FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

» When you have completed this module you will know, what components do, what they physically look like and how they are represented in a circuit diagram.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
1 Module and stave interconnect Rev. sept. 29/08.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
ROSIER Ph End cap – TPC - LC DRAFT Definition of the front-end electronics and its cooling in the Alice TPC experiment Page 1A The Alice TPC.
1 Module and stave interconnect Rev. sept. 29/08.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Outer Tracker meeting NIKEF 27 July Dirk Wiedner Status of the OT readout electronics in Heidelberg Dirk Wiedner, Physikalisches Institut der Universität.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
FE Electronics - Overview ASD TDC L0 Buffer L1 Buffer biasL0 BXL1 50 fC DAQ counting room ~100m FE Electronics on the detector GOL Electronics Service.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
Shore Station1 EFNI H K Shore Station Block diagram Form factor Power setup Special for BARI Special for MILOM Planning Outcome of brainstorm.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
M. Sannino for S. Cuneo - I.N.F.N. Genova1 Rich2 MAPMT Housing & Cooling Outdated designs and what is needed to get a final executive design Imperial College.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Distributed Low Voltage Power Supply System for Front End Electronics of the TRT Detector in ATLAS Experiment E.Banaś a, P.Farthouat b, Z.Hajduk a, B.Kisielewski.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
3/02/2004 ab,az,ts Proto Front End Thermal Test Results 1 EFNI H K PACKAGED FRONT END COOLING TEST The Front Ends of the Outer Tracker are closely packed,
LHCb Outer Tracker Upgrade Actel FPGA based Architecture 117 januari 2013 Outline ◦ Front end box Architecture ◦ Actel TDC ◦ Data GBT interface ◦ Data.
27/01/2004 az Proto Outer Tracker Front-End Tests 1 EFNI H K Test results of the Prototype Outer Tracker Front-End Box Ad Berkien Tom Sluijk Albert Zwart.
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
Profiler Mechanics Update
Cosmic Microwave Technology, Inc.
LHCb Outer Tracker Electronics 40MHz Upgrade
Quality Control Chamber Production
Christian Veelken last updated 11/09/06
cooling and supports of the forward endcap EMC
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Mini-drawers, FE-ASIC , Integrator
Studies on detector and commissioning CALICE Technical meeting
First of all we will remind some numbers:
Front-end electronic system for large area photomultipliers readout
Outer Endcap External Bus tape
SVT detector electronics
SALTRO16 activities in Lund
Presentation transcript:

FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling

End-piece Feed trough boards at dummy

End-piece construction The OT module exists out of two identical panels holding 64 straws. 2 Feed trough boards connecting HV and gnd over full width to outside world

Electronic components Overview of boards Full or half module Stacking of boards HV and connector section

Electronic components Feed-trough board 2x HV-board 4x ASD-board 8x OTIS-board 4x GOL-board 1x

Full or half module GOL/OTIS board design is made in such a manner that it can switch from left to right

Stacking of boards 2 planes of 64 channels 32 channel HV-boards Each HV-board connects 2 ASD-boards 2 ASD-boards connect L or R OTIS OTIS-board L and R version GOL-board connects 4 OTIS-boards front and back plane

FE-box connection Fast replacement FE-box is fully decoupled from chamber full HV-enclosure Forces from gnd-spring are not on chamber Gnd spring over full width 128 gnd contacts on each side

FE box overview

Frame 3D

Cooling Location of dissipating areas Heat transport trough the frame Heat transport from chips to frame measurements

Dissipating areas Location of dissipating areas Heat transport trough the frame Heat transport from chips to frame

ASDBLR COOLING CONSTRUCTION

PACKAGED FRONT END COOLING TEST The Front Ends of the Outer Tracker are closely packed, heat must be extracted with cooling water along the Aluminium cooling extension plate. For the test we use a cooling block with forced air Several sensors monitor heatup of components.

Proto Outer Tracker Front-End Tests 15 EFNI H K 35 C Otis 52 C ASDBLR NTC on copper 42C ASDBLR Input Diode 43C RESULTS AFTER SETTLING

Hours COOLING BASE 6321 RED ASDBLR NTC ON Copper Board SURFACE 42C BASEPLATE THERMOMETER 35C t=0 >power on REMARKS: 1.forced air cooling base with regulators, shifts 10C 2.ASDBLR steps up 5C in 2 minutes, then settles to 7C above plate 3. OTIS settles 17C above cooling flap part of baseplate OTIS Copper NTC 52C BLUE ASDBLR DIODE ~43C ASDBLR 17C 8C FIRST IMPRESSION FROM PAPER RECORDERS AFTER POWER SWITCH ON

FE- interfaces - 128p Conn to chamber - Ins/extr. mechanism - Cooling-block - 4x Gaspipes - LV - 4x HV - Slow-controls - Fiber-connection

Total amount of components 450 FE Boxes needed for the entire detector including 10% spare 133 mechanical components and 17 boards in one FE box 150 components/box Total 450x150 gives components Order to be placed june 2005