PIP Wednesday March 21,2012. 3/21/12 Agenda Project Update(s) Pellico - PIP Status Talk(s) 1.Ryan Crawford: Linac Power Distribution - Shutdown 2012 activities.

Slides:



Advertisements
Similar presentations
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Advertisements

PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
PIP Update July Agenda Summary Update – Budget/RLS – Current Activities – Upcoming Activities/ Changes Update Slides High-Power Ferrite TestingDennis.
PIP Update June 26 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
PIP Update Aug 15 th Agenda Summary Update – Current Activities Dennis Barak / Kiyomi Seiya - High-Power Ferrite Testing Ryan Crawford - Linac and.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
PIP Update Aug 22 th Agenda Summary Update – Current Activities Updates/Talks: – Elmie Peoples-Evans - Schedule Reports – Rene Padilla - Booster.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
PIP PMG Project Controls Elmie Evans-Peoples PIP PMG Oct 25, 2012.
PIP Wednesday April 10 th, /4/12 Agenda Project Update(s) Pellico - PIP Status Talk(s) 1.None –(Review Status Report Effort)
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
PIP Update Sept. 18 th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Pat.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
Booster Beam Notching Installation Update PIP Talk Salah Chaurize February 20, 2013.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Status of Radiation Protection Studies for the Linac4 beam dumps Joachim Vollaire DGS/RP.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
RF source, volume and caesiated extraction simulations (e-dump)
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Proton Source Improvement Workshop Cogging W. Pellico Dec 6&
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
Booster L12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
Proton Improvement Plan (PIP) William Pellico Fermilab Annual Science and Technology Review September 5-7, 2012.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Proton Source Task Force William Pellico Mu2e Working Group Meeting (WGM) on Wednesday, Jul 21.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
PIP Update Dec 17 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PIP Update August 12 th Agenda Summary Update Current Activities Update – Ryan Crawford - Booster Anode Power Supplies – Dave Johnson - Laser Notcher.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
PIP Update Sept Agenda Summary Update – Current Activities Updates/Talks: Ken Domann - Schedule Update and Statusing Ryan Crawford - Linac MCC/Transformer,
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Craig Drennan Update on Efforts to Develop New MI Phase Lock Controls PIP Management Meeting March 28, 2012.
Dark Current and Radiation Shielding Studies for the ILC Main Linac
Presentation transcript:

PIP Wednesday March 21,2012

3/21/12 Agenda Project Update(s) Pellico - PIP Status Talk(s) 1.Ryan Crawford: Linac Power Distribution - Shutdown 2012 activities 2. Trevor Butler: Linac Modulator Upgrade - Work in Progress March 28: Craig Drennan – Booster Low Level Upgrades/Booster to MI phase lock

Updates - RFQ/LEBT – RFQ energy issue continues – Additional energy measurements are being planned – Waiting for vendor to analyze alignment data of RFQ rods – Redone measurements of Einzel Lens – will make some changes and re-measure – Re-measuring field flatness of RFQ Budget News – No news yet – PO’s are being looked at/slowed down on second floor Long Shutdown just 6 weeks away! – Lots of PIP related studies underway Work continues on RLS/Tracking of effort – Elmie still completing tables A short Booster kicker has been potted – ready to start on another

Booster Absorber Review Complete Introduction: The current notching scheme in the Booster will not be adequate for the future 15 Hz operation due to high radiation losses. A new notching scheme has been proposed using 3 long kickers located at Long 12 that kick the beam horizontally into a new absorber at Long 13. We were asked to review the design and feasibility of the new notching system and comment on potential improvements. Recommendations – Kickers: Use the bunch by bunch transverse damper diagnostics to map the notching kicker waveform. – Absorber: 1. Consider solutions for additional shielding on the wall side of the absorber that do not include sand bags. A direct comparison of the proposed additional steel vs. a comparable amount of concrete should be examined. At this point we may expect that the prompt radiation is dominated by moderate energy neutrons. To make a more complete containment inside the tunnel, one could fabricate shielding blocks special-made for this location. Vendors which make concrete shaped to specification are available locally. Consideration for 'heavy' concrete vs. the standard mix would be based on MARS simulations. Mokhov has a contact name at Argonne who regularly obtains specially shaped heavy concrete shielding. 2.Consider aisle side alternative designs that include marble.

Talks Talk(s) 1.Ryan Crawford: Linac Power Distribution - Shutdown 2012 activities 2.Trevor Butler: Linac Modulator Upgrade - Work in Progress