Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Jay Hauser, Fermilab Director’s Review, Apr. 30, CSC Muon Trigger Jay Hauser Director’s Review Fermilab, Apr 30, 2002 Outline The CSC muon trigger.
CSC Muon Trigger September 21, 2004 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Paul Padley.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
CHEP March, B. Scurlock, University of Florida1 D. Acosta, V. Golovtsov, M. Kan, A. Madorsky, B. Scurlock, H. Stoeck, L. Uvarov, S.M. Wang University.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
SR/SP Project Overview Walk through required on-board functionality and validation checks Latency Interface requirements and validation tests Production.
Status of the CSC Track-Finder Darin Acosta University of Florida.
On-line Software Requirements for the Global Trigger, the Global Muon Trigger and the Barrel Muon Trigger Track Finder Claudia-Elisabeth Wulz & HEPHY Vienna.
Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Design Considerations for an Upgraded Track-Finding Processor in the Level-1 Endcap Muon Trigger of CMS for SLHC operations Sep TWEPP09 D. Acosta,
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Implementation and Test of the First- Level Global Muon Trigger of the CMS Experiment Hannes Sakulin 1), 2), Anton Taurok 2) 1) CERN 2) Institute for High.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
SLHC Design Considerations for the CSC Track-Finder & An Asynchronous Trigger Proposal Darin Acosta and Alex Madorsky University of Florida.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
The CMS Modular Track Finder (MTF7) Trigger Board D. Acosta, G. Brown, A. Carnes, M. Carver, D. Curry, G.P. Di Giovanni, I. Furic, A. Kropivnitskaya, A.
CSC Test Beam 2004 Summary Darin Acosta (For the EMU Collaboration)
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
Muon Track-Finder Trigger
CMS EMU TRIGGER ELECTRONICS
CMS SLHC Calorimeter Trigger Upgrade,
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
September CSC Beam Test Report
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
Track Finder Crate, Backplane and Parts
Muon Port Card Latency, October 2015
Sector Processor Status Report
FED Design and EMU-to-DAQ Test
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1 PC From DT Track-Finder 24 Sector Receivers (+12 for ME4) 12 Sector Processors To Global Muon Trigger GMT RPC 44 44 88 The CSC Track-Finder 12 sectors (UCLA)(Florida)(Rice) (Vienna) From DT Track-Finder

Electronics Review, May 2001Darin Acosta2 Sector Receiver Functionality 1. Receive 6  segments via 12 optical links from 2 Muon Port Cards p Require 3 Sector Receivers for one 60° sector 2. Synchronize the data 3. Reformat the data into track segment variables p LCT bit pattern  , ,  b, Apply corrections for alignment 5. Communicate to Sector Processor via custom backplane (Channel Link) 6. Fan out ME1/3  segments to DT Track-Finder } via LUTs

Electronics Review, May 2001Darin Acosta3 Sector Receiver Logic JTAG interface Controller FPGA Front Panel Optical Receiver Optical Fiber from MPC Deserializer Optical Receiver Optical Fiber from MPC Deserializer Front FPGA LUTSLUTS LUTSLUTS Back FPGA To Barrel To Backplane VME Repeat for each Muon

Electronics Review, May 2001Darin Acosta4 Sector Processor Functionality 1. Accumulate track segments for possibly more than one B.X. 2. Extrapolate in 3D from one station to another for all possible track segment combinations 3. Assemble tracks from extrapolation results 4. Select best 3 tracks and cancel ghosts 5. Assign track parameters: p T, , , quality

Electronics Review, May 2001Darin Acosta5 Sector Receiver/Processor DAQ Store all input data ~600 bits/sector/b.x. Store all output data ~60 bits/sector/b.x. To CSC DAQ From trigger primitives

Electronics Review, May 2001Darin Acosta6 CSC TF DAQ Bandwidth è Send input of Sector Receiver (output of Muon Port Card) and output of Sector Processor (input of CSC Muon Sorter) to DAQ stream for diagnostics è Send ~660 bits per L1A per Sector Receiver/Processor è 12 sectors and 100 kHz L1A rate  100 MB/s è One S-LINK64 handles 200 MB/s è Note that trigger data is expected to be sparse, so this bandwidth could be compressed if needed è CSC Track-Finder DAQ acts as additional DDU for CSC system (plan to use existing DDU design)

Electronics Review, May 2001Darin Acosta7 Mirror CSC DAQ Path DAQ MBs send data from front-end  30 DDU SLINK optical fibers Sector Processors send L1 data CSC DDU designed by Ohio State Univ. 18 optical fibers