RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel
RHIC 56 MHz Cryomodule Informational Review RHIC Systems Integration: – This an opportunity for C-AD staff to discuss issues regarding the integration of the 56 MHz Cryomodule into the RHIC Ring into RHIC operations – Groups already identified as needing additional information include: RF Integration Testing Operations Controls Machine Protection Operations
RHIC 56 MHz Cryomodule Informational Review01/19/11 Are there issues or questions that can be addressed or initiated now? If offline meetings are required when is a good time for further discussions?
56 MHz Cryomodule- RHIC Installation 4 Cryomodule will be placed in the Sector 3 side of IP4
56 MHz Cryomodule- RHIC Installation Model of Cryomodule Installation at IP4 – in early development
RHIC 56 MHz Cryomodule Informational Review01/19/11 For future Formal Review the following will be required: – Technical overview – concise description of system – Materials Budget - listing items with associated cost – Schedule – timelines and durations referenced in the overall program schedule. – Manpower estimate - showing type of labor required, durations needed and when required in timeline.
RHIC 56 MHz Cryomodule Informational Review01/19/11 MANPOWER (in FTE/12)ANNUAL FY 2011MANPOWER JANFEBMARAPRMAYJUNJULAUGSEPTOTALS 56 MHz Cryomodule Engineering Mechanical Vacuum RF Controls Cryogenics Access Controls EAG Beam Instrumentation Engineering Labor Estimate (FTE/12): Need tracking of manpower by month then integrated in all C-AD work Shown is one possible spreadsheet arrangement – MSProject is another.