Maintenance Management Project Status Report Follow Up Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe.

Slides:



Advertisements
Similar presentations
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Advertisements

Page 2 Agenda Page 3 History –Blue Print, 2000 –GIS Process 1.2, 2001 (training only) –GIS Process 2.0, (ITIL based - not implemented) –Supply/Demand.
Project Management and Communication Represented by: Latifa Jaber Al-Ghafran.
An overview of the CERN CMMS
Thomas Baron CERN Infor EAM User Meeting 26 June 2013.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
MFI Office Maintenance Management Project Presentation 30th of May
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 August 15th, 2012 BP & IA Team.
Role of Management and Technical Coordination
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Continuous Improvement Monitoring (CIM) Collaborative Partner Forum Awareness Session June 2015.
Creating a common understanding on Adverse events information requirements CCC-TI Isabelle Laugier Nov 2 nd 2012.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
Introduction to Software Engineering LECTURE 2 By Umm-e-Laila 1Compiled by: Umm-e-Laila.
CERN IT Department CH-1211 Genève 23 Switzerland t Service Management GLM 15 November 2010 Mats Moller IT-DI-SM.
Marina Signore Head of Service “Audit for Quality Istat Assessing Quality through Auditing and Self-Assessment Signore M., Carbini R., D’Orazio M., Brancato.
The Group Coding Officer Role Goran Perinić. Presentation to the QAC and GCO meeting.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
University of Wisconsin System HRS Project Update to ITC November 19, 2010.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
Georgia Institute of Technology CS 4320 Fall 2003.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
Clinical Application. The Problem Clinical Systems are extremely complex IT configures and deploys best practices (best guesses) about what users want.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
New coding arrangements for Healthcare Science December 3 rd Presented by Nick Armitage, Health and Social Care Information Centre.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Maintenance Management Project Mario Batz EN-CV Pierre Bonnal DG-DI Christophe Delamare GS-ASE Christophe Mugnier TE-EPC Goran Perinić TE-CRG Ingo Ruehl.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
Maintenance Management Project Intermediate Status Report
HySafe Coordination Committee Meeting, October 18, 2005, Karlsruhe Status of WP5- The Hydrogen Incident and Accident Database Update October 2005 Christian.
Maintenance Management Project 3 rd Status Report Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Quality Management in Web-based Learning - A Finnish perspective Kristiina Karjalainen Lappeenranta University of Technology WebCT Executive Seminar EDEN.
State of Georgia Release Management Training
Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS EDMS
Damien Lafarge on behalf of MMP Engineering Department Work Organization, Maintenance Planning and Maintenance Experience session Pierre Bonnal Christophe.
The Claromentis Digital Workplace An Introduction
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
DEX Publication Project OASIS PLCS TC Face to Face meeting 10 March 2008 Trine Hansen.
U.S. Department of Agriculture eGovernment Program Smart Choice Pre-Select Phase Transition September 2002.
Review of the processes released in the framework of the MMP Goran Perinić.
Storage Areas 865, 879, 954 and 955 G. Schneider J. Simon N. Sharmazanashvili G. Schneider BE-BI BI Beamline Operational Spares Strategy 2 (BOSS.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Many entry points to improve reliability! Research, Prototyping, Development QA & Testing Manufacturing & Installation Commiss- ioning Operation Technical.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
Pierre Bonnal DG-DI Christophe Delamare GS-ASE
Quality Assurance applied to Accelerator Safety
The MTF adjusted system to meet Vacuum Group needs
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Using the Checklist for SDMX Data Providers
How to Design and Implement Research Outputs Repositories
Infor EAM in the Handling Engineering Group at CERN
Case management as logbook for the cryogenic installations at CERN
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Maintenance Management Project Status Report Follow Up Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe Mugnier TE-EPC Goran Perinić TE-CRG Regis Pilon TE-EPC Ingo Ruehl EN-HE Eric van Uytvinck EN-EL Zornitsa Zaharieva BE-CO EDMS Maintenance Management Project Status Report 29 th May 2012 Follow up 30 th August 2012

Open issues MMP Status Report MMP Status Report meeting minutes – v.1.0 MMP Status Report meeting minutes – EDMS v.1.0 MMP Concept Report v.1.0 MMP Concept Report - EDMS v.1.0 Implementing MFIO concept and organization Coding / Issue / logbook / TREC / IMPACT / planβ context adds a new dimension (and complexity) to the project Infor EAM develops towards a more user friendly tool Resources ‘almost’ at a sustainable level but some ‘effort’ is still required Equipment criticality and KPIs need some clarification with the DHs

Agenda Introduction I. Rühl Introduction I. Rühl MFI Office concept & status report C. Mugnier MFI Office concept & status report C. Mugnier QA and data management Z. Zaharieva QA and data management Z. Zaharieva Infor EAM light interface S. Mallon-Amerigo Infor EAM light interface S. Mallon-Amerigo Resources summary and outlook I. Rühl Resources summary and outlook I. Rühl AOB G. Perinic AOB G. Perinic Conclusion I. Rühl Conclusion I. Rühl

Maintenance Management Project Status Report Follow Up MFI Office Concept & Status Report Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe Mugnier TE-EPC Goran Perinić TE-CRG Regis Pilon TE-EPC Ingo Ruehl EN-HE Eric van Uytvinck EN-EL Zornitsa Zaharieva BE-CO EDMS Maintenance Management Project Status Report 29 th May 2012 Follow up 30 th August 2012

Steering Board TE Maintenance Framework Implementation TE Maintenance Framework Implementation EN Maintenance Framework Implementation EN Maintenance Framework Implementation BE Maintenance Framework Implementation BE Maintenance Framework Implementation Maintenance Management Quality Assurance Maintenance Management Project C. MugnierD. LafargeM. Gourber-Pace I. Rühl, G. Perinic C. Delamare P. Bonnal, Z. Zaharieva Department Heads BE, EN, TE, GS Task force members Department Heads BE, EN, TE, GS Task force members Other existing CERN services Other existing CERN services The MMP Project 6 Documentation management Spare parts management Analysis & Reporting The analysis of needs and transcription as a specification is performed by 6 working groups: Asset management Work management Planning & scheduling

Steering Board MFI Office (Maintenance Framework Implementation ) TE Maintenance Framework Implementation TE Maintenance Framework Implementation EN Maintenance Framework Implementation EN Maintenance Framework Implementation BE Maintenance Framework Implementation BE Maintenance Framework Implementation Maintenance Management Quality Assurance Maintenance Management Project C. MugnierD. Lafarge M. Gourber-Pace I. Rühl, G. Perinic C. Delamare P. Bonnal, Z. Zaharieva Department Heads BE, EN, TE, GS Task force members Department Heads BE, EN, TE, GS Task force members The MFIO in the MMP project 7 Support and monitoring for: Administrative tasks and Quality Assurance Specific IT tools development Deployment and follow up Communication (between users, MMP team and existing CERN services) C. Mugnier D. Lafarge C.Perolini (TE engineer FSU 100%) J.Ruiz Cabezas (TE fellow 100%) R.Pilon (TE staff 60%) J.Sylvestre (EN fellow 50%) A.Metola (GS fellow 50%) B.Vercoutter (GS staff 50%) T.Klabi (GS staff 50%) Working groups: Asset management Work management Planning & scheduling Documentation management Spare parts management Analysis & Reporting Working groups: Asset management Work management Planning & scheduling Documentation management Spare parts management Analysis & Reporting Other existing CERN services Other existing CERN services

Communication Collects the requests (Ticketing service), summarizes and reports to MMP team Informs and supports users (Hot-line, Web-site, etc.) Implements specific training for maintenance management Communication Collects the requests (Ticketing service), summarizes and reports to MMP team Informs and supports users (Hot-line, Web-site, etc.) Implements specific training for maintenance management Roles Deployment and follow-up support Supports and monitors the implementation of the framework Collects the return of experience and reports to MMP Involves and provides support for the groups and sections - Mobilises the Stakeholders concerned by maintenance at each project step, Deployment and follow-up support Supports and monitors the implementation of the framework Collects the return of experience and reports to MMP Involves and provides support for the groups and sections - Mobilises the Stakeholders concerned by maintenance at each project step, Administrative and quality assurance support Elaborates the BPMN diagrams to formalize processes of maintenance Provides support for writing QA documents, procedures Administrative and quality assurance support Elaborates the BPMN diagrams to formalize processes of maintenance Provides support for writing QA documents, procedures 5 Specific IT tools development Elaborates temporary IT tools & defines needs for user interfaces Collects feedback from users and reports to MMP concerning the IT tools. Specific IT tools development Elaborates temporary IT tools & defines needs for user interfaces Collects feedback from users and reports to MMP concerning the IT tools.

tel : 62185; Service Portal

7 Additional resources, groups involvement Group maintenance management functions GCO Group Coding Officer GMIO Group Maintenance Information Officer GQMO Group Quality Methods Officer GSPO Group Spare Part Officer Group maintenance management functions GCO Group Coding Officer GMIO Group Maintenance Information Officer GQMO Group Quality Methods Officer GSPO Group Spare Part Officer EN department : Coaching: 3 experts (~ 40% FTE each) Data collection and deploym. teams: TBD* EN department : Coaching: 3 experts (~ 40% FTE each) Data collection and deploym. teams: TBD* TE department : Coaching: 6 experts (~ 20% FTE each) Data collection and deployment teams: ~ 4 FTE/Year provided by groups TBD TE department : Coaching: 6 experts (~ 20% FTE each) Data collection and deployment teams: ~ 4 FTE/Year provided by groups TBD BE TBD* BE TBD* C. Mugnier D. LafargeM. Gourber-Pace See § of concept report MMP * An important contribution by the equipment responsibles is required!

Power converter HCRPZBJ.250.ERQFT24 Convertisseur HCRPZBJ001 1.Functional breakdown & equipment codification (Layout & EDMS) 2.Spare Parts (Infor EAM) 3.Documentation (EDMS & MTF) 1.Functional breakdown & equipment codification (Layout & EDMS) 2.Spare Parts (Infor EAM) 3.Documentation (EDMS & MTF) Global steps for implementation 1/2 Systematic steps with newcomers

Global steps for implementation 2/2 4.Workflows (corrective and preventive maintenance, spares parts management, information management…) 5.Analysis & reporting 4.Workflows (corrective and preventive maintenance, spares parts management, information management…) 5.Analysis & reporting

Main MFIO Partner contacts EDMS support EDMS support GS CMMS developments GS CMMS developments Naming Service Naming Service Layout Service Layout Service CCC (Issue Management System) CCC (Issue Management System) GS AIS (Impact) GS AIS (Impact) IT & GS Service Management Support (Service Now), IT & GS Service Management Support (Service Now), Quality Assurance entity at Sector Level Quality Assurance entity at Sector Level Close collaboration is required with many external services in terms of maintenance matters. This comprises the definition of interfaces and deliverables.

MFIO activities during this summer

Pilot Project – BE/BI Equipment concerned Equipment concerned Electronic cards and crates (J. Emery, S. Grishin) Electronic cards and crates (J. Emery, S. Grishin) Actions Actions Refurbishment and clarification of functional breakdown defined in 2007 Refurbishment and clarification of functional breakdown defined in 2007 Update of existing codes and recording of new codes with CMMS service and Naming Service support Update of existing codes and recording of new codes with CMMS service and Naming Service support Recording of assets (tree structure, coding, metadata) Recording of assets (tree structure, coding, metadata) In progress In progress

Pilot Project – EN/HE Equipment concerned Equipment concerned Mobile handling equipment (J.M. Chevalley as GMIO) Mobile handling equipment (J.M. Chevalley as GMIO) Actions Actions Implementation of documentation recording processes Implementation of documentation recording processes Test of IT tools for documentation collection Test of IT tools for documentation collection Refurbishment of files and metadata Refurbishment of files and metadata Progressive recording of all documentation Progressive recording of all documentation Deadline 15/10 start of the batch recording Deadline 15/10 start of the batch recording

Pilot Project – EN/STI Equipment concerned Equipment concerned Collimator electronics (C. Mitifiot) Collimator electronics (C. Mitifiot) Collimator mechanics (R. Bebb) Collimator mechanics (R. Bebb) Actions Actions Recording of assets (tree structure, coding, metadata) Recording of assets (tree structure, coding, metadata) Recording of spare parts (links to assets, coding, metadata) Recording of spare parts (links to assets, coding, metadata) Training for usage of Infor assets and spare parts modules Training for usage of Infor assets and spare parts modules Recording of documentation foreseen Recording of documentation foreseen Intervention management with Infor foreseen Intervention management with Infor foreseen Deadline to be defined Deadline to be defined

Pilot Project – TE/CRG Equipment concerned Equipment concerned All group operational documentation (S. Knoops as GMIO) All group operational documentation (S. Knoops as GMIO) Actions Actions Implementation of documentation recording processes Implementation of documentation recording processes Test of IT tools for documentation collection Test of IT tools for documentation collection Refurbishment of files and metadata Refurbishment of files and metadata Progressive recording of all documentation Progressive recording of all documentation Refurbishment of equipment codes with Naming Service Refurbishment of equipment codes with Naming Service Deadline 15/10 start of the batch recording Deadline 15/10 start of the batch recording

Pilot Project – TE/VSC Equipment concerned Equipment concerned Leaks detectors (A. Sinturel) Leaks detectors (A. Sinturel) Vacuum chambers & Seals (A. Caio) Vacuum chambers & Seals (A. Caio) Sector valves (G. Schneider) Sector valves (G. Schneider) Actions Actions Recording of assets (tree structure, coding, metadata) Recording of assets (tree structure, coding, metadata) Labeling of equipment Labeling of equipment Definition of specific BPMN for traceability of equipment Definition of specific BPMN for traceability of equipment Recording of documentation Recording of documentation GCO (E. Page) nominated by Group Leader GCO (E. Page) nominated by Group Leader Deadline 30/10 presentation to Group Leader Deadline 30/10 presentation to Group Leader

MFIO IT tools IT Tools for batch documentation treatment IT Tools for batch documentation treatment Specific temporary tool for formatting documentation files and metadata (Praxis) Specific temporary tool for formatting documentation files and metadata (Praxis) Integration EDMS + Praxis => batch upload of documentation into EDMS Integration EDMS + Praxis => batch upload of documentation into EDMS Ticketing service launched Ticketing service launched

MFIO processes defined Labelling Labelling BPMN analysis and formalization of process BPMN analysis and formalization of process Formats of stickers, templates and data Formats of stickers, templates and data Options to print labels (central support or group internal) Options to print labels (central support or group internal) Various BPMN analyses and formalization Various BPMN analyses and formalization Coding Coding Documentation recording Documentation recording Planned interventions Planned interventions Traceability of mobile equipment (leak detectors) Traceability of mobile equipment (leak detectors)

Projection MMP/MFIO 1.Identify needs in term of support from external services: Naming and Layout Service Naming and Layout Service EDMS & EAM Support EDMS & EAM Support Quality Assurance entity at Sector Level Quality Assurance entity at Sector Level 2.Specify the Issue Management System with CCC and Crisis Management WG 3.Specify a scheduling tool synchronized with IMPACT 4.Deploy Infor EAM with associated tools 5.Define standard for KPIs (criticality of assets) and associated management rules in line with LHC Reliability WG

Maintenance Management Project Status Report Follow Up Quality Assurance & Data Manangement Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe Mugnier TE-EPC Goran Perinić TE-CRG Regis Pilon TE-EPC Ingo Ruehl EN-HE Eric van Uytvinck EN-EL Zornitsa Zaharieva BE-CO EDMS Maintenance Management Project Status Report 29 th May 2012 Follow up 30 th August 2012

Quality Assurance & Data Management Establishing an effective data management is a prerequisite for the success of the MMP Establishing an effective data management is a prerequisite for the success of the MMP Technology Technology Data itself – structure, metadata, content, quality Data itself – structure, metadata, content, quality Unifying business processes & practices Unifying business processes & practices Integration of data between Infor EAM and IMPACT on-going activity (CMMS and GS-AIS teams) Integration of data between Infor EAM and IMPACT on-going activity (CMMS and GS-AIS teams) Engineering Documentation & Assets Maintenance Management MTF/Infor EAM EDMS / Agile CDD / SmarTeam IMPACT Z. Zaharieva CERN,

CERN, Data Management Domains The Asset Maintenance Management domain is not isolated The Asset Maintenance Management domain is not isolated Documentation & Operational Data Layout & Infrastructure Controls Configuration QA Assets Maintenance Alarms LASER MTF/Infor EAM EDMS / Agile CDD / SmartTeam IMPACT Layout Management Controls Configuration DIAgnostics & MONitoring LogBooks Logging Measurements ABS OASIS Settings Management Postmortem Entities and Signals Naming TIM 26 GEOSIP

Integrated Data Management Environment – Key to Success Consistent naming and vocabulary throughout the data management domains Consistent naming and vocabulary throughout the data management domains Coordination amongst the processes of the different Information systems Coordination amongst the processes of the different Information systems Establish one source of data – avoid data duplication Establish one source of data – avoid data duplication Coherent communication between the Information systems Coherent communication between the Information systems There should be no direct competition between information systems There should be no direct competition between information systems QA CERN, Z. Zaharieva 27

Avoid isolated data Maintenance Management Avoid isolated data Maintenance Management By establishing interfaces between systems By establishing interfaces between systems Improve the data management => improve the efficiency of all business processes Improve the data management => improve the efficiency of all business processes Correlate data across domains to gain insight Correlate data across domains to gain insight Data Information Knowledge Data Information Integrated Data Management Environment QA CERN, Z. Zaharieva 28

29 Z. Zaharieva CERN, MMP Interfaces with Naming DB Established the codification process for equipment types (Group Coding Officer) Established the codification process for equipment types (Group Coding Officer) Being applied in practice by: TE-CRG, TE-VSC, BE-CO Being applied in practice by: TE-CRG, TE-VSC, BE-CO Improve the functionalities of the Naming Portal Improve the functionalities of the Naming Portal To ease the search of equipment codes To ease the search of equipment codes Single source of equipment codes Single source of equipment codes

30 Z. Zaharieva CERN, MMP Interfaces with Layout DB Established the process for the data management integration between the Assets Maintenance and Layout domains Established the process for the data management integration between the Assets Maintenance and Layout domains The CMMS team and the Layout responsible (Pascal Le Roux) have worked on improving the integration between Infor EAM and Layout DB The CMMS team and the Layout responsible (Pascal Le Roux) have worked on improving the integration between Infor EAM and Layout DB

Interfaces with Controls Configuration and Operational Domains MMP interfaces with the Controls Configuration domain - first user BE-CO MMP interfaces with the Controls Configuration domain - first user BE-CO Requests received for MMP interfaces with the Alarms DB (existing functionality for TIM alarms) Requests received for MMP interfaces with the Alarms DB (existing functionality for TIM alarms) To be further investigated: Logbooks and Issue management system To be further investigated: Logbooks and Issue management system Documentation & Operational Data Layout & Infrastructure Controls Configuration QA Assets Maintenance CERN, Z. Zaharieva 31

Maintenance Management Project Status Report Follow Up Infor EAM Light Interface Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe Mugnier TE-EPC Goran Perinić TE-CRG Regis Pilon TE-EPC Ingo Ruehl EN-HE Eric van Uytvinck EN-EL Zornitsa Zaharieva BE-CO EDMS Maintenance Management Project Status Report 29 th May 2012 Follow up 30 th August 2012

Recent system news C. Delamare EAM Light in production since mid August. EAM Light in production since mid August. More details in following slides! More details in following slides! New tool for batch update of requested start dates for Work Orders in production since mid August. New tool for batch update of requested start dates for Work Orders in production since mid August. First step towards EAM–IMPACT integration. Tested by EN/CV. First step towards EAM–IMPACT integration. Tested by EN/CV. Significant data cleaning in order to improve performance Significant data cleaning in order to improve performance More than 1.3M MTF Work Orders deleted. Over 1M custom fields removed. More than 1.3M MTF Work Orders deleted. Over 1M custom fields removed. RCM (Reliability Centered Maintenance) module evaluation licenses available since end June. RCM (Reliability Centered Maintenance) module evaluation licenses available since end June. New improved functionality concerning criticality ranking of equipment. New improved functionality concerning criticality ranking of equipment.

EAM Light C. Delamare EAM Light is a simple web interface that allows Infor EAM users to view, update and create Work Orders. EAM Light is a simple web interface that allows Infor EAM users to view, update and create Work Orders. The interface can be accessed by all devices with a web browser – including smartphones and tablets. The interface can be accessed by all devices with a web browser – including smartphones and tablets. EAM Light will not replace Infor EAM but will provide an alternative to users when working with Work Orders, which is the main use of the system for a lot of maintenance personnel and contractors. EAM Light will not replace Infor EAM but will provide an alternative to users when working with Work Orders, which is the main use of the system for a lot of maintenance personnel and contractors. The application can be used on its own or be called from other applications/reports to update or create new Work Orders. The application can be used on its own or be called from other applications/reports to update or create new Work Orders.

EAM Light C. Delamare EAM Light was put in production on 14 August and several pilot groups are currently using it: TE/CRG, EN/CV & GS/ASE. EAM Light was put in production on 14 August and several pilot groups are currently using it: TE/CRG, EN/CV & GS/ASE. How to access it: For more details about EAM Light, please see the overview presentation in EDMS How to access it: For more details about EAM Light, please see the overview presentation in EDMS A web version of EAM Light customized for smartphones will be released during September. A web version of EAM Light customized for smartphones will be released during September.

EAM Light C. Delamare

The web application is displayed in a “mobile friendly” format if accessed from a mobile device and also adapts to the specific devices (iOS, Android, WP) This is an example of how looks from an IPhone. Under development

Maintenance Management Project Status Report Follow Up Resources Summary and Outlook Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe Mugnier TE-EPC Goran Perinić TE-CRG Regis Pilon TE-EPC Ingo Ruehl EN-HE Eric van Uytvinck EN-EL Zornitsa Zaharieva BE-CO EDMS Maintenance Management Project Status Report 29 th May 2012 Follow up 30 th August 2012

Resources Summary & Outlook – Budget I. Rühl EN MMP budget 2012BC Maintenance document management24,000 BPMN maintenance training (C. Braesch/Univ. H. Savoy)7,300 Technical student A. Rosemann6,500 Equipment for fellows and FSU8,000 MFIO set up (Printer, office supplies etc.)3,000 Consulting 'Maintenance strategy' (A. Stuber)3,000 Consulting maintenance best practice 'Documentation'8,000 Total59,800 For the continuation of the MFIO office (1FSU), the crucial development and implementation of maintenance documents, the possibility to hire technical students and to provide specific trainings and seminars an annual budget of 160 kCHF shared by the EN and TE and BE(!) department will be necessary. TE MMP budget 2012BC Consulting ‘BPMN maintenance application’(BalticBerg)5’000 MFIO set up (Furnitures etc.)3’000 FSU Engineer36’000 Total44,000 GS operation budget 2012BC Maintenance Infor EAM40,000 New licences or modules13,000 Consulting 'Infor EAM' or BO9,000 PJAS33,000 Others8,000 Total103,000 Expected increase in Infor EAM developments may trigger the need of additional budget for licenses, consultancy work etc. in the GS department. GS MMP project budget?!

Resources Summary & Outlook – Manpower I. Rühl Staff GS-ASE Tahar Klabi since November 2011 Staff GS-ASE-EDS LD (SB today) Fellow GS-ASE Ada Alexandre-Metola since January 2012 Fellow EN-HE Joaquim Sylvestre since June 2012 Fellow TE-CRG Javier Ruiz Cabezas since July 2012 Techn. Students (PURESAFE) DG-DI since January 2012 Techn. Student EN-HE Adrian Rosemann since March 2012

Additional Manpower Request I. Rühl TE 4 FTEs (staff operators/technicians/secretaries; FSU) 1 QA Engineer / MFIO (Portuguese Trainee program) EN 1 Maintenance Engineer (Portuguese Trainee program) BE To be defined

Maintenance Management Project Status Report Follow Up AOB Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe Mugnier TE-EPC Goran Perinić TE-CRG Regis Pilon TE-EPC Ingo Ruehl EN-HE Eric van Uytvinck EN-EL Zornitsa Zaharieva BE-CO EDMS Maintenance Management Project Status Report 29 th May 2012 Follow up 30 th August 2012

Bulletin article Article is based on an interview of the MMP team done by Antonella Rosso Article is based on an interview of the MMP team done by Antonella Rosso Thank you for your approvals Thank you for your approvals Article with the requested corrections shall be published in the issue of the Article with the requested corrections shall be published in the issue of the

Maintenance Workshop 2013 First workshop was held at Soleil, Saclay in November 2011 First workshop was held at Soleil, Saclay in November participants from Soleil, Cells, CERN, LMJ, ESRF, MAXLAB, IPNO, CPO, Diamond 45 participants from Soleil, Cells, CERN, LMJ, ESRF, MAXLAB, IPNO, CPO, Diamond 2 x 0.5 days plenary session day visits 2 x 0.5 days plenary session day visits Next workshop proposed at CERN Next workshop proposed at CERN target date October 2013 (with a bit of distance to the open days) target date October 2013 (with a bit of distance to the open days) expected participation from synchrotron and fusion facilities, possibly participants expected participation from synchrotron and fusion facilities, possibly participants length 2 days - 2 x 0.5 days for plenary sessions, 0.5 days for working group sessions complemented by 0.5 days for visits length 2 days - 2 x 0.5 days for plenary sessions, 0.5 days for working group sessions complemented by 0.5 days for visits

Maintenance training Management training - addressed to the maintenance managers, section leaders, etc. Management training - addressed to the maintenance managers, section leaders, etc. Introduction to the main principles of maintenance management Introduction to the main principles of maintenance management Introduction to the CERN maintenance management framework Introduction to the CERN maintenance management framework length 1-2 days, several sessions to be programmed for 2013 length 1-2 days, several sessions to be programmed for 2013 HR has signalled their support for the course management HR has signalled their support for the course management Search of external trainer under way Search of external trainer under way Planning: choice of trainer before end 2012, preparation of course Jan-Mar 2013 Planning: choice of trainer before end 2012, preparation of course Jan-Mar 2013 Technical training Technical training Various methods will be combined – teaching, tutoring, self-learning Various methods will be combined – teaching, tutoring, self-learning Training modules will be developed by the MFIO alongside with the advancement of the development and implementation Training modules will be developed by the MFIO alongside with the advancement of the development and implementation

Maintenance Management Project Status Report Follow Up Conclusion Pierre Bonnal DG-DI Christophe Delamare GS-ASE Marine Gourber-Pace BE-CO Damien Lafarge EN-HE Christophe Mugnier TE-EPC Goran Perinić TE-CRG Regis Pilon TE-EPC Ingo Ruehl EN-HE Eric van Uytvinck EN-EL Zornitsa Zaharieva BE-CO EDMS Maintenance Management Project Status Report 29 th May 2012 Follow up 30 th August 2012

Conclusion 1/2 I. Rühl Need MMP steering board approval for Need MMP steering board approval for MFIO concept and organization and that main actors can continue with their new tasks MFIO concept and organization and that main actors can continue with their new tasks Annual MMP budget by EN, TE and BE increased to 160 kCHF as from 2013 Annual MMP budget by EN, TE and BE increased to 160 kCHF as from 2013 MMP will lead to increased need of Infor EAM licenses, maintenance, etc. – GS MMP project budget?! MMP will lead to increased need of Infor EAM licenses, maintenance, etc. – GS MMP project budget?! Need enhancement by the MMP steering board to Need enhancement by the MMP steering board to Promote MFIO Promote MFIO Promote maintenance specific roles in the equipment groups (GQMO, GMIO, GMCO,GSPO) Promote maintenance specific roles in the equipment groups (GQMO, GMIO, GMCO,GSPO)

Conclusion 2/2 I. Rühl MMP team proposes that the use of smart phones and tablets is harmonized CERN wide as it is done with portable phones MMP team proposes that the use of smart phones and tablets is harmonized CERN wide as it is done with portable phones Moving from rather theoretical work to crucial practical work Moving from rather theoretical work to crucial practical work  active role by GS-ASE  close and active collaboration with external services - naming and layout service; EDMS; IMPACT etc.