Study on Regulatory Options for Further Market Opening in Rail Passenger Transport Stakeholder Meeting 10 February 2010 Session 2B Great Britain Case Study.

Slides:



Advertisements
Similar presentations
APTA ANNUAL CONFERENCE OCTOBER 1ST 2003 COMPETITIVE CONTRACTING by Antoine HUREL Chairman & President CONNEX North America Conference on railroad industry.
Advertisements

Theoretical Framework REVENUE Stef Proost (KULeuven) Based on work Adpc, CERAS, IWW,TIS and KULeuven.
Private Infrastructure, Public Risk? Mateen Thobani.
Institutional Element and Policy in Destination Management Pertemuan Matakuliah: G1174/Tourism Management and Planning Tahun: 2007.
Railway Industry Association British Railway Industry - Competences
Non-Tariff Barriers in the Trade of Transport Services – Final Report TPT 02/2002T Steering Committee on More Competitive Transportation (including infrastructure)
Railway competitiveness Hinne Groot, Netherlands ministry 25th November 2014 UN ECE SC.2 workshop 25 November 2014.
1 Creating an integrated rail network for London National Rail conference July 2012 Geoff Hobbs, TfL Rail & Underground.
Structure of Project in PPP- (2) John Plumb. Agenda Following on from the Strategy and business case to develop the ideas Structure of PPP arrangements.
The regulatory framework of the Italian railways: an outline of the main aspects Angela Stefania Bergantino (University of Bari) First Conference on Railroad.
Global Environment Chapter #6.
Vertical separation, disputes resolution and competition in railway industry D. Bouf, Y. Crozet & J. Lévêque Transportation Economics Laboratory (LET)
Financing Roads in Great Britain Peter Mackie and Nigel Smith Institute for Transport Studies University of Leeds.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 8 - Contractual Relationships.
Framework for Port Reform
Hugh Chaplain Transport for Greater Manchester / Rail North Thursday 6 th November 2014.
EP Transport Committee Fourth Railway Package - public hearing Brussels, 7 May 2013 Better governance of the railways – a freight perspective Tony Berkeley.
1 PPP projects in the Netherlands Advisory Group on Privatisation september 2000 Budapest, Hungary Daniel Loschacoff PPP Knowledge Centre.
Surety Bonding Basics by Eduardo José Paternoster Vice President – Director St Paul Reinsurance.
Investment, Reprocurement and Franchise Contract Length in the British Railway Industry Toulouse, 7-8 November 2003 Luisa Affuso NERA and London Business.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 2 - Who, What Why?
1Rail Group The Big Question Peter Wilkinson, Director, Rail Franchising.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
ProFina - Project and Private Finance Feb 2002 Whither Private Sector Participation? Private Investment in the Utility Industries – Energy, Transport,
The Great Transport Debate The Rail Network Michael Roberts Chief Executive, ATOC.
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
International Rail Safety Conference Goa 1 October 2007 – 3 October 2007 GB Experience 10 years after privatisation Anson Jack Deputy Chief Executive Director.
Information Seminar on the Framework for Public Private Partnerships in Ireland Alexander Hotel, Dublin 3 rd June 2003.
Public Financing – Private Facilities Freight in the Southeast Charlotte, North Carolina February 10, 2011.
An Introduction to Public Private Partnerships: Why Government needs to work with the private sector Vilnius 22 nd November 2006 Stephen Harris - Head,
World Experience in Railway Restructuring Clell Harral, John Winner, Richard Sharp, Jonathan Klein HWTSK, Inc 15 December 2009.
TRANSPORT Public and private roles in transport Bergen, June 2005 Paul Amos, Transport Adviser World Bank.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT Chris Nash Institute for Transport Studies University of Leeds
BSc Economics and related programmes
National Smartcard Project Work Package 8 – Corporate Structures Report.
TAC and influence on RU’s in NL 21 th of Januari 2015Aldert Gritter.
III Astana Economic Forum. Ensuring Sustainable Economic Growth of Countries in Post-Crisis Period July 1-2, 2010 JSC «Kazakhstan public-private partnership.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Selecting and Designing Concession / PPP Projects Martin Darcy.
:: February 2005 :: :: presentation to :: Global Water PPPs : Meeting the Challenge Richard M. Temple Hogan & Hartson One Angel Court London EC2R 7HJ Tel:
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
Large Industrial Emitters Emissions Trading Natural Resources Canada March 14, 2003.
3rd Forum for Sustainable Mobility and Metropolitan Development
Date Create your footer by changing copy in the Header and Footer section1 Network Rail’s Strategic Agenda Calvin Lloyd.
An introduction to smart investment solutions: the case of PPP Twinning project Public Agency for Rail Transport of Republic Slovenia Daniel Loschacoff.
Maintenance model in RS Benjamin Steinbacher Pušnjak,PL BC Danilo Vek, Head of Maintenance Department March; 2006.
Railway Infrastructure Financing and PPPs November 2015.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
1 Implementing a Private Sector Arrangement Penelope Brook The World Bank.
Track Access Charges in European Union Adriaan Roest Crollius Zoetermeer, 16 September 2015 The responsibility for the contents of this report lies with.
/18-Feb-161 Response of Surface Access Providers – Network Rail Chris Rowley, Principal Strategic Planner (L&SE)
Leading health & safety on Britain’s railway A strategy for working together Presented by.
Definitions and objectives of public private partnerships (PPPs) Annemarie Mille.
Rail Schemes and the PPP Model November Rail Schemes and the PPP Model  Rail Schemes  PPP model  Successful Projects  Lessons Learned  Conclusions.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
How Digital Railway is a key part of the Rail Delivery Group strategy Paul Plummer Chief Executive Rail Delivery Group.
SESSION 2 Tuesday 9.30 – Selection of PPP Projects.
Paul Plummer, Chief Executive, RDG and ATOC. UK rail is a success story but there are challenges. “Safest & fastest growing railway in Europe”
ROLE OF RAILWAYS IN DEVELOPMENT OF INTER-MODAL HUBS
Marek Stavinoha Legal officer DG MOVE A4 European Commission
High Speed Rail Some Development Principles
September, Lev Razovskiy Director, International Affairs
Public Private Partnerships (PPP)
Retirement Plans and Mutual Funds
Long Term Passenger Rolling Stock Strategy for the Rail Industry
Ian Brooks Assistant Director, PricewaterhouseCoopers
Marco Polo – Towards a policy revision
The Role of Private Sector in Capital Budgeting
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
Presentation transcript:

Study on Regulatory Options for Further Market Opening in Rail Passenger Transport Stakeholder Meeting 10 February 2010 Session 2B Great Britain Case Study Presented by Chris Dugdale

Market opening in Great Britain 1.Key features 2.Structure 3.Experience 4.Stakeholder comments 5.Conclusions 6.Discussion session

 Pragmatic rather than theoretical solutions  Parcelling of all domestic services into groups and letting as franchises:  Complete disappearance of the incumbent  Rolling stock is provided by third parties  Government cover any changes in infrastructure charges  Guarantee of train paths throughout the franchise  Open access is permitted if it is not “primarily abstractive ” 1. Key features

1. Key features Regulated open access  Open access can provide new routes and more imaginative services, but  Open access can undermine the finances of franchise holders So:  Open access is permitted provided its purpose is not primarily to abstract revenue from other services and that it provides public benefits (in terms of new journey options, etc.)  The Regulator makes that decision

1. Key features Franchises and open access

Government  Sets strategy  Determines budget  Awards passenger franchises Network Rail (Infrastructure)  Delivers Network  Accountable for reliability  Leads industry planning ORR (Regulator)  Prices rail outputs  Safety regulation Train Operating Companies  Deliver services for customers “publicly specified, privately delivered” Government Network Rail (NR) Passenger Operations Office of Rail Regulation (ORR) Commercial contract Regulatory contract Track Access Agreement 2. Structure

 Ministry lets the franchises, management sometimes regional  Office of Rail Regulation is economic and safety regulator  Regulator also regulates infrastructure manager 2. Structure

 Specification of service levels, certain quality stipulations  Payment to or by franchise holder, franchise holder normally keeps the revenue  Cap and collar system to protect the franchise holder from exogenous influences on revenue  Requirement to join “industry schemes” and keep network benefits 2. Structure Characteristics of the franchises

 Unified ticketing, ticket inter-availability  Requirement for impartial ticket selling  Revenue allocation system  Single train enquiry service  Unified rail card system  Single published timetable but:  Punctuality penalties mean that connections are rarely held 2. Structure Network benefits

 Assets worked more intensively  More passengers  Newer rolling stock but:  More complex legal structures  Many of the benefits expected haven’t been realised (transfer of risk to the private sector, reduction in total cost, ) 3. Experience

3. Experience Passenger volumes (billion passenger km)

3. Experience Government support £M constant prices

 Need to keep the regulatory regime flexible to allow for changing circumstances  Avoid “big bang” changes  Some mixture of franchise, concession and open access desirable  Combination of safety and economic regulator desirable  Network benefits essential – a judgement on what lies within scope for commercial flair and what is part of the basic passenger experience  Allow for the fact that the provision of public services has a political dimension  Leave some spare infrastructure capacity so as to allow freight operators credibility 4. Stakeholders comments

 Successful model for allocating revenue – permits inter- available tickets  Successful tendering process – at least three bidders each time  Standard model accommodates franchises contributing to the Government and supported by the Government  Solution for open access – “permitted where not primarily abstractive ” 5. Conclusions What solutions were found

 No solution for exogenous effects on revenue  Solution for rolling stock provision is not perfect  Total costs are high, but appear to be largely as a result of increased infrastructure spend 5. Conclusions What still needs attention

Questions:  Do you agree with this analysis?  Are there any other issues of equal importance that need to be brought out?  What lessons can one learn from the British experience? 6. Discussion session