1 TX SET Mass Transition Project RMS Update March 15, 2006.

Slides:



Advertisements
Similar presentations
Market True-Up Discussion RMS Meeting 03/13/02 Draft Only for Discussion Purposes.
Advertisements

Retail Market Guide Updates.  ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their.
AMS DATA WORKSHOP III TDSP UPDATE September 19,
1.  An inadvertent issue begins upon the discovery of an Inadvertent Gain or Move-In transaction submission. Upon identification of an Inadvertent Gain.
1 Pre-TX Set 1.5 Data Clean Up. 2 Pre-TX SET 1.5 Data Clean-up Process In-Review - currently 12 (Original Quantity = 863) –June RMS, count 207 In-Review.
1 Load Research Sampling (LRS) Project Summary 12/16/2004.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Role of Account Management at ERCOT PRR 672 Collaborative Analysis Presentation to RMS November 8, 2006 DRAFT ONLY.
1 Update to RMS December 8, Texas SET 4.0 Change Controls
Retail Market Subcommittee (RMS) Update Kathy Scott January 3, 2013Technical Advisory Committee 1.
814_20 – Substation ID updates Background and Proposed Action Plan TX SET – 10/25/07.
RMS Update to TAC January 3, Goals Update ► Complete and improve SCR745, Retail Market Outage Evaluation & Resolution, implementation and reporting.
1 MIMO/Stacking (Including Tx SET Version 2.0) Post Implementation Success Report.
1 RMS Update - ERCOT June 10, Supporting Reports Section.
MARS Taskforce COPS Update May 12, Execution MilestonesBaseline DateStatus Technical Architecture Complete 05/15/2009On Schedule Development Complete07/24/2009On.
Market Impact Assessment TF Final Report to RMS June 11, 2008.
Retail Market Subcommittee Update to TAC Kathy Scott February 27,
June 22 and 23,  The information and/or flow processes contained in this Power Point presentation: ◦ Were created to allow interested parties to.
09/15/10 RMS RMS Market Reports – Recommendations Karen Farley Manager, Retail Customer Choice.
Role of Account Management at ERCOT PRR 672 Collaborative Analysis October 2, 2006 DRAFT ONLY.
Rob Connell May 1, 2002 Retail Sub-Committee Update.
1 Supporting materials for RMS Recommendations for improvements from EDIM team (ESI ID Data Integrity Management team)
1 Supporting materials for RMS Provided by Retail Customer Choice (RCC) team.
10/13/10 RMS RMS Market Reports – Recommendations Karen Farley Manager, Retail Customer Choice.
ESI IDs Retired in Error! RMS – August 10, 2005 Discussion.
RMS Update to TAC April 7, RMS Voting Items  RMGRR032- Transaction Timing Matrix Corrections Includes updates to Appendix D to correct examples.
TX SET v2.1 Implementation Plan. Table of Contents A.Shut Down Procedure B.Shut Down Timeline Details C.Conference Calls D.Additional Contingencies.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
1 MVI/MVO Workshop June 3 – 12, 2002 Workshop Results.
Retail Market Subcommittee Update to COPS Kathy Scott March 17,
1 RMS Update on Move-In / Move-Out Task Force November 14, 2002.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
MARS Taskforce RMS Update November 10, Conference Call concerning Settlement Estimates TDSPs held a conference call on October 28, 2010, where we:
1 Linked-Service Address Discussion Thursday - April 8, 2004 (Updated 4/12/04 to include meeting results) Airport Hilton - Austin.
1 Transaction or Issue Clean Up. 2 Customer Protection and 814_08 Issue (Phase 2 – Potentially Late 08s) Background Completed Items Next Steps.
814_20 – Substation ID updates Background and Proposed Action Plan RMS – 11/07/07.
1 Critical Retail Issues RMS Update RMS Meeting Results 2/01 RMS Formed 3/01 RMS Identified “pent-up” issues Tx Set transaction development Service Order.
1 Supporting materials for RMS Provided by Retail Customer Choice (RCC) team.
Distributed Renewable Generation Profile Implementation Plan.
1 TX SET Update to RMS November 12, RMGRR Activity RMGRR065 – Disconnect and Reconnect for Non-Payment Updates and Corrections – –Normal Timeline.
Acquisition Transfer Switch Hold Notifications Critical Care Changes AMS Meter Indicator Same Day Move Outs Same Day Switches Same Day Move In Date Change.
Issue 2007-I071 Modify Cancellation Window to Accept Cancels Closer to SMRD.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
February 19, 2009 ERCOT Follow up on questions from 2/11 discussion on proposed Expedited Switch rulemaking changes…
1 Supporting materials for RMS Follow up from April RMS presentation Expedited Switch/Customer Rescission (Retail Customer Choice Team)
Update to RMS December 18, Project(PR) 010_03 SCR756 Part B – High Level Timeline DRAFT:  Planning Phase: ~ (End of 2013) ◦ Business requirements.
1 TAC Report to the ERCOT Board January 17, 2006.
Update to RMS January 10, Project(PR) 010_03 SCR756 Part B – High Level Timeline DRAFT:  Planning Phase: ~ (End of 2013) ◦ Business requirements.
TX SET Update to RMS Wednesday, May 9, Elimination of the Drop to AREP o RULEMAKING TO AMEND COMMISSION SUBSTANTIVE RULES CONSISTENT WITH §25.43,
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
Retail Market Subcommittee Update to TAC March 4, 2004.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
COMET Working Group Progress Report. Contents of Report Provide COMET Recommendations, with May 6 revisions (Vote) –Competitive Meter Approval Process.
MIMO Stacking Document and the current RMG are inconsistent with current logic and should be updated.
SHARYLAND TRANSITION TASKFORCE (STTF) UPDATE UPDATE TO RMS APRIL 1,
1 Texas Data Transport & MarkeTrak Systems (TDTMS) Update to RMS March 1, 2016 Jim Lee (AEP) – Chair Monica Jones (NRG) – Vice Chair.
1 RMS Task Force on Retail Market Customer Transition Status Report April 23, 2003.
February 25, 2009 ERCOT Follow up on questions from 2/18 meeting on proposed Expedited Switch rulemaking changes…
Mass Transition Lessons Learned. Should the FASD (First Available Switch Date) be revised for Mass Transition Projects? We need a better definition of.
MMWG Performance Measures Questionnaire. Performance Measure Reporting Requirements The reporting requirements allowed the commission to obtain information.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
Mass Transition—Timelines & Volume Limitation RMGRR116—Acquisition Transfer Non-standard Metering Future Meetings 1.
1.  What is the purpose of DEVs? Data Extract Variances (DEVs) are used to synchronize the data among all Market Participants (MP)  What is a DEV? It's.
1 Market Participant Default Joint Taskforce Update and Report on Recent Customer Transition Activity Report to WMS August 17, 2005.
Multiple ESI IDs Linked to a Single Service Address Record Linked-Address Action Items.
1 Supporting materials for RMS Provided by Retail Customer Choice (RCC) team.
1 TX SET Update to RMS March 14, Drop to AREP Changes PUCT Project oOne of TX SET 2007 goal is to evaluate approved Rulemakings and determine.
Settlement Timeline Workshop
Pro-Active Transaction Resolution Measures
CEO Report Thomas F. Schrader ERCOT Board of Directors May 17, 2005
Presentation transcript:

1 TX SET Mass Transition Project RMS Update March 15, 2006

2 Today’s Process for Mass Transition Business Day 0  ERCOT verifies the list of affected ESI IDs with Defaulting CR, along with if possible obtaining current customer information for each ESI ID affected to be communicated to the gaining CR (POLR) via Spreadsheet  ERCOT announces to affected Market Participants (POLRs and TDSPs) that a Mass Transition is underway.  ERCOT sends list of ESI IDs to affected TDSPs to verify and/or confirm REP of Record in TDSPs system for each ESI ID.

3 Today’s Process Business Day 1  TDSPs Verification of List (ESI ID Synch with ERCOT) is completed and results is communicated to ERCOT via spreadsheet  ERCOT provides POLR(s) with list of ESI IDs affected via a spreadsheet where POLRs are expected to provide Switch (814_01) transaction to become REP of Record due to CR Default – Mass Transition Project.

4 Today’s Process Business Day 2 – 6  POLR CRs create Switch Request with the First Available Switch Date (Switches must be submitted within 5 Business days of receipt of the ESI ID List, unless the gaining CR is a POLR and the ESI ID has a peak demand of one (1) Megawatt, then the Earliest Switch Date will not exceed 11 days for the submittal request to ERCOT. In this event First Available Switch Date will depend upon premise type as stated above. Also entry of the transaction will affect transition completion, which may depend upon volume of Switch transactions involved in the transition due to manual processes.

5 Today’s Process Business Day 3 – 11  ERCOT Receives Switch Request from POLRs involved to forward to TDSP, 814_03 transaction includes Requested Switch Date.  TDSP responds to each Switch transaction providing Scheduled Meter Reading Date (814_04) for each ESI ID along with 867_02 Historical Usage transactions, if usage is requested by the gaining POLR. Completion of any of these activities depends upon volume of Switch transactions involved in the transition due to manual processes.

6 Today’s Process Business Day 5 – 13  Affected TDSP(s) complete process to obtain meter readings for all ESI IDs received from ERCOT for the Mass Transition. After Business Day 8 or >18  Transactions received by ERCOT completing the transitioning of the ESI ID (TX SET Transactions Initial 867_04 and Final 867_03 Reading/Usage) Completion of any of these activities depends upon volume of Switch transactions involved in the transition due to manual processes.

7 Today’s Process Transactional Issues  The issuing of Move-Ins transactions instead of Switches Issue: Move-Ins are received prior to POLR Switches and in the order of work to be performed the Move-In could be completed a day or two earlier. Later during that same week the POLR Switch may be scheduled and/or completed transferring the customer to POLR. This is very confusing for all entities involved and potentially a negative impact to the Retail Customer. Issue: Some of these Move-In (MVI) transactions received by the TDSP are within certain city jurisdictions that require tenant permits for all Move-Ins delaying the transitioning of those ESI IDs from the Defaulting CR.  Defaulting CR issuing Drop to AREP transactions instead of operating within the confines of the market approved POLR process for Mass Transitions. Issue: These transactions must be cancelled before the appropriate POLR Switch transaction can be created at times adding days to the transition.  Switch Request received by ERCOT without the appropriate rescission indicator being flagged resulting in ERCOT rejecting the Switch request. Issue: This may add some additional time to recreate the transaction with the rescission flag, especially if there are a large volume of ESI IDs to be re- entered along with the manual entry process needed to complete this task by the gaining POLR.

8 The ‘Future’ Mass Transition Process TX SET Concept Assumptions  For All ESI IDs involved in the Mass Transition Project: Customer Rescission would be waived because of the type of event that initiated the transitioning of ESI IDs involved. Automation would be flexible enough where transactions could be generated by ERCOT for transmission to the affected TDSPs and the appropriate POLR and/or Designated CR. Historical Usage would be provided by the TDSPs via the 867_02 Historical Usage transaction to the POLR or Designated CR for all Mass Transition Drop transactions generated by ERCOT. Specific Customer Information would be provided within the Mass Transition Drop transaction generated by ERCOT to automate the loading of needed premise/customer information into the POLR or Designated CR’s system removing manual processes that could delay the process, potentially impacting the Customer by delaying CHOICE. TDSPs would be permitted to estimate meter readings for this type of event to allow automation based upon the Mass Transition flag in the transaction and to prevent delays in completing the transition, especially during high volumes of transactions.

9 Future (Long Term) Process Business Day 0  ERCOT Announces to affected Market Participants (POLR and/or Designated CR and TDSPs) that a Mass Transition is underway.  ERCOT sends list of ESI IDs to affected TDSPs to verify and/or confirm REP of Record in TDSPs system for each ESI ID.

10 Future (Long Term) Process Business Day 1  TDSPs Verification of List (ESI ID Synch with ERCOT) is completed and results is communicated back to ERCOT via spreadsheet  ERCOT provides POLR(s) or Designated CR with list of ESI IDs affected via spreadsheet ONLY for Information to prepare for receipt of transactions from ERCOT.

11 Future (Long Term) Process Business Day 1  ERCOT generates Mass Transition Drop transaction to the affected TDSPs: Each transaction involved would have a special flag identifying it as apart of the Mass Transition Project. Customer information would be included in each transaction, when and if available. With the elimination of the manual entry created by today’s Drop to POLR process for a Mass Transition this should remove several days or as much as a week from the Mass Transition Project completion.

12 Future (Long Term) Process Business Day 3  TDSPs respond to each Switch transaction providing Scheduled Meter Reading Date for each ESI ID. Business Day 4  ERCOT would provide POLRs and/or Designated CRs with: Mass Transition DROP transaction (814_14) Customer Information, if and when available, would be contained in the 814_14 transaction Historical Usage transaction (867_02)

13 Future (Long Term) Process Business Day 5 – 6  Affected TDSP(s) would complete the process to obtain meter readings for all ESI IDs received from ERCOT for the Mass Transition. Based upon volume and along with the Mass Transition flag identified in the transaction, the TDSPs may obtain meter readings by one or a combination of the following methods: Actual Field Readings Estimate Readings Actual Meter Reading via AMR or IDR equipment already installed at the premise After Business Day 6 or < 10  Transactions received by ERCOT completing the transitioning of the ESI ID ( TX SET Transactions Initial 867_04 and Final 867_03 Reading/Usage)

14 Resolving Today’s Issues (Long Term) The number of days for the transition project to complete is too long.  Resolution: TX SET’s priority in this project is to reduce the number of days to transition/transfer all ESI IDs from the Defaulting CR to complete the Mass Transition Project and with this concept it is possible for transitioning to complete in 10 days or less. Move-Ins received during the transition from CRs.  Resolution: With ERCOT generating Mass Transition Drops within (1) day of the Mass Transition announcement the opportunity for competing transactions have been minimized due to the window of time permissible for these transactions to process has been greatly reduced. Defaulting CR issuing Drop to AREP transactions instead of operating within the confines of the market approved POLR process.  Resolution: ERCOT will be generating the Mass Transition Drop transactions to reduce market impacts created by incorrect transaction entry, timing or processing delays. Also, this new process would resolve the issue where Defaulting CR can no longer create transactions, system inabilities or limitations, or has left the Market without communicating to the appropriate parties of their intent to no longer serve their Customers. CRs sending Switch Request without the appropriate rescission indicator being flagged causing ERCOT to reject the Switch request.  Resolution: As part of the process and requirement for all ESI IDs involved Customer rescission would be waived at the time when ERCOT announces the Mass Transition event is underway, just prior to generating the Mass Transition Drop transactions.

15 Question and Answer