC + 2 Coupling Coil Magnet STATUS: u Spectrometer Solenoids s 1 at RAL, ready for installation s 2 nd still at vendor. Expect to ship by December u 2 AFCs delivered s First fully tested, but does not meet full spec. s Second to start testing in November u Coupling Coil s First coil under test at STF s First cryostat nearing completion at LBNL Alan Bross AEM October 14, 20135
Photo gallery Alan Bross AEM October 14, SS leaving vendor SS at RAL AFC CC Test at CHL (STF)
Alan Bross AEM October 14, RF for Step VI
Alan Bross AEM October 14, 20138
RF Power Alan Bross AEM October 14, First RF amplifier installed Tests early next year