 They identify the widget that broke or malfunctioned, then locate the person most closely connected with the technical failure: the engineer who miscalculated.

Slides:



Advertisements
Similar presentations
1 Air Traffic Quality Assurance Program The Federal Aviation Administration Presented By: Gary D. Romero.
Advertisements

Mission Success Starts with Safety The Similarities and Differences of Reliability Engineering and Probabilistic Risk Assessment RAMS VII Workshop November.
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
Software Quality Assurance (SQA). Recap SQA goal, attributes and metrics SQA plan Formal Technical Review (FTR) Statistical SQA – Six Sigma – Identifying.
An Accident Rooted in History NASA Culture History of the flawed joint Events leading up to the disaster.
Comprehend the Challenger accident Comprehend the Columbia accident The Space Shuttle Program: Challenger and Columbia Accidents.
June 1, 2004Computer Security: Art and Science © Matt Bishop Slide #18-1 Chapter 18: Introduction to Assurance Overview Why assurance? Trust and.
1 Basing Aviation Software Certification On Assurance Cases John Knight Patrick Graydon Elisabeth Strunk.
Ch. 14 – Project Audit & Closure
Romaric GUILLERM Hamid DEMMOU LAAS-CNRS Nabil SADOU SUPELEC/IETR.
4. Dynamic reliability models Objectives Be able to find reliability of series, parallel, stand-by and shared load parallel systems, when the reliabilities.
1 Chapter 3 Critical Systems (cont.). 2 Safety Safety is a property of a system that reflects the system’s ability to operate, normally or abnormally,
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
July 18, 2001 Mission Success Begins With Safety Quality Leadership Forum Software Quality Assurance at GSFC Dr. Linda H. Rosenberg Chief Scientist for.
FAILURES AND CAUSES NASA MISSIONS SYSM Advance Requirements Engineering Dr. Chung Muhammad Ayaz Shaikh 05/19/2012.
Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.
November 8, 2011 Improving Public Access to Pollution Prevention, Toxic Chemical Safety, and Greener Products Beginning from Data to Results 11/8/2011.
Outcome 5 Identify safety critical faults on electrical components and systems Worksheet 5 Unit 202: Electrical principles and processes for building services.
ENGINEERING LESSONS LEARNED AND SYSTEMS ENGINEERING APPLICATIONS Paul S. Gill and Danny Garcia, NASA Technical Standards Program Office William W. Vaughan,
Academics, Athletics, Faculty Athletics Committee Hunter Rawlings Panel Discussion.
1 Academy of Aerospace Quality The Vision for NASA’s academic community Brian Hughitt NASA Headquarters Office of Safety and Mission Assurance.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
Planning for Non-Routine Activities
© England Hockey 1 UMPIRE COACHING What’s it all about?
0101 Magneto-optical transducers of information-measuring systems.
Mechanical Integrity Equipment Deficiencies. Lesson Objectives  Describe Actions When Equipment Deficiencies Found in Operating Equipment  Describe.
Critical Decision Method Case Study: B747 Disclaimer: Knowledge, Skills & Ability must known to the SME correct as at 17 Jul 08.
Decision Making Process Program Planning and Control Deana Hackfeld Management Systems Office November 17, 2006.
14–1 Project Closure and Review Deliverables FIGURE 14.1.
Pavan Rajagopal, GeoControl Systems James B. Dabney, UHCL Gary Barber, GeoControl Systems 1Spacecraft FSW Workshop 2015.
Mr. Niall Douglas.  9am-11am: Reading vocab and comprehension check  pm: Statistical analysis  12pm-12.40pm: TOEIC prep  12.40pm-1pm: Explain.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Quality Assurance and Risk Management Services, Inc. 
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
1 JAMSS - Japan Manned Space Systems Corporation Safety and Product Assurance Department Software IV&V team Haruka Nakao ISERN Head.
1 Ventilation Systems Capital Asset Projects Safety Significant Confinement Ventilation System (15-D-411) Exhaust Shaft (15-D-412) Ronald.
Regional Sediment Management Policy and Implementation Workshop April, 2009.
What, Why, When, How, What Can I do? Job Approval Authority State Technical Committee Wednesday, October 30 th, 2013 Dave Beyman, P.E. State Conservation.
Slide #18-1 Introduction to Assurance CS461/ECE422 Fall 2008 Based on slides provided by Matt Bishop for use with Computer Security: Art and Science.
Common Tactics & Behaviors Across Industry That Drive Reliability & Safety: A review of Weick and Sutcliffe’s 5 Elements of High Reliability Stephen E.
Industrial Radiography Equipment Need for a review of the effectiveness of the implementation of ISO 3999? IAEA Technical Meeting Vienna, June 2014.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
CCPS PERD Process Equipment Reliability Database (PERD)
Professor Liam Marnane Head School of Engineering
Project Management 6e..
CHALLENGER DISASTER : CASE STUDY – TO BE
BASIC PROFESSIONAL TRAINING COURSE Module XI Operational limits and conditions Case studies Version 1.0, May 2015 This material was prepared.
PRA: Validation versus Participation in Risk Analysis PRA as a Risk Informed Decision Making Tool Richard T. Banke– SAIC
Overview of IT Auditing
Turning Around Failing Projects
Chapter 18: Introduction to Assurance
D-Link Router Customer Care Number
About Callpcexperts Independent technical support service provider World Class Service Experienced technicians Quick solutions.
NASA Independent Reviews -Lessons Learned-
Regulatory review and assessment
Regulatory review and assessment
Ch. 14 – Project Audit & Closure
Air Traffic Quality Assurance Program
چرخه توسعه نرم‌افزار در ناسا
Tumbler Worksheet 05 Annotate the functions of the cortex connections
Building Trust Involving Patients and Families
Industrial Radiography Equipment Need for a review of the effectiveness of the implementation of ISO 3999? IAEA Technical Meeting Vienna, June 2014.
POSITIVE COACHING SCOTLAND THE VALUE OF CHALLENGE AND STRUGGLE
1 1.What is the Author’s point?
Implementing Region 10 Air Directors Funding Decision
Project Management 6e..
Project Management 6e..
Pier Eringa – CEO ProRail, The Netherlands
The Transport standards
Presentation transcript:

 They identify the widget that broke or malfunctioned, then locate the person most closely connected with the technical failure: the engineer who miscalculated an analysis, the operator who missed signals or pulled the wrong switches, the supervisor who failed to listen, the manager who made bad decision Common mistakes in analysing accidents

 The Technical Engineering Authority should be funded directly from NASA Headquarters, and should have no connection to or responsibility for schedule or program cost. [2003: 193]  NASA ʼ s safety and mission assurance organization was not sufficiently independent; [179]

 NASA does not have a truly independent safety function with the authority to halt the progress of a critical mission element. [180]