Semi Digital HCAL Data analysis results Robert Kieffer Institut de Physique Nucléaire de Lyon 10/02/2016 1.

Slides:



Advertisements
Similar presentations
LAV trigger primitives Francesco Gonnella Photon-Veto Working Group CERN – 09/12/2014.
Advertisements

D. Elia, INFN BariALICE Offline Week - June Recent results from SPD beam test D. Elia, R. Santoro INFN Bari ALICE Collaboration - SPD Group.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
ATLAS SCT module performance: beam test results José E. García.
Micromegas for a DHCAL LAPP, Annecy Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise Espagilière.
1 News and preparation of the Semi-Digital Hadronic CALorimeter prototype Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
Calibration, simulation and test-beam characterisation of Timepix hybrid-pixel readout assemblies with ultra-thin sensors International Workshop on Future.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
First Results from Cherwell, a CMOS sensor for Particle Physics By James Mylroie-Smith
Tracking within hadronic showers in the SDHCAL Imad Laktineh.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
I.Laktineh IPNL/IN2P3/UCBL. I.Laktineh-IPNL2 Aims Test a mini DHCAL with new generation embedded electronics readout in beam conditions.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
CEA DSM Irfu 20 th october 2008 EuDet Annual Meeting Marie GELIN on behalf of IRFU – Saclay and IPHC - Strasbourg Zero Suppressed Digital Chip sensor for.
An update on Power Pulsing with SDHCAL Kieffer Robert IPN Lyon « CALICE collaboration meeting » May 2011, CERN
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
The DHCAL Data Analysis José Repond CALICE Meeting, Prague, September 10 – 12, 2007.
Vincent Boudry LLR, École polytechnique CALICE Collaboration meeting U. of Manchester 08/09/2008 Pre-results for the CERN PS tests of the eDHCAL.
Studying the efficiency and the space resolution of resistive strips MicroMegas Marco Villa – CERN MAMMA meeting Tuesday, 13 th December 2011 CERN, Geneva.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
C. Combaret 27 jan 2010 SDHCAL Power pulsing tests status in lyon C. Combaret, for the IPNL team.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Muon detection in NA60  Experiment setup and operation principle  Coping with background R.Shahoyan, IST (Lisbon)
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
MicroMegas for DHCAL Status and activities at LAPP Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Status and organization of the H8c area Mirko Berretti 08/07/2015 (with M.Bozzo, N.Minafra, E.Oliveri, X. Pons…)
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
CALICE calorimeters Power Issues Kieffer Robert IPN Lyon « Linear Collider Power Distribution and Pulsing workshop » May 2011, LAL
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
1 Short Status of TB Analyses in SDHCAL Imad Laktineh.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Irradiated 3D sensor testbeam results Alex Krzywda On behalf of CMS 3D collaboration Purdue University March 15, 2012.
Khaled Belkadhi (LLR-Ecole Polytechnique)1 DHCAL Test Beam Results using Full Train Reconstruction Khaled Belkadhi.
An update on Power Pulsing with SDHCAL Kieffer Robert IPN Lyon « CALICE collaboration meeting » May 2011, CERN
HARDROC: Readout Chip for CALICE/EUDET Digital Hadronic calorimeter Nathalie Seguin-Moreau.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Monitoring of cell to cell inhomogeneity and transfer into simulation M. Vander Donckt.
A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIII SuperB General Meeting DCH-I parallel session Elba, 30 May.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Manqi Ruan Status & plans for gaseous semi-digital HCAL in European.
Monitoring of cell to cell inhomogeneity and transfer into simulation
Test Beam Request for the Semi-Digital Hadronic Calorimeter
The European DHCAL status
CEPC 数字强子量能器读出电子学预研进展
A proposal to equip the high eta muon stations with High Rate GRPC
Vertical Slice Test Data
Tests of a MM octant prototype towards a Micromegas TPC Polarimeter
G.Lamanna (CERN) NA62 Collaboration Meeting TDAQ-WG
Analysis and paper on chamber and telescope performance
The Simulation Status of SDHCAL
Han Jifeng BESIII MUON GROUP IHEP, CAS
Test Beam Measurements october – november, 2016
Performance of a Multigap RPC prototype for the LHCb Muon System
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
DESY drift chambers efficiency and track reconstruction
Summer 09 Testbeams SDHCAL prototypes
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
11th Pisa meeting on advanced detectors
Presentation transcript:

Semi Digital HCAL Data analysis results Robert Kieffer Institut de Physique Nucléaire de Lyon 10/02/2016 1

Outline Test beam periods summary. Small chambers studies Large chambers studies Power pulsing Conclusions 10/02/20162

Test beam periods summary 10/02/20163 Beam LineDateAim CERN PS T10July 2008 (7 days)Small chambers Studies CERN PS T9August 2008 (6 days)Mini SDHCAL setup CERN PS T9Nov (5 days)Small chambers Coating tests CERN PS T9June/July 2009 (22 days)Large Chamber + Small chambers High rate CERN SPS H4August 2009 (7 days)Large chamber studies CERN PS T9May 2010 (11 days)Large chamber homogeneity CERN SPS H2June 2010 (7 days)PowerPulsing CERN SPS H4Sept 2010 (10 days)Large chambers tracking More than 1400 kEvts taken using pion beams A lot of complementary cosmic data taken at lab.

Tracking analysis principle Offline reconstruction:  Clustering in chambers  Track fitting in small setup  Alignment (σ±1 cm)  Projection in large chamber.  Check if there is a cluster.  Compute local efficiency Distance: point réel /point attendu (cm) XY alignment ( small setup Vs Large chamber) 10/02/20164 Small Setup (cm) Large chamber

10/02/20165 Small chambers studies using HARDROC1

Time selection on Small chambers data All events (Sig+Noise) Out of time (Noise) Events in time (Signal) Previous spill Actual spill noise 10/02/20166 Trigger (ms) Scintillators coincidence was used to trig the readout

10/02/20167 High voltage scan Resistive coating comparison: Results obtained using tracking

We didn’t see any angle effect on detection efficiency 10/02/20168 Angle scan Results obtained using tracking

10/02/20169 Performance maps in small chambers Efficiency Map (1cm binning) Multiplicity Map (0.33cm binning to see interpad effect) PAD Linked cells causes higher multiplicity Results obtained using tracking

Eudet Telescope Table XY with 4 GRPCs Photogrammetric spots for alignment Tracking with EUDET pixel telescope 10/02/ Beam

Black (Trigger): spatial prediction of hits in GRPC, from EuTel. Red : matched digital hits (EuTel + GRPC) Efficiency: Efficiency: Red/Black Interpad efficiency 10/02/ No efficiency loss on interpads (500 μm) Tracking resolution σ±10μm

Large protype studies using HARDROC 2 10/02/ ASICs = 9216 channels/1m 2 1m 2 Cassette BeamBeam

Beam profile in a Large chamber (1m 2 ) 10/02/ Very low noise contamination. Result obtained using time selection only

Efficiency homgeneity Vs HV scan 3 differents areas HV scan on 3 differents areas. Statguard coated chamber. 10/02/ Top-Right Top-Center Down-Left Results obtained using tracking DIF6 DIF9 DIF10

 HV: 7.5 kV  Threshold: 144 DAC  Position scan area limited by the movable table. 1m 2 GRPC map Efficiency homogeneity studies 10/02/ Results obtained using time selection only

Multiplicity homogeneity studies 10/02/  HV: 7.5 kV  Threshold: 144 DAC  Multiplicity highly related to threshold level but quite homogeneous. Results obtained using time selection only 1m 2 GRPC map

Beam conditions: High Rate Aim: PowerPulsing tests using B field. Beam Beam 32x48 cm 2 GRPC field B field 3T Magnet Power Pulsing Test Beam 10/02/201617

no impactefficiency B field has no impact on efficiency. B field effect on chamber efficiency No Power Pulsing 10/02/ Results obtained using time selection only

B fielda bit multiplicity B field increase a bit the multiplicity. B field effect on chamber multiplicity No Power Pulsing 10/02/ Results obtained using time selection only

Principle of power pulsing Power On Period: 10ms (100 Hz) DutyCycle: 2/10 2 ms Enable Acquisition Trigger for chip readout Injecting on falling edge through a 2pC build in capacitor Scintillator Coincidence « In Spill » Signal & Veto From Acquisition DIF Trigger Power On ASU Busy Trigger Enabling Power Pulsing: consumption goes from 2A to 0.7A 10/02/201620

Timing of power pulsing Trigger taken in the same power-cycle (2ms) Trigger taken in two consecutive power-cycles (10ms) One cycle without trigger (20ms) Two cycles without trigger… Up to 11 power- cycles acquiring during a spill !!! Gaussian fit sigma: ±0.84 ms Power on 2ms 10/02/201621

Efficiency with power pulsing About 4% efficiency loss! 3T B field 10/02/201622

Analysing efficiency loss internal delay (Δt=100 μs)  Can’t change the internal delay (Δt=100 μs) during test beam (DIF’s Firmware). second part  I applied a time selection offline, to keep only event taken during the second part (1 ms) of the 2 ms power-on time. 1 ms Δt 10/02/201623

Analysing efficiency loss Waiting 1ms after power-ON is mandatory to avoid efficiency loss Waiting 1ms after power-ON is mandatory to avoid efficiency loss. Actually Hardroc2 can be ready in 0.1ms - >Studies are still ongoing 3T B field 10/02/201624

Conclusions Efficiency more than 95%. Multiplicity < 1.3Pad/MIP (could be re-defined less using the 3 thresholds) Detection rate: Steady up to 100 Hz/PAD Noise rate: ~0.1 Hz/cm² No angle effect on efficiency Detector still working in a 3 Telsa field Good efficiency/multiplicity homogeneity on large chamber Validity of power pulsing concept proven. 10/02/201625

Thank you for your attention. 10/02/201626