Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety of Air Navigation
Overview Reminder - Requirements Focus Group (RFG) Applications & Schedule Breaking (New) Grounds Status of Work Link to Overall ADS-B Standardisation
Reminder Scope, Objective & Key Stakeholders Development of International Industry Standards Package I Ground & Airborne Surveillance Applications Safety, Performance & Interoperability Requirements EUROCAE WG51, RTCA SC-186 EUROCONTROL CASCADE, FAA SBS
Reminder Requirements Determination Process Application Definition Safety Performance Interoperability OSED SPR INTEROP
High-level RFG Planning Dec 06Apr 07Aug 07Dec 07Apr 08Aug 08Dec 08 Apr 09Aug 09 ADS-B-NRA (ED-126, DO-303) Enhanced ATS in Non-Radar Areas TBD: ASPA-S&M Enhanced Sequencing & Merging Operations ADS-B-ADD – Aircraft Derived Data for Ground Tools ADS-B-RAD ATSA-ITP ATSA-VSA ADS-B-RAD: Enhanced ATS in Radar Areas ATSA-ITP: In-trail Procedure in Oceanic Airspace ATSA-VSA: Enhanced Visual Separation on Approach ADS-B-APT ATSA-AIRB ATSA-SURF ATSA-APT: Airport Surface Surveillance ATSA-AIRB: Enhanced TSA During Flight Operations ATSA-SURF: Enhanced TSA on the Airport Surface
Breaking (New) Grounds Approach Safety Assessment Performance Assessment Reconciliation Clear Baseline OSED Closing Open Ends Collision Risk Analysis
Breaking (New) Grounds Consensus Building Common Denominator OSED: Generic but Tangible Performance Allocation All Skills Required Throughout Continuous X-Education Balancing Positions
Application Status ADS-B-NRA & ADS-B-RAD ADS-B-NRA: ED-126 & DO-303 Blueprint for other applications: SPR/INTEROP document template Document development Safety Methodology (OSA) ADS-B-RAD: Three ADS-B/Radar environments defined OSED and hazard analyses already maturing Performance assessment: refinement of ED-126/DO-303
Application Status ATSA-VSA & ATSA-ITP ATSA-ITP: Close link with ICAO established: NAT IMG & SASP Procedures Collision Risk Analysis Setting of Separation Minimum ATSA-VSA: OSED: “basic” & “enhanced” (incl. Flight ID) OSA – fault trees: “comparative assessment” approach OPA - CDTI: comparison to TCAS display performance
Links to Overall ADS-B Standardisation RFG ICAO (OPSP, ASP, SASP, NAT IMG) Procedures: OPLINK successor ? “Flight ID” phraseology Separation Minima EUROCAE WG51 RTCA SC-186 Publication of RFG deliverables RFG (Update of) Joint Standards Schedule under Establishment Industry Baselines for Rule-making AEEC INTEROP drafting (alongside AEEC A735A work)
A Few Words About … ASPA-S&M: RFG Background Task OSED update for early 2008: reflecting FDMS work Further steps to be defined then Link to Eurocontrol/FAA “Action Plan 23”: Some key RFG individuals involved in AP23 as well RFG offers wealth of “hands-on” experience
RFG – 2007/2008 Meetings Week of 09 July 2007 (USA, Baltimore) Week of 15 October 2007 (Europe, Toulouse) Week of 21 January 2008 (USA, location TBC)
Summary RFG work made a major leap forward Critical resources available Firm schedule established … driven by rule-making needs Foundation for future ASAS implementations
Thanks