Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE WP1 Feasibility Study DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Advertisements

1
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Cognitive Radio Communications and Networks: Principles and Practice By A. M. Wyglinski, M. Nekovee, Y. T. Hou (Elsevier, December 2009) 1 Chapter 12 Cross-Layer.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 3 CPUs.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
ALGEBRA Number Walls
UNITED NATIONS Shipment Details Report – January 2006.
1 Hyades Command Routing Message flow and data translation.
1 Transferring university technology and knowledge … an Sauro Longhi Knowledge Economy Forum (KEF VII) on Technology.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Joint ITU/ECA Regional Workshop on Information and Communication Technologies (ICT) Indicators Gaborone, Botswana October 2004
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
0 - 0.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
3rd Middle East Metal Conference, May 2007, Fairmont Hotel, Dubai, UAE © 2007 MEsteel.com - All Rights Reserved. Mr Hadi Hami 1 IRAN STEEL MARKET.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
Chapter 7 Transmission Media
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 18 April 2013.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 2 Networking Fundamentals.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Presented to: Minnesota Chamber of Commerce October 1, 2012.
1 The new government has to develop a systematic campaign to contact: 1) Regional and communal associations abroad and in Haiti. Communities can participate.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Organization Theory and Health Services Management
Immunobiology: The Immune System in Health & Disease Sixth Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
TAC Line – Infrastructure for services Ivan Maric, Deputy director University computing centre – SRCE University of Zagreb D.A.M.A.C. Congres 6-7 September.
Presentation transcript:

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE WP1 Feasibility Study DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Summary 1- Participants 2- Activities performed 3- Results 4- Possible Future work DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 1-Participants ZADAR County Zadar University Zagreb University REGIONE MARCHE Università di Camerino Università Politecnica delle Marche DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 1-Participants ItalyCroatia a) Transmission Technology P. Pierleoni Z.Sipus, K.Malaric, D.Simunic b) Environmental impact R. De LeoD.Simunic c) Economic estimation G.CancellieriI.Maric d) Lows and Regulations F.Marcantoni, I.Maric, D.Simunic COORDINATORS T.Leo Neven Pintaric A. Cucchiarelli Ivan Maric F.Corradini A.Polzonetti DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 2- Activities performed Zadar Meeting: September 23,2005 Tele-conference Meeting: October 14,2005 Ancona Meeting:December 15, 2005 Rich bilateral exchanges of documents & information DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 3- Results -Deliverables 1, 2, 3 -Technical solutions examined -Technical solution suggested DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 3- Results -Technical solutions examined Broadband radio SDH connection, Satellite connection, Hybrid connection, Virtual Private Network, Optic connection. DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 3- Results -Technical solution suggested Hybrid connection DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Connection Type ProprietaryLeasedVPN SDH + HiperLAN Satellite National Location Main Location Frequency ProprietaryLeased SDH Hiperlan VPN Satellite TAC-LINE Strategic Telecommunication Link

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 3- Results -Technical solution suggested strategic motivations: Proprietary vs Leased DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Croatian principal site (Dugi Otok or Ist) Italy SDH STM-1 ( Mb/s) Radio Link HiperLAN Radio Link Adriatic sea SDH Rx/Tx HiperLAN Tx/Rx System Protocol translation& Mux/DeMux HiperLAN Tx/Rx System Italian sites HiperLAN Tx/Rx System 1st Croatian end-point (University of Zara) 2 nd Croatian end-point (to be defined) SDH Rx/Tx HiperLAN Tx/Rx System HiperLAN Radio Link Croatia (Working channel) (Protection channel) 2nd Italian end-point (to be defined) SDH Rx/Tx Systems HiperLAN Tx/Rx System Protocol translation& Mux/DeMux HiperLAN Tx/Rx System HiperLAN Tx/Rx System HiperLAN Tx/Rx System HiperLAN Radio Link HiperLAN Radio Link 1st Italian end-point (To be defined by Regione Marche) UnivPM GARR Gaterway Monte Conero Regione Marche SDH Rx/Tx Existing links

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 3- Results -Technical solution suggested technical motivations: Frequency band6 7/ [GHz] Lower and ,0 upper frequency 6, [GHz] Table 1 – ETSI recommendations for licensed frequency bands The first band, around 6 GHz is preferable, in order to increase system availability, owing to possible diffraction losses. DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 3- Results -Technical solution suggested Environmental Impact From Deliverable 2 Tables 2a and 2b show basic restrictions for occupational and general population exposure to time varying electric and magnetic fields of wireless communications systems in the frequency spectrum between 10 MHz and 10 GHz, whereas Tables 3a and 3b show reference levels for occupational and general population exposure to time varying electric and magnetic fields in the frequency spectrum between 10 MHz and 10 GHz, as defined in ICNIRP. DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 3- Results -Technical solution suggested Environmental Impact From Deliverable 1 Possible locations which would enable direct line-of-sight from Zadar to Ancona, i.e., Monte Conero. As seen from figure 2, there are three major islands on its path: 1.Dugi Otok 2.Iž 3.Ugljan DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Environmental Impact Figure 2 - Croatian coast. DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Environmental Impact Figure 3 - Satellite view TACLine connection Monte Conero (IT) – Sv.Mihovil (HR) – Unizd (HR) DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 3- Results -Technical solution suggested Economic Aspects: affordability DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 4- Possible Future work To implement the Infrastructure To operate tangible services DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 4- Possible Future work To implement the Infrastructure executive design authorizations provider selection implementation DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE 4- Possible Future work To operate tangible services, for instance Services relative to education, schools and Universities - Services relative to Health care, - Services concerning tourism, - Services improving the access to cultural heritage repositories; - Services relative to trade (Commerce Chambers forum, f.i.) instance) - Services relative to e-Government, in the trade field, supporting citizenship, aimed at the continuous education of Civil Servants, supporting the diffusion of ICT in the local government of Zadar County. DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link WP1Feasibility Study

Tommaso Leo DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE WP1 Feasibility Study Thank you for your attention DIPARTIMENTO DI INGEGNERIA INFORMATICA, GESTIONALE E DELLAUTOMAZIONE Ancona Meeting, February 14, 2006 TAC-LINE Strategic Telecommunication Link