FED 9U Analog Characterization Stefanos Dris CERN & Imperial College.

Slides:



Advertisements
Similar presentations
Analog-to-Digital Converter (ADC) And
Advertisements

Digital to Analog and Analog to Digital Conversion
Current-Mode Multi-Channel Integrating ADC Electrical Engineering and Computer Science Advisor: Dr. Benjamin J. Blalock Neena Nambiar 16 st April 2009.
VLV T – Workshop 2003 C. A. Nicolau – VLV T - Amsterdam 5-8 October 2003 A 200-MHz FPGA based PMT acquisition electronics for NEMO experiment Read Out.
Microelectronics System Design for Chronic Brain Implants ECEN 5007 S. Johnson, V. Ganesan
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Digital Voice Communication Link EE 413 – TEAM 2 April 21 st, 2005.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
E. Noah, CMS Tracker Week, January 2003 APV Power Dependence on Trigger: First Observations on Hybrid Effect first observed in Strasbourg and reported.
Electric Curcuits and Measurements Basic Electrical components and their functions Measurements of electrical circuits characteristics - Multimeter - Oscilloscope.
Ph. Farthouat CERN ELEC 2002 ADC 1 Analog to Digital Conversion  Introduction  Main characteristics –Resolution –Dynamic range –Bandwidth –Conversion.
Digital to Analog Converters
Lecture 6: Measurements of Inductance, Capacitance, Phase, and Frequency 1.
Pulse Width Modulation (PWM) LED Dimmer Circuit
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Electronic Devices Ninth Edition Floyd Chapter 13.
Calorimeter upgrade meeting – CERN – October 5 th 2010 Analog FE ASIC: first prototype Upgrade of the front end electronics of the LHCb calorimeter E.
Electronics Involves the use of devices and circuits to control the flow of electric current to achieve some purpose. These circuits contain: Resistors,
DATA ACQUISITION Today’s Topics Define DAQ and DAQ systems Signals (digital and analogue types) Transducers Signal Conditioning - Importance of grounding.
ADC & DAC Signal Conversions.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Performance of SPIROC chips in SKIROC mode
CERN DC Spark System Capabilities Anders Korsbäck, BE-RF-LRF University of Helsinki.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
PHY 202 (Blum)1 Analog-to-Digital Converter and Multi-vibrators.
Vertical deflection system: * The function of the deflection system provides an amplified signal of the proper level to derive the vertical deflection.
PHY 202 (Blum)1 Analog-to-Digital Converter and Multi-vibrators.
LECC 2006, Valencia Potential Upgrade of the CMS Tracker Analog Readout Optical Links Using Bandwidth Efficient Digital Modulation Stefanos Dris Imperial.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
25th June, 2003CMS Ecal MGPA first results1 MGPA first results testing begun 29 th May on bare die (packaging still underway) two chips looked at so far.
The Probe: Measurement Accuracy Begins at the Tip  Attenuation –The ratio of the probe’s input signal amplitude to the output signal amplitude..  Bandwidth.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
October, 2001CMS Tracker Electronics1 Module studies at IC OUTLINE laboratory setup description, APV I2C settings pulse shape studies (dependence on ISHA,
January, 2003CMS Ecal1 MGPA Specification Discussion – 9 th Jan. 03 OUTLINE 3 or 4 gain channels discussion technical background - why 3 gains could be.
Analog Capture- Port E. Digital to Analog and Analog to Digital Conversion D/A or DAC and A/D or ADC.
Oscilloscope The main purposes of the oscilloscope are: Can view the input waveform voltage or current. Can measure instantaneous values of the input waveform.
1 SiPM studies: Highlighting current equipment and immediate plans Lee BLM Quasar working group.
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
CMS FED Testing Update M. Noy Imperial College Silicon Group.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
FED V1 Pulse Shape Issues System Meeting, CERN 14 th -16 th October 2003 M. Noy Imperial College London Pulse Shape Issues for the Tracker FED M. Noy Imperial.
Predicting the In-System Performance of the CMS Tracker Analog Readout Optical Links Stefanos Dris CERN & Imperial College, London.
CMS FED Testing Update M. Noy & J. Leaver Imperial College Silicon Group.
Topics 1 Specific topics to be covered are: Discrete-time signals Z-transforms Sampling and reconstruction Aliasing and anti-aliasing filters Sampled-data.
SKIROC ADC measurements and cyclic ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting Orsay June.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
Electronic Piano G H Patel College of Engineering & Technology G H Patel College of Engineering & Technology Prepared by Sanjay Hadiyal ( )
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
Comparison Between AM and FM Reception. 21/06/20162 FM Receiver.
Trigger system for setup 2016 V. Rogov, V. Yurevich,D.Bogoslovski, S.Sergeev, O.Batenkov* LHEP JINR *V. G. Khlopin Radium Institute, St. Petersburg.
PCAR Precision In Practice 1 Precision In Practice Achieving the best results with precision Digital Multimeter measurements Paul Roberts Fluke Precision.
Digitization at Feed Through R&D (2) Digitizer Performance Evaluation Student: John Odeghe ; SC State, Fermi Lab Intern Supervisor: JinYuan Wu; Fermi Lab.
The Working Theory of an RC Coupled Amplifier in Electronics.
TI Information – Selective Disclosure 1 TLK10xxx High Speed SerDes Overview Communications Interface High Performance Analog.
Quiz: Determining a SAR ADC’s Linear Range when using Instrumentation Amplifiers TIPL 4102 TI Precision Labs – ADC Hello, and welcome to the TI Precision.
CTA-LST meeting February 2015
UNIT-IV Application of Special I.C’s.
Analog FE circuitry simulation
KRB proposal (Read Board of Kyiv group)
Chapter 13 Linear-Digital ICs
EMC Lab presentation.
Calibration On pixel calibration capacitor; 20fF
TLK10xxx High Speed SerDes Overview
The CMS Tracking Readout and Front End Driver Testing
The ATLAS LAr. Calibration board K. Jakobs, U. Schaefer, D. Schroff
Presentation transcript:

FED 9U Analog Characterization Stefanos Dris CERN & Imperial College

CMS Tracker Stefanos Dris 20/7/2004 Motivation Analog performance of the FED front end electronics. Match on-FED performance with lab measurements of bare ARx12 modules. Check functionality of ARx12 matching capacitor switch settings- i.e., do the FED’s front end analog electronics affect what capacitance setting should be used on the ARx12s? Motivation Test Setup FED front end electronics Results Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 Test Setup For electrical probing measurements, pulse generator set to trigger automatically and continuously. For pulse reconstruction on the FED, TSC provides synchronous triggers to both the pulse generator and the FED. FED clock skewed (0-31) in order to reconstruct the incoming pulses. Motivation Test Setup FED front end electronics Results Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 Trigger Setup Triggers to FED and pulse generator synchronized. Pulse generator set to output a pulse 2μs after receipt of trigger. FED capture length = 7μs, hence pulse appears approximately in the middle of capture. Motivation Test Setup FED front end electronics Results Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 FED Front End Analog Electronics Probing at: 100Ohm ARx12 output resistor Differential driver output Differential input to ADC Motivation Test Setup FED front end electronics Results Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 AOH Input and Output Input pulses to AOH: 800mV differential 1.25V common mode Motivation Test Setup FED front end electronicsResults Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 ARx12 Output Receiver output is similar to what we see in production testing. Motivation Test Setup FED front end electronicsResults Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 ARx12 Batch R4 Receivers mounted on the FED used for these tests comes from ARx12 batch R4. From lot acceptance testing, and NGK bandwidth data, R4 modules perform A few of the first modules of the batch have much lower bandwidths, but these were used for other purposes (mounted on OFEDs). Settling times for all channels of the 10 production test modules of batch R4 NGK supplied bandwidths for all channels of all 420 modules of batch R4 Motivation Test Setup FED front end electronicsResults Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 Differential Driver Output Settles better at 800fF, as opposed to 1000fF. Overshoot in step response of the differential driver IC? Rise time only slightly worse than ARx12 output pulses. Motivation Test Setup FED front end electronicsResults Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 Differential Driver Output Motivation Test Setup FED front end electronicsResults Linearity test setup Linearity Results Conclusions Settles better at 800fF, as opposed to 1000fF. Overshoot in step response of the differential driver IC? Rise time only slightly worse than ARx12 output pulses.

CMS Tracker Stefanos Dris 20/7/2004 TrimDAC Operation Motivation Test Setup FED front end electronicsResults Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 ADC Input Differential input to ADC almost impossible to probe properly. Strange offsets seen between measurements on the same C setting, as well as slight changes in amplitude. Motivation Test Setup FED front end electronicsResults Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 FED Reconstructed Pulses Best capacitance setting is 800fF. Thus, for an ARx12 module showing 1000fF best capacitance setting in the tracker opto lab, the effect of the FED’s front end electronics is to change this best setting to 800fF. Rise time is a lot worse than in previous stages (~2ns more than at ARx12 output). Motivation Test Setup FED front end electronicsResults Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 Linearity Two non-inverting outputs of the pulse generator used. Period set to 500ns, 1% duty cycle. FED set to acquire 280 points, 25ns apart. Pulse Generator controlled by LabView VI, changes each output’s level to obtain required resultant value. Level change and FED acquisition done manually, 31 steps from -0.5V to 0.71V. Measurement took less than a minute. Motivation Test Setup FED front end electronics Results Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 Linearity Linearity better than 1% for an input range of more than 800mV was achieved, despite the dodgy method. With a more precise method, the linearity should be at least as good as the result shown here. Motivation Test Setup FED front end electronics Results Linearity test setup Linearity Results Conclusions

CMS Tracker Stefanos Dris 20/7/2004 Conclusions Best C-setting should be selected taking into account the FED front end analog electronics (up to ADC), not just the optical link components. In this case, the receiver should be set to 800fF, not 1000fF as the production tests would suggest. More FED channels need to be tested in this manner to see if the ‘change’ in best C-setting is a constant effect. That is, should all ARx12s with best C-setting of 1000fF in the production tests be set to 800fF when mounted on FEDs? What is the effect of selecting the wrong capacitance setting on the performance of the Tracker? In the last beam test, we wanted to check this by constructing Landau curves for all different capacitance settings, as well as for different sampling points. Motivation Test Setup FED front end electronics Results Linearity test setup Linearity ResultsConclusions

CMS Tracker Stefanos Dris 20/7/2004 Impossible is Nothing