1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.

Slides:



Advertisements
Similar presentations
The Single Electricity Market in Ireland
Advertisements

Amendment 3/5 Workshop.
Technical Conference Avoided Cost Modeling January 6, 2015.
Mechanical Engineering Department ME 322 Operation and Management of Power Plants Prof. Osama A El Masry Prof. Osama El Masry Load Curves.
Overview of tariff revision process under Regulatory Commission Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18,
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Prospero LLC December 2, 2004 Connecticut’s Energy Future Financing Sustainable Energy.
Webinar Electric Utility Industry 101 David Schlissel Cathy Kunkel March 4, 2015.
EE 369 POWER SYSTEM ANALYSIS
M ICHIGAN P UBLIC S ERVICE C OMMISSION Cost of Service Ratemaking Michigan Public Service Commission Department of Licensing and Regulatory Affairs.
Economics of Power Generation Lecture 6. “”The art of determining the per unit (i.e., one kWh) cost of production of electrical energy is known as economics.
Small Renewable Net Metering - An Investor Owned Utility Perspective John R. Grimwade Senior Director Strategic Planning & Development Presentation to.
Triennial Plan 2: Legal Framework. About Us  Efficiency Maine is an independent trust – Accounts and administrative responsibilities transferred from.
COMPETITIVE ELECTRICITY MARKETS March 15, PA Customer Choice Legislation  Distribution service remains regulated by PAPUC.  Transmission service.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
20% by 2030 The future of wind energy in New Zealand Eric Pyle, Chief Executive.
Consideration of Public Utilities Regulatory Policies Act (PURPA) Standards A Public Hearing- October 22, 2007.
Energy and the New Reality, Volume 1: Energy Efficiency and the Demand for Energy Services Chapter 2: Energy Basics L. D. Danny Harvey
THE CHALLENGES OF EUROPEAN ENERGY SECURITY Jiří Feist, CEZ Group.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Strategies for the security of electricity supply.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Introduction to Electricity PART 1
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Retail Competition: Managing a Difficult Transition David L. O’Connor Commissioner Massachusetts Division of Energy Resources (DOER) Presentation to National.
MSK Petition for Rule Change on Contracting for Bilateral Contracts For ERC To Pass a Resolution Mandating that the Bilateral Contracts for Power Supply.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Investing in America’s Electric Future Morry Markowitz Group Director, External Affairs New Mexico Utility Shareholders Alliance October 7, 2009.
Demand-Side Management Models & Practices in California Innovating for Sustainable Results: Integrated Approaches for Energy, Climate, and the Environment.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
1 Demand Response A 28 Year History of Demand Response Programs for the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and Forecasting.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
Energy vs. Power?. POWER Power= the rate at which energy is used measured in watts (joules/sec)
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
2015 Fall PR-MR & Marketing Meeting October 16, 2015 Fairo Mitchell Energy Policy Director, Public Utility Division Oklahoma Corporation Commission.
Electricity pricing Tariffs.
Wholesale Electricity Spot Market (WESM)
Extra electricity slides
ERC’s Role in the Regulation of the Power Generation Rates ERC’s Role in the Regulation of the Power Generation Rates S.B.Allam National Economic and Development.
Understanding the Dynamics of Electricity Trade in the Philippines with the Entry of Retail Competition and Open Access.
Overview of Market Reforms and the WESM
Energy Consumption Energy consumption is measured in kilowatt. hours. A kilowatt hour is the amount of energy being consumed per hour. –Energy (kwh) =
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
1 Dr. Ahmed Kaloko Chief Economist Pennsylvania Public Utility Commission Harrisburg, Pennsylvania Transition from Public Service to Competitive Markets.
1 9. BUSINESS STRATEGIES IN ELECTRICITY MARKETS Asko Vuorinen.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
California Power Deregulation in 1996 Provider selection Fossil fuel (gas, oil, coal) Waste products Renewables (wind, hydro, solar, geothermal) Pricing.
Science A Physics – P1 Science A Physics – P1 Topic 1: Electricity Generation - 3 Topic 1: Electricity Generation - 3.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
To sustain a strong regulatory body.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
All our strategies are aligned with our Vision which is to become Asia’s benchmark of excellence in power regulation, and our Mission to promote and protect.
Economic Operation of Power Systems
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Generation Expansion Daniel Kirschen
2nd District, Oriental Mindoro
Vietnam Power Sector Reform And Market Devvelopmentvvvv
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission

2 What is a Power Supply Agreement (PSA)? A PSA is a bilateral agreement between a Generation Company (GenCo) and a Distribution Utility (DU) for the purchase and supply of power.

Why does the ERC need to review and approve PSAs? Section 25, Chapter 2 of the Republic Act No or the Electric Power Industry Reform Act of 2001 (EPIRA) states that: RETAIL RATE. The retail rates charged by distribution utilities for the supply of electricity in their captive market shall be subject to regulation by the ERC based on the principle of full recovery of prudent and reasonable economic costs incurred, or such other principles that will promote efficiency as may be determined by the ERC. 3

GENERATION CHARGE  Biggest component of the retail rate (around 40% to 60%)  Through the generation charge, the DUs recover their generation costs associated with their energy purchases from : APSALM/NPC (under duly approved TSCs) NPC TOU Rate BIPPs (under duly approved PSAs) ERC-approved Contract Rate CWESMSpot Market Rate 4

5 Power Generation Sources Oil-based 10% Hydro 12% Geothermal 15% Coal 34% Renewable 0.1% Natural Gas 29% Based on DOE Power Statistics 2010 Data

RATE STRUCTURE REVIEW 6 Capacity Fee/Capital Recovery Fee Operations & Maintenance Fee Fuel Recovery Fee/Energy Fee Fixed O&M Variable O&M Fixed Cost Variable Cost What does the ERC look into in its PSA review and approval process?

GENERATION RATE STRUCTURE 7 Capacity Fee/Capital Recovery Fee Fixed Cost  Cost for the recovery of capital or investment incurred in putting up the power plant  Fixed for the duration of the project life/plant economic life

GENERATION RATE STRUCTURE 8 Operations & Maintenance Fee Fixed O&M Variable O&M  Costs involved in operating and maintaining a utility plant and in the provision of utility service; and  Operating outlays consist mainly of costs for purchased power, fuel, wages, applicable taxes, maintenance, supplies, and other necessary expenditures.

GENERATION RATE STRUCTURE 9 Fuel Recovery Fee/Energy Fee Variable Cost  Pass-through cost to allow recovery of fuel consumed to generate power  Cost also depends on the plant heat rate

GENERATION RATE APPROVAL 1.Provisional Approval 2.Final Approval 10 Steps:

PROCEDURE FOR THE APPLICATION OF PSA 11 Receipt of LGU Legislative Body of the Application/ Publication of the Application Filing of the Application Commission issues Order & Notice of Public Hearing Earliest Date for the Initial Hearing Last Day for the Issuance of Provisional Authority Earliest Day for the issuance of Provisional Authority (P.A.) Day 1 Day 10 After 30 days from the (a) receipt of a copy of the application by the LGU Legislative Body or (b) publication of the application, whichever comes later Day 34 Day 75 Issuance of Final Authority Within 1 year from the issuance of P.A.

12 Units in Wh Units involved in Measuring Electricity & Basic Terms in Power Generation

Watt (W) - is the basic unit of measure of electric power Watt-hours (Wh) – is the total amount of energy consumed over a period of time 13 Units in Measuring Electricity kilowatt (kW) – is one thousand watts kilowatt hour (kWh) –is one kW of electricity for one hour

14 Units in Measuring Electricity Megawatt (MW) – is one million watts Megawatt (MWh) – is one million watts of electricity for one hour Gigawatt (GW) – is one billion watts Terawatt (TW) – is one trillion watts

Demand - is the amount of electric power required by an appliance or equipment to operate within its rating. Capacity - is the amount of electric power that a generator is capable of delivering to satisfy the demand. Energy – is the amount of electric power used in hours. 15 Basic Terms in Power Generation 100 watts (Demand) multiply by 10 hours equals 1,000 Watt-hours or 1 kWh (Energy)

Peak Load - is the maximum instantaneous load over a designated interval of time. Base Load - is the constant part of the total load on an electrical power supply system. Intermediate Load – is the range from base load to a point between base load and peak. 16 Basic Terms in Power Generation

Capacity Factor - is the ratio between the power plant’s average production compared to its rated capability. Load Factor - is the a measure of the output of a power plant compared to the maximum output it could produce. 17 Basic Terms in Power Generation

Capacity Factor vs. Load Factor Capacity = 10 Passengers Day 1 5 passengers Day 2 9 passengers 18 Hence, = 14 passengers or an average of 7 passengers (14/2 days). In this case, the Capacity Factor would be 0.7 (7/10), while the Load Factor would be (7/9)

Installed Capacity - is the amount of power or output that a generator can produce at any given point of time or instantaneously. Dependable Capacity - is the capacity that can be relied upon to carry system load for a specified time, provide assumed reserve, and/or meet firm power obligations. 19 Basic Terms in Power Generation

is the amount of energy that the fuel must supply to produce a unit of electrical energy and represents the overall efficiency of a power plant. 20 Basic Terms in Power Generation

21 Basic Terms in Power Generation Sual Power Station Baseload Power Plant – is the energy plant devoted to the production of baseload supply to meet electrical demand. Peaking Power Plant – is the energy plant that is generally run during peak demand for electricity.

22 VISION: Asia’s benchmark for excellence in power regulation. MISSION: The Energy Regulatory Commission promotes and protects the long-term consumer interests in terms of quality, reliability, and reasonable pricing of a sustainable supply of electricity.