RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.

Slides:



Advertisements
Similar presentations
Superconducting Spoke Resonator Cavities and Cryomodules
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
Report from WG 3: Cryomodules (design & integration, construction, assembly) V.Parma, CERN, TE-MSC With contributions from O.Capatina, CERN, EN-MME 2nd.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
Stimulating a discussion on cavity performance metrics.
RF Cavity / Coupling Coil Module
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
APS Short Pulse X-ray (SPX) Design Study July 27-29, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
PIP- BOOSTER RF Tuner and Cavity Refurbishment 3/7/12 M. Slabaugh.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
19 July 2006 Vancouver Global Design Effort 1 Cryogenic Systems Review Tom Peterson for the cryogenics global group.
PIP PMG Project Controls Elmie Evans-Peoples PIP PMG Oct 25, 2012.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
October 4-5, Status of ARRA funded AIPs Stochastic Cooling Alex Zaltsman October 4, 2010 Stochastic Cooling cost and schedule.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
WBS 6: Magnetic Shielding B. Filippone and B. Plaster Caltech December 3, 2004.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Accelerator/Technical Documentation and Breakdown Structure Dr. Felix Schlander Lead Engineer 20 April
Jefferson Lab Cryomodule Cost and Optimization. Based Jlab energy upgrade Cryomodule design and produced to increase the energy gain of CEBAF to 12 GeV.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
HTS-2 – FY17 Budget Request Joe Ozelis, Sr. Eng. Physicist PIP-II Budget Retreat 26 April, 2016.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Integration of HWR, SSR1, and Cryo in the PXIE enclosure Curt Baffes PIP-II Collaboration Meeting 09 November 2015.
Project Management – FY17 Budget Request: HWR Cryomodule Z.A. Conway and P.N. Ostroumov HWR Cryomodule FY17 Budget PIP-II Budget Retreat 26 April 2016.
CERN – Zanon discussions
ILC Cryogenics Work Package Status and Plans
Installation of an Instrument on a CERN machine
BDS Cryogenic System RDR Status and EDR Plans
EVLA Front-End CDR – EVLA Front-End Schedule
Integration, Test, and Calibration
ILC Cryogenics -- Technical Design Report Planning
HIE-ISOLDE contribution packages
JLEIC Engineering Status
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel

RHIC 56 MHz Cryomodule Informational Review RHIC Systems Integration: – This an opportunity for C-AD staff to discuss issues regarding the integration of the 56 MHz Cryomodule into the RHIC Ring into RHIC operations – Groups already identified as needing additional information include: RF Integration Testing Operations Controls Machine Protection Operations

RHIC 56 MHz Cryomodule Informational Review01/19/11 Are there issues or questions that can be addressed or initiated now? If offline meetings are required when is a good time for further discussions?

56 MHz Cryomodule- RHIC Installation 4 Cryomodule will be placed in the Sector 3 side of IP4

56 MHz Cryomodule- RHIC Installation Model of Cryomodule Installation at IP4 – in early development

RHIC 56 MHz Cryomodule Informational Review01/19/11 For future Formal Review the following will be required: – Technical overview – concise description of system – Materials Budget - listing items with associated cost – Schedule – timelines and durations referenced in the overall program schedule. – Manpower estimate - showing type of labor required, durations needed and when required in timeline.

RHIC 56 MHz Cryomodule Informational Review01/19/11 MANPOWER (in FTE/12)ANNUAL FY 2011MANPOWER JANFEBMARAPRMAYJUNJULAUGSEPTOTALS 56 MHz Cryomodule Engineering Mechanical Vacuum RF Controls Cryogenics Access Controls EAG Beam Instrumentation Engineering Labor Estimate (FTE/12): Need tracking of manpower by month then integrated in all C-AD work Shown is one possible spreadsheet arrangement – MSProject is another.