LARP Collaboration Meeting 26- 28 April 20061 BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
February 19, 2015 Guelph, Ontario. 1. Advisory Committee on University-Industry Grants (ACUIG) 2. Review Process: Things to Focus On 3. Don’t do the Following.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
J. Patrick - Major Challenges/MOPA021 – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
Role of Management and Technical Coordination
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
US CMS Collaboration Meeting: April 7-8, LHC Remote Operations Center Erik Gottschalk Fermilab.
Suzanne Gysin1 Software for the LHC Types of Software Current Prototyping Architecture Ideas Requirements Revisited WBS considerations.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
LHC Accelerator Coordination Meeting: March 28, Remote Operations for CMS Erik Gottschalk.
J. Patrick - Major Challenges/MOPA021 – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
Presentation to OHEP, OFES, OASCR: Nov 7, Remote Operations and Collaborative Technologies for Distributed Science --- HEP & FES --- Erik Gottschalk.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
US CMS/D0/CDF Jet/Met Workshop – Jan. 28, The CMS Physics Analysis Center - PAC Dan Green US CMS Program Manager Jan. 28, 2004.
LAUC Proposal: Feedboxes and System Engineering bnl - fnal - lbnl - slac US LHC Accelerator Research Program Michael Lamm LARP+LAUC DOE Review June 21,
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
In 2011, the Large Hadron Collider (LHC), the World’s most powerful particle accelerator, collected more data than ever from particle collision experiments.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
Board Feedback Results Board Meeting Dallas April 2007 Board Feedback Results Governance Committee Report Presented at Los Angeles July 2007.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
Accelerator Physics Department Meeting July 26, 2006 Jean slaughter1 Status Report APD Meeting July 26, 2007 Jean Slaughter.
Status of Head-on Beam-Beam Compensation BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program A. Valishev, FNAL 09 April 2009 LARP CM12.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
John Womersley LHC Joel Butler, Marcela Carena, Jim Strait, John Womersley No formal meeting of the group yet, but we took the opportunity to sit with.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
LARP meeting – 2 August, Update Meeting II with Pier E. Harms 3 November, 2005.
11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
CD Strategy Session/Briefing on Collaboration Tools: Sept. 12, Collaboration Tools Erik Gottschalk.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
CMS CB, 22 June CMS Centre Status Lucas Taylor CMS Centre Project Manager CMS Collaboration Board CMS Week, June CMS Centre Status 2.New offices.
Console Status Erik Gottschalk. Status Network - installed, upgrade switch to add more “external” ports Wireless network - available, upgrade to improve.
Committee – June 30, News from CERN Erik Gottschalk June 30, 2005.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
Remote Operations Committee – May 12, Subgroups and Scenarios Erik Gottschalk May 12, 2005.
UEC Meeting: May 6, Remote Operations Center Erik Gottschalk.
September 8, 2005M. Lamm HC and Install US Deliverables1 Installation and Commissioning Project Present Participation How we might participate.
CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON CSN1 LNF 17 September 2007 Walter Scandale CERN.
Plans towards CC in the LHC a US – centric perspective
LHC Science Goals & Objectives
Remote Operations Erik Gottschalk Fermilab
Remote Operations For High Energy Physics
Erik Gottschalk for Jean Slaughter
Remote Operations Erik Gottschalk 5 October, 2005
Assessment of Our Status After 183 Days (6 months)
Remote Operations for CMS & LHC Erik Gottschalk Fermilab
Remote Operations at Fermilab
Update Erik Gottschalk.
Remote Operations Erik Gottschalk 7 September, 2005
CLIC-ILC BDS & MDI work.
Operations Model Thursday, October 20, 2005 October 13, 2005 Jean Slaughter.
Presentation transcript:

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Introduction to status and renderings Summary

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC - Background Remote access to CERN has been a topic of discussion at previous LARP meetings Low-key conversations and demonstration of proof of principle Serious discussions began at Fermilab ~1 year ago Utility for both LHC and CMS experiment and ? Committee formed at request of Director Endorsed by current director Requirements document put together and reviewed Control Room visits, refinement of requirements Preparation of WBS and formal presentations at end of CY05

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC What is A Place That provides access to information in a manner that is similar to what is available in control rooms at CERN Where members of the LHC community can participate remotely in CMS and LHC activities A Communications Conduit Between CERN and members of the LHC community located in North America An Outreach tool Visitors will be able to see current LHC activities Visitors will be able to see how future international projects in particle physics can benefit from active participation in projects at remote locations.

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC What is Allow experts located at Fermilab to participate in CMS and LHC commissioning and operations. Hardware and software necessary to participate effectively in CMS and LHC. Facilitate communication and help members of the LHC community in North America contribute their expertise to CMS and LHC. An extension of the CERN Control Centre (CCC). For example, to assist members of US/LARP in training and data analysis. An extension of the CMS Control Room. For example, to provide a call center for US-CMS collaborators to access information about CMS and the LHC accelerator. A unique opportunity to have detector and accelerator experts in close proximity to each other solving problems together.

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Task Force Erik Gottschalk – Chair (FNAL-PPD) Kurt Biery (FNAL-CD) Suzanne Gysin* (FNAL-CD) Elvin Harms* (FNAL-AD) Shuichi Kunori (U. of Maryland) Mike Lamm* (FNAL-TD) Mike Lamont* (CERN-AB) Kaori Maeshima (FNAL-PPD) Patty McBride (FNAL-CD) Elliott McCrory* (FNAL-AD) Andris Skuja (U. of Maryland) Jean Slaughter* (FNAL-AD) Al Thomas (FNAL-CD) also has an advisory committee with members from Universities, FNAL, CERN-PH, CERN-AB, and CERN-TS. * Accelerator Subgroup

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC – LARP needs LARP Accelerator Systems Tasks Commissioning Hardware Beam Instrumentation (deliverables) Schottky Luminosity PLL/BBQ Accelerator Physics Design of future IR’s

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC - LARP/LHC Requirements Four broad categories of Requirements (requirements scale up as scope of activity changes) Overarching (defined as ‘to extend over or throughout’) Confidentiality Space Hardware Commissioning Access to data as U.S. hardware – magnets and instrumentation - is installed and commissioned Link to Field Control rooms in LHC tunnel Beam Commissioning More activity in CCC Software development Sector test First beam Post-LHC commissioning activities Support of LARP deliverables Beam studies LHC upgrades

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC – LARP/LHC needs CCC Model the CCC at CERN speed assimilation prior to stays at CERN ease in remote participation in studies ‘service after the sale’

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC - Scope

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC - Scope

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC - Scope

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC - Budget

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC - Current status Space Identified Layout endorsed by Fermilab Directorate/CMS/AD/CD GPP money ‘reserved’ Conceptual Design Report & review complete Minimal comments Project Execution Plan written and submitted Project Managers Elvin Harms/AD – construction Erik Gottschalk/PPD – consoles Weekly meetings to prepare construction drawings Color selection and other details in progress Approval working its way towards DOE Office, expect same within 10 days Begin work in spring/summer Construction complete by end of FY06

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC – Floor plan

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC – renderings

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC – Floor plan

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC – Isometric view

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC – Consoles

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC – view from Atrium

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC – Wall display

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC – Window display

LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC SummarySummary has benefits for LARP Designed with LARP in mind Intimately tied to CCC design Project design well on its way Time for feedback is now Remarkable pace We expect to have space this fall