CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee July 11, 2007 Meeting.
Advertisements

City of Hubbard Transportation System Plan Update April 25, 2012.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Unit 2 Learning the Basics
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Chapter 7 Negotiating Intersections
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Intersections & Right of Way
Mecca Roundabout Project Mecca, CA September 28, 2011.
Exposition Metro Line Construction Authority Safety Overview March 1, 2007 Exposition Light Rail Transit Project.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Lec 14, Ch.8, pp : Intersection control and warrants (objectives) Know the purpose of traffic control Know what MUTCD is and what’s in it Know what.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Intersections.
Right–of–Way Concepts
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
Drive Right Chapter 7 Negotiating Intersections Unit 4
Metro Gold Line Eastside Extension Four Quadrant Gate Feasibility Study Summary.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
DR O.S ABIOLA DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA. CVE 505 HIGHWAY & TRANSPORTATION ENGINEERING I.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
Roundabouts: A Safer Choice. What is a roundabout? A roundabout is a type of circular intersection with yield control of entering traffic, islands on.
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
Chapter 7 Negotiating Intersections. 7.1 Searching Intersections   Intersections- places where roadways meet or cross   Examples: +, T, X, or a Y.
Intersections.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
C ITY OF R AINER R AILROAD C ROSSING ’ S. Project # 2 Group Matthew DeGeorge Josh Crain Robert Acevedo Chris Penka Jim Harvey Heather Wenstrand.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Lesson Plan For Day Two Power point presentation 30 min Video– AAA- signs, signals, etc. 20 min Quiz- Signs Etc 10 min Correct 10 min H/O- Signs 10 min.
Proposed Additions to MUTCD. Chapter 8E. Busway Grade Crossings Proposed revision submitted to FHWA in June Intended for next edition of MUTCD.
TRAFFIC CONTROL ORDERS DOWNTOWN MIDLAND January 23, 2017
Downtown Valdosta Truck Traffic Mitigation Study
Fordham at Columbia as a Grade-Separated Intersection
Project Management Team Meeting #3
Drive Right Chapter 2 Unit 1
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Downtown Valdosta Truck Traffic Mitigation Study
25th Avenue Grade Separation
25th Avenue Grade Separation
State Aid Standards Development
Harbour Island Force Main Replacement
Fordham at Columbia as a Grade-Separated Intersection
Colorado Avenue University of Colorado, boulder
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

CITY OF RAINIER RAILROAD CROSSINGS 1

Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2

Scope 1. To design safe railroad crossings that maximizes the movement of people and goods. 2. Design safe pedestrian crossing across the railroad tracks. 3. To design effective intersection closures that minimizes the impact on traffic and the community. 3

Background Rainier is located on Columbia River (Oregon) across from Longview, Washington Our project is part of the Rainier Waterfront Urban Renewal Plan Current population is about 1,750 people Freight trains consisting of about 110 railcars pass through downtown Rainier along “A” Street On average, there are 4 trains per week traveling in either direction 4

Project Overview Project consisted of: –Planning the closure of 3 crossings –Redesign of 4 crossings The City of Rainier has no dedicated engineering staff. –Lars Gare, City Administrator ODOT Rail has final design approval –Dave Lanning, Crossing Safety/Compliance 5

Existing Conditions Rainier, Oregon 6 “A” Street 2 nd Street E

1 st Street 6 th Street E 7

Traffic Conditions 8  Peak Volume < 300 vph  Volumes well below capacity  No intersections on A Street meet any signal warrant criteria  No additional studies needed

 7 Crashes in past 11 years  0 Crashes involving rail  Most crashes related to parking or backing  All crashes during daylight hours Crash History 9 TimeIntersection Collision Type CauseSeverityWeatherConditions 11 AM2nd St WParkingNo YieldPDOClearDry 11 AM1st StBackingToo FastInjury "C"CloudyWet 9 AM1st StParkingOtherPDOClearDry 1 PM2nd St EParkingOtherPDOClearDry 12 PM2nd St EBackingNo YieldPDORainWet 4 PM3rd St ETurningOtherPDOClearDry 2 PM3rd St ERear EndToo ClosePDOClearDry

10 Increase in Train size and frequency Separation of Railroad tracks from roadway by curbs Downtown renewal plan Future Conditions

11 ODOT’s One to One Offer to City City of Rainier Responsibilities –Select at-grade crossing to close, ODOT will pay for the closure and upgrade one intersection –Must produce all design & engineering plans –City is financially responsible for 1 of the 4 upgrades ODOT Rail –Maintains final design approval –Will finance and construct 3 crossing closures and 3 crossing upgrades

Future Closures –City decided due to usage and location that it would be beneficial to close the following 2 nd Street East 4 th Street East 5 th Street East Future Gated/Controlled –City decided that it would be necessary to allow the following intersection to remain open however to provide control measures for safety purposes. 2 nd Street West 1 st Street 3 rd Street East 6 th Street East 12 Design Summary

13

Design Constraints Space limitations, including all necessary safety measures while still leaving space for future improvements. Minimizing impact on traffic and businesses (FOSS) Maintaining similar goals as the A Street Streetscape plan. (City of Rainier) 14

Gate Controlled Intersections will be equipped with the following –Model S-40 gate type 51 –FLX-10 Flashing Lamp –Signs –Gate Arm –Rail Crossing Train Detector –Required wiring –Rail Crossing Controller Equipment and installation will be provided by Safetran. (provider recommended by ODOT) 15 Equipment Details

Interconnect/Signal Plan 16

Signing & Striping 17

West 2 nd Street $299,349 Left Turn Pocket Install two at-grade crossing gates Three way stop controlled 18

1 st Street $568,063 Install four at-grade crossing gates Four way stop controlled 19

20 East 2 nd Street $14,551 “Right in – Right out” Access from cross street maintained Minimal signing

21 East 3 rd Street $292,114 Install two at-grade crossing gates Four way stop controlled Eastern-most pedestrian crossing

22 East 4 th Street $14,149 “Right in – Right out” Access from cross street maintained Minimal signing

23 East 5 th Street $22,576 “Right in – Right out” Access from cross street maintained Minimal signing Acquire 200 ft 2 right-of-way on north side

24 East 6 th Street $56,572 Uncontrolled crossing Signing and striping only 150 feet of open track Stranded vehicle detector near FOSS entrance

Cost Estimates Cost by TypeCost by Intersection Signing$36,988West 2 nd Street$299,349 Striping$23,7791 st Street$568,063 Right of Way Acquisition$6,000East 2 nd Street$14,551 Railroad Gates$938,500East 3 rd Street$292,114 Profit/Overhead (15%)$135,790East 4 th Street$14,149 Mobilization (10%)$90,527East 5 th Street$22,576 Temporary Traffic Control (5%) $45,263East 6 th Street$56,572 Contingency (10%)$90,527 Total$1,267,373 Total$1,267,373 25

 Net loss of 81 on-street spaces  Parallel parking is safer  Large off-street parking lots at:  W 2 nd Street  1 st Street  E 3 rd Street  Projected minimal impact on FOSS parking, recommend FOSS evaluate parking situation after implementation Design Impacts: Parking 26 "A" Street Parking Inventory BlockExistingProposed W 2nd - 1st2811 1st - E 2nd2819 E 2nd - 3rd210 E 3rd - 4th2010 E 4th - 5th1511 E 5th - 6th3212 Total14463

Other Design Impacts 27 Cons Truck deliveries - FOSS/downtown commercial Residence along street closures Pedestrian Crossing (most eastern is at the marina) Pros Improved pedestrian safety Improved vehicle-train interactions Increased aesthetic appeal

Construction Recommendations Construct crossings in conjunction with railroad improvements Leave all crossings opened during construction Closure of the three intersections final phase of construction Identify delivery and train schedules to work construction around them Coordinate all plans with local utilities 28

“Lessons Learned” What would we have done differently? Prepare a schedule at the beginning of the project including all key dates Better accountability of group members Keep more detailed record of the design process Better communication between our group and our contact 29